ML20044D151

From kanterella
Jump to navigation Jump to search
Forwards Public & Central Files Versions of Revised Epips. Central Files Version of 2-50-5, Emergency Notification Withheld
ML20044D151
Person / Time
Site: Maine Yankee
Issue date: 05/07/1993
From:
Maine Yankee
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19311B019 List:
References
NUDOCS 9305170289
Download: ML20044D151 (1)


Text

.-

Proc. No. 0-06-1 Rev. No. 1 Page 5 of 6 DOCUMENT CONTROL DESK COPY NUMBER:

U.S.N.R.C., VASHINGTON ATTACHMENT A l

?

MAINE YANKEE CONTROLLED DOCUMENT TRANSMITTAL FORM Page 1 of 2 j

DOCUMENT:

2.50 IMPLEMENTING PROCEDURES TO THE EMERGENCY PLAN i

TRANSMITTAL ISSUE DATE: 05-07-93 TRANSMITTAL RETURN DATE:

06-21-93

  • l i

2 1.

Please remove existing 2.50 Series Index, IMPLEMENTING PROCEDURES TO THE l

EMERGENCY PLAN, and replace with attached Page 1, dated 05-07-93.

4 2.

Remove existing Proc. No. 2-50-5, EMERGENCY NOTIFICATION, Rev. No. 5 and replace i

with attached Proc. No. 2-50-5, (same title), Rev. No. 6 (which incorporated TPC l

  1. 93-077), Pages 1 - 10.

j 3.

Remove existing Proc. No. 2-50-7, TSC OPERATION, Rev. No. 2 and replace with attached Proc. No. 2-50-7, (same title), Rev No. 3, Pages 1 - 14.

i 4.

Remove existing Proc. No. 2-50-8, OSC OPERATION, Rev. No. I and replace with attached Proc. No. 2-50-8, (same title), Rev. No. 2, Pages 1 - 26.

5.

Remove existing Proc. No. 2-50-9, EOF OPERATION, Rev. No. 2 and replace with attached Proc. No. 2-50-8, (same title), Rev. No. 3, Pages 1 - 11.

The above listed document has been insertec into your assigned manual / file and all superseded pages have been destroyed.

MANUAL / FILE UPDATED BY:

DATE:

The undersigned acknowledges completion of the following:

1 The receipt and review of the revised material.

SIGNATURE OF HOLDER:

DATE:

130059 CAUTION Manual Holders who do not sign and return this transmittal form to Document Control on or before the required return date may be required to return their controlled manual (s) to Document Control. Reissuance shall require Department Manager or higher management approval.

Please return to: MAINE YANKEE ATOMIC POWER COMPANY Document Control Center P.O. Box 408 Wiscasset, Maine 04578

,E 4e '9,/

t 0

lSY5800080888%

()ktgv t&d PA" pr i

i PDR V

Q j $9