ML20044E508
| ML20044E508 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 05/05/1993 |
| From: | Merschoff E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hairston W GEORGIA POWER CO. |
| References | |
| NUDOCS 9305250095 | |
| Download: ML20044E508 (4) | |
Text
,
e MAY 0 51993 Docket Nos. 50-321, 50-366 License Nos. DPR-57, NPF-5 Georgia Power Company ATIN:
Mr. W. G. Hairston, III Senior Vice President Nuclear Operations P. O. Box 1295 Birmingham, M 35201 I
Gentlemen:
SUBJECT:
CONFIRMATION OF MEETING - HATCH UNIT 1
~
This confirms the arrangements made between Mr. Tom Beckham, Jr., of your staff and Mr. P. H. Skinner of my staff on May 3,1993, concerming a management meeting to be conducted on May 19, 1993, in the NRC Region 11 Office at 1:00 p.m.
The purpose of this meeting will be for you to discuss operator performance involving a Loss of Shutdown Cocling event that occurred on April 14, 1993.
In particular you should be prepan ed to discuss the operations personnel attentiveness to activities associated with the shutdown cooling process and to discuss the lack of monitoring key paramoters, including alarm capabilities.
In addition, your discussion should include plans to preclude a future loss of shutdown cooling as well as plans to monitor key parameters and provide alarms to the operators.
Should you have any questions concerning this arrangement, we will be pleased to discuss them.
l Sincerely,
{)At3, pq),gr i/ 0s l -
FSt4t,s Y
a i
Ellis W. Merschoff, Director i
Division of Reactor Projects 1
cc:
See page 2 l
9305250095 930505 PDR ADOCK 05000321 l1 g:
s PDR y
i IEo/
\\
Georgia Power Company 2
cc:
R. P. Mcdonald, Executive Vice President,-Nuclear Operations Georgia Power Company l
P. O. Box 1295 Birmingham, AL 35201 J. T. Beckham h
Vice President, Plant Hatch Georgia Power Company P. O. Box 1295 Birmingham, AL 35201 H. L. Sumner General Manager, Plant Hatch 3
i Georgia Power Company Route 1, Box 439 Baxley, GA 31513 l
I S. J. Bethay Manager Licensing - Hatch t
Georgia Power Company P. O. Box 1295 Birmingham, AL 35201 Ernest L. Blake, Esq.
Shaw, Pittman, Potts and Trowbridge t
2300 it Street, NW Washington, D. C.
20037 3
Charles H. 3adger j
Office of Planning and Budget Room 610 270 Washington Street, SW AtlLnta, GA 30334 Harold Reheis, Director Department of Natural Resources 205 Butler Street, SE, Suite 1252 Atlanta, GA 30334 i
Thomas Hill, Manager f
Radioactive Materials Program E
Department of Natural Resources 4244 International' Parkway Suite 114 Atlanta, GA 30354 l
cc:
See page 3
1 MAY 0 51993 Georgia Power Company 3
cc:
Continued Chairman Appling County Commissioners County Courthouse Baxley, GA 31513 Dan H. Smith i
Vice President Power Supply Operations Oglethorpe Power Corporation 2100 E. Exchange Piace Tucker, GA 30085-1349 Charles A. Patrizia, Esq.
Paul, Hastings, Janofsky & Walker 12th Floor 4
1050 Connecticut Avenue, NW t
Washington, D. C.
20036 bcc:
K. N. Jabbour, NRR i
A. R. Herdt, RIl l
P. H. Skinner, RII Document Control Desk i
NRC Resident Inspector i
U.S. Nuclear Regulatory Commission i
Route 1, Box 725 Baxley, GA 31513 l
l i
1
- FOR PREVIOUS CONCURRENCE SEE ATTACHED RII
- PSkinner 05/ /93 i
s 1
t
/
l i
Georgia Power Company 3
i cc:
Continued Chairman Appling County Commissioners County Courthouse l
Baxley, GA 31513 i
Dan H. Smith Vice President Power Supply Operations Oglethorpe Power Corporation i
2100 E. Exchange Place Tucker, GA 30085-1349 Charles A. Patrizia, sq.
i Paul, Hastings, Jan sky & Walker 12th Floor 1050 Connecticut venue, NW Washington, D.
20036 bcc w/ene-M
/'
[
K. N. Jabbour, NRR A. R. Herdt, fl l
P. H. Skinne, RII Document C itrol Desk NRC Resjdent Inspector U.S. l clear Regulatory Commission Rout 1, Box 725 i
Bay ey, GA 31513
/
r
/
l I
i I
L PSkinner 05/g/93
{
l
[
i-
.