ML20044D669
| ML20044D669 | |
| Person / Time | |
|---|---|
| Site: | 05200001 |
| Issue date: | 05/14/1993 |
| From: | Marriott P GENERAL ELECTRIC CO. |
| To: | Borchardt R NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19311B035 | List: |
| References | |
| MFN-075-93, MFN-75-93, NUDOCS 9305200136 | |
| Download: ML20044D669 (2) | |
Text
..
i
(
..-4 v
. GE Nuclear Energy i
l.
i l
i
\\
cern tw=x comin 75 ra*7m Arnon %s' Juse CA 9b125 l
May 14,1993 t
MFN No.075-93 Docket No. STN 52-001 t
'f I
l Document Control Desk U.S. Nuclear Regulatory Commission l
Washington, D.C. 20555 Attention:
Richard Borchardt, Acting Director Standardization Project Directorate
Subject:
Submittal of Amendment 28, Proprietary Information, to GE's ABWR SSAR j
Reference:
Submittal of Amendment 28 to GE's ABWR SSAR, MFN No.
{
074 93, dated May 4,1993
Dear Mr. Borchardt:
i Enclosed are thirty-four copies of selected sections of Appendix 19F of the Standard Safety
{
Analysis Report (SSAR) for the Advanced Boiling Water Reactor (ABWR).
l Please note that this information is designated as General Electric Company proprietary information. These pages are primarily corrections or additions to earlier proprietary submittals i
and the proprietary affidavits under which they were originally issued and applicable to. these l
pages.
i t
Sincerely, l
P. W. h abott, Manger Safety & Licensing l
M/C 444, (408) 925-6948 m
R.C Berglund (GE)
T.E. Murley (NRC)
D.M. Crutchfield (NRC)
DJ. McGoff (DOE)
F.J. Miraglia, Jr.
(NRC)
//
C. Poslusny, Jr.
(NRC)
/t M
K.E. Stahikopf (EPRI)
T }'.
~
F. A. Ross (DOE)
N.D. Fletcher (DOE)
L(OIO
/M' h(
/8 200001) 8M io g
9305200136 930514 PDR ADOCK 05200001 A
~
3, i
Amendment 28 - Proprietary Change Instruction The following Chapters and Appendixes have been changed, please make the specified changes in your SSAR.
REMOVE AQQ APPENDIX 19F Section 19F.1 Section 19F.1 Thru Thru Section 19FA.2 Section 19FA.2 l
l l
l May 14,1993