ML20044E255

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-440/93-08 on 930419-23.No Violations Noted
ML20044E255
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 05/19/1993
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Stratman R
CENTERIOR ENERGY, CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20044E256 List:
References
NUDOCS 9305240109
Download: ML20044E255 (2)


See also: IR 05000440/1993008

Text

.-

.

_

_ ..

-

,.

-

~ _ ~ . . ~ ,

. , - - -

. , . . , . . = .

-

i-

g arceg

UNITED STATES

{

y

'

k

NUCLEAR REGULATORY COMMisslON

!

y1

f

p,

REGION lit

7,

f

' 799 ROOSEVELT RO AD

i

$

4

GLEN ELLYN, ILLINOIS 60137

i

'% . . + +o#

1

MM i ti 1993

1

+

t

Docket No. 50-440

!

t

Centerior Energy

i

ATTN: Mr. R. A. Stratman

i

Vice President-Nuclear

!

i

l

Perry Nuclear Power Plant

!

c/o The Cleveland Electric

Illuminating Company

i

10 Center Road

i

Perry, OH 44081-9514

i

!

Dear Mr. Stratman:

I

!

This letter refers to the inspection conducted by Mr. T. Tella and others of

I

this office on April 19 through 23, 1993. The inspection included a review of

i

authorized activities for your Perry Nuclear Power Plant facility. - At' the

!

conclusion of the inspection, the findings were discussed with those members

l

of your staff identified in the enclosed report.

i

Areas examined during the inspection are identified in the inspection report.

l

The inspection included an assessment and evaluation of your support and

l

implementation of maintenance activities. Within these areas, the inspection

consisted of a selective examination of procedures, representative records,

i

interviews with personnel and observation of activities in progress.

I

i

No violations of NRC requirements were identified during the course of this

inspection.

l

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

'

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

l

l

Sincerely,

,

'

"

< G. C. Wright, Chief

Engineering Branch

Enclosure:

Inspection Report

l

No',50 4,40/93008(DRS)

7

  • GU

(

See Attache

istribution

.

i

,

1

l

9305240109 930519

lf

.

PDR- ADOCK 05000440

G

PDR

\\ l

'

01MtMd

.

-

.

_

.

__. . . . . , . _ . . . _ . _ . . _ . . _ _ _ _ _

'

i

i

-

I

i

Centerior Energy

2

MAy y g.1993

i

Distribution

cc w/ enclosure:

F. R. Stead, Director, Nuclear

4

Support Department

D. P. Igyarto, Plant Manager,

Perry Nuclear Power Plant

K. P. Donovan, Manager,

-

Licensing and Compliance Section

S. F. Kensicki, Director, Perry

l

Nuclear Engineering Dept.

1

H. Ray Caldwell, General

,

Superintendent, Nuclear

Operations

,

OC/LFDCB

'

Licensing Project Manager, NRR

-

Resident Inspector, RIII

!

Terry J. Lodge, Esq.

!

James R. Williams, State of Ohio

Robert E. Owen, Ohio

Department of Health

A. Grandjean, State of Ohio,

i

Public Utilities Division

Clinton SRI

i

i

5

$

1

,

a

1

4

l

1

4

i

I

1

\\i

.

- - - - .