Corrects Info in Special Rept 1-93-3,transmitted Via Re Number of SG Tubes Plugged During 1R4.Due to Administrative Oversight,Rept Submitted Four Days Late. Inservice Insp Completed on 930403
ML20044C895
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 05/06/1993
From: Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
1-93-3, LCV-0005, LCV-5, NUDOCS 9305130223
Download: ML20044C895 (1)


Text

4 Gewg a Poe Campany 40 invemess Cemer Pa%ay Post 0 fee Bm '295 Bammvan Naban a 35201

, T eie; dye 205 877 7122 m

GeorSla Power C. K. McCoy vuemowox-vaga evect May 6, 1993 LCV-0005 Docket No.

50-424 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:

VOGTLE ELECTRIC GENERATING PLAh7 SPECIAL REPORT l-93-3 NUhiBER OF STEAhi GENERATOR TUBES PLUGGED DURING 1R4 By letter dated April 22,1993, (ELV-05413) Georgia Power Company submitted Special Report 1-93-3 regarding four tubes that were plugged in steam generator No. 3 during the Unit I founh refueling outage (IR4). This letter stated that the inservice inspection was completed on April 3, 1993, and Technical Specification 4.4.5.5.a requires that the number of tubes plugged in each steam generator be reported to the Commission in a special report to be submitted within 15 days following the completion of each inservice inspection of steam generator tubes. Due to an administrative oversight, this sp;cial report was submitted four days late. We apologize for any inconvenience that this may have caused.

Sincerely, C. K. McCoy CKhi/NJS