Forwards Insp Repts 50-277/93-09 & 50-278/93-09 on Stated Dates Ending 930505.No Violations Noted
ML20044E214
Person / Time
Site: Peach Bottom  
Issue date: 05/14/1993
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20044E215 List:
References
NUDOCS 9305240071
Download: ML20044E214 (10)


See also: IR 05000277/1993009

Text

l'C3

~

,

i

MY I 41993

Docket Nos. 50-277

50-278

Mr. D. M. Smith

Senior Vice President-Nuclear

Philadelphia Electric Company

i

Nuclear Group Headquarters

Correspondence Control Desk

P. O. Box 195

Wayne, Pennsyhania 19087-0195

Dear Mr. Smith:

SUBJECT: COMBINED INSPECTION REPORT NUMBERS 50-277/93-09:50-278/93-09

This refers to the safety inspection of fire protection activities conducted by Mr. A. Finkel of

i

i

this office from April 26-28, April 30 and May 3-51993, at the Peach Bottom Units 2 and

3, Delta, Pennsylvania, of activities authorized by NRC License Nos. DPR-44 and DPR-56

,

and to the discussions of our findings held by Mr. A. Finkel with Mr. T. Furlong and other

members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region 1 Inspection Report,

which is enclosed with this letter. Within these areas, the inspection consisted of selective

examinations of procedures and records, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection, no issues affecting public health and safety, nor any

violations of NRC requirements were observed.

No reply to this letter is required. Your cooperation with us in this matter is appreciated.

Sincerely,

Original SW S

les H. Eb

_

Lee H. Bettenhausen, Chief

Operations Branch

,

l

9305240071 930514

Division of Reactor Safety

'

PDR

ADOCK 05000277

PDR

OFFICIAL RECORD COPY

G:PB9309. INS

4

'

0\\

i

\\(4

i

i

'

!

-

.

Mr. D. M. Smith

2

MAY 141993

Enclosure: Combined NRC Region I Inspection

Report Numbers 50-277/93-09 and

l

50-278/93-09

cc w/ encl:

J. Doering, Chairman, Nuclear Review Board

D. B. Miller, Vice President, Peach Bottom Atomic Power Station

G. Rainey, Vice President, Nuclear Services Department

G. Cranston, General Manager, Nuclear Engineering Division

C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.

K. P. Powers, Plant Manager, Peach Bottom Atomic Power Station

A. J. Wasong, Manager, Experience. Assessment

G. A. Hunger, Jr., Manager, Licensing Section

J. W. Durham, Sr., Senior Vice President and General Counsel

J. A. Isabella, Directcr, Generation Projects Department,

Atlantic Electric

B. W. Gorman, Manager, External Affairs

R. McIcan, Power Plant Siting, Nuclear Evaluations

'

D. Poulsen, Secretary of Harford County Council

R. Ochs, Maryland Safe Energy Coalition

J. H. Walter, Chief Engineer, Public Service Commission of Maryland

Public Document Room (PDR)

I2) cal Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2)

NRC Resident Inspector

Commonwealth of Pennsylvania

TMI - Alert (TMIA)

bec w/ encl:

Region I Docket Room (with concurrences)

i

!

.

,

OFFICIAL RECORD COPY

G:PB9309. INS

.

. .

- - -

-

'

.

.

Mr. D. M. Smith

3

FAY 141993

bec w/ encl: (Via E-Mail)

V. McCree, OEDO

'

J. Shea, NRR

C. Miller, PDI-2, NRR

L. Bettenhausen, DRS

N. Blumberg, DRS

A. Finkel, DRS

DRS File

0

'\\

7'

$6

DRS:RI

DRS:RI

D

Ill

DRS:RI

FL

Blumberg

, $s

ausen

05/10/93

05/9/93

05/ h93

05//fl93

l

l

OFFICIAL RECORD COPY

G:PB9309. INS

'

i

i