Informs That NEDC-32162, Peach Bottom...SAFER/GESTR-LOCA Analysis, Class III Will Be Considered Proprietary & Withheld from Public Disclosure,Per 930330 Affidavit
ML20044E626
Person / Time
Site: Peach Bottom  
Issue date: 05/14/1993
From: James Shea
Office of Nuclear Reactor Regulation
To: Recasha Mitchell
GENERAL ELECTRIC CO.
References
NUDOCS 9305250254
Download: ML20044E626 (5)


Text

c.

,~

  1. MGti

.., r t

UNITED STATES

-1

[

j NUCLEAR REGULATORY COMMISSION

)

'2 WASHINGTON. D.C. 20566-0001

=i May 14, 1993 l

Docket Nos. 50-277 and 50-278 Mr. Robert C. Mitchell Project Manager-Safety and Communications General Electric Company 175 Curtner Avenue San Jose, California 95125

Dear Mr. Mitchell:

By letter dated March 18, 1993, Philadelphia Electric Company (PECo) reported i

a change to the evaluation model used to analyze.a loss-of-Coolant Accident for Peach Bottom Atomic Power Station (PBAPS) Units 2 and 3.

In the March 18, 1993, letter, PECo committed to submit the revised analysis to-the NRC by April 12, 1993.

By letter dated April 7,1993, PECo submitted NEDC-32163P, " Peach Bottom Atomic Power Station Units 2 and 3 SAFER /GESTR-LOCA Loss-of-Coolant Accident Analysis," Class III, dated January 1993.

Included in PEco's submittal was your affidavit dated March 30, 1993, requesting that NEDC-32163P be withheld from public disclosure pursuant to 10 CFR Part 2.790.

mandatory public disclosure for the following reasons:

You stated that the submitted information should be considered exempt from l.

The information discloses a process, method, or apparatus, including supporting data and analyses, where prevention.of its use by General Electric's competitors without a license from' General Electric constitutes a competitive economic advantage over other companies.

2.

The information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance-of quality, or licensing of a similar product.

--We have reviewed your application:and the material in accordance with the-

- requirements of 10 CFR 2.790 and, on the basis of General Electric's statements, have determined that the submitted information sought to be-withheld contains trade secrets or proprietary commercial-information.

.j

.i Therefore, NEDC-32162P, entitled " Peach Bottom Atomic Power Station Units 2

-l and 3, SAFER /GESTR-LOCA Loss-of-Coolant Accident Analysis," Class-III, L dated i

January 1993, marked as proprietary, will be withheld from public. disclosure pursuant 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of7 1954, as amended.

9305250254 930514 PDR ADOCK 05000277 i

P PDR.

h h$151 MidiA WI1 i

1 0 L'

l i

Mr. Robert C. Mitchell May 14, 1993 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.

If the need arises, we may send copies of this information to our consultants working in i

this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available l

for public inspection, you should promptly notify the NRC.

You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.

In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any i

public disclosure, Sincerely,

/s/

Joseph W. Shea, Project Manager Project Directorate I-2 l

Division of Reactor Projects - I/II i

Office of Nuclear Reactor Regulation l

I cc:

See next page i

I DISTRIBUTION Docket File l

NRC & Local PDRs P01-2 Reading SVarga JCalvo CMiller JShea j

M0'Brien OGC-MPSiemien i

RJones ACRS(IO)

EWenzinger, RGN-I l

CAaderson. RGN-I

_q l

PDiIf(A PDI-2/k{My ShBC I

OGC nC PDI-2/D.a OFFICE it i -

FF NAME M0'Brien JShen rb RJones MPSiemien

.(Miller DATE

'$ /'b/93

' /28/93 k /d/93 h@/93 6/M/93 1

+

Mr. Robert C. Mitchell May 14, 1993 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.

If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC.

You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.

In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

Sincerely,

/S/

Joseph W. Shea, Project Manager Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc:

See next page DISTRIBUTION Docket File NRC & Local PDRs PDI-2 Reading SVarga JCalvo CMiller JShea M0'Brien OGC-MPSiemien RJones ACRS(10)

EWenzinger, RGN-I CAnderson, RGN-1 p

0FFICE PD{kA PDI-2/ M db/BC OGC g

PDI-2/D a it t V V

NAME M0'Brien JShea:rb RJones MPSiemten

,(Miller

$/ h93

/d/93 k /d/93 M 93 h/d/93 DATE I

i L

- 4

-t Mr. Robert C. Mitchell May 14, 1993 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.

If the need i

arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information frou public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC.

You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a F eedom of Information Act request includes your information.

In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

Sincerely, vplL) 7 ose)h W. Shea, Project Manager Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation j

cc:

See next page i

r i

i I

r 4

4 I

Peach Bottom Atomic Power Station, Units 2 and 3 cC:

J. W. Durham, Sr., Esquire Mr. William P. Dornsife, Director Sr. V.P. & General Counsel Bureau of Radiation Prot ection Philadelphia Electric Company Pennsylvania Department of 2301 Market Street, S26-1 Environmental Resources Philadelphia, Pennsylvania 19101 P. O. Box 2063 Harrisburg, Pennsylvania 17120 Philadelphia Electric Company ATTN: Mr. D. B. Miller, Vice President Board of Supervisors Peach Bottom Atomic Power Station Peach Bottom Township Route 1, Box 208 R. D. #1 Delta, Pennsylvania 17314 Delta, Pennsylvania 17314 i

Philadelphia Electric Company Public Service Commission of Maryland ATTN:

Regulatory Engineer, Al-25 Engineering Division Peach Bottom Atomic Power Station ATTN:

Chief Engineer t

Route 1, Box 208 231 E. Baltimore Street Delta, Pennsylvania 17314 Baltimore, MD 21202-3486 a

Resident Inspector Mr. Richard McLean

+

U.S. Nuclear Regulatory Commission Power Plant and Environmental Peach Bottom Atomic Power Station Review Division P.O. Box 399 Department of Natural Resources Delta, Pennsylvania 17314 B-3, Tawes States Office Building Annapolis, Maryland 21401 Regional Administrator, Region I U.S. Nuclear Regulatory Commission Mr. George A. Hunger, Jr.

475 Allendale Road Director-Licensing, MC 52A-5 King of Prussia, Pennsylvania 19406 Philadelphia Electric Company Nuclear Group Headquarters Mr. Roland Fletcher Correspondence Control Desk Department of Environment P.O. Box No. 195 t

201 West Preston Street Wayne, Pennsylvania 19087-0195 Baltimace, Maryland 21201 Car'

. Schaefer External Operations - Nuclear Delmarva Power & Light Company P.O. Box 231 Wilmington, DE 19899

~

.