January 15, 1993 MEMORANDUM FOR: NRR Division Directors FROM:
James G. Partlow Associate Director for Projects f
Office of Nuclear Reactor Regulation William T. Russell Associate Director for Inspection and Technical Assessment Office of Nuclear Reactor Regulation
SUBJECT:
SCREENING LICENSE AMENDMENT REQUES1S AND PROCESSING GENERIC TECHNICAL SPECIFICATION CHANGES INTRODUCTION Thi.s memorandum establishes a combined ADP panel to screen incoming Technical Specification (TS) amendment requests in a formal and structured manner..The-amendment screening panel will consist of members-from DRPE, DRPW,-OTSB,.and-technical branches as required. The screening panel will implement the guidance-of the Partlow-Russell memorandum dated June 1, 1992, with the intent of identifying those proposed amendments that are applicable to a number of.
licensees (generic) and ensuring that such generic amendments are' evaluated only once.
The screening panel represents a pilot program to develop consistent screening n
criteria and provide feedback to continually-improve the TS amendment..
evaluation and approval process. Specifically,.0ffice Letter #803, Technical Specifications Review Procedures, will be revised to incorporate' improvements' in the evaluation and approval process.
BACKGROUND.
In an effort to make more effective and efficient use of staff resources (Projects and Technical Assessment), guidance on screening TS amendment requests was provided by the Partlow-Russell memorandum dated June 1, 1992.
An amendment screening panel was formed by DRPW in July 1992, with DRPE observing and forming a similar trial panel-in August. - The focus of.the.
screening process remains to ensure that:TS amendments applicable to a number
~'of plants (generic) are evaluated only once. An additional benefit will be gained as licensees move toward adopting the-revised Standardized Technical Specifications (rSTS) and their amendment requests are processed more efficiently.
4 g 3040N 3 N m.
- ==%
p of* j ww
o NRR Division Directors
- January 15, 1993 DISCUSSION To ensure consistent implementation of the guidance contained herein, a screening panel is established for ADP (with ADT support). The ADP screening
-panel will receive TS amendment applications that are _ forwarded to it from licensing PMs.
The screening panel will track amendments received, verify the PM's determination of generic applicability, and document and notify the PM of the panel's determination.
The panel will also provide feedback to improve the amendment review process.
GUIDANCE 1.
All incoming TS amendment requests dated on or after November 1, 1992 are the subject of this guidance. DRPW has screened their incoming amendments to this date; a separate memorandum will address the DRPE plan to screen their incoming amendment requests received between June 1 and October 31, 1992.
(Earlier amendment requests will be considered for screening as time, resources and applicability justify.)
2.
Licensing PMs will complete an Amendment Tracking Form and forward a copy of it and the amendment request to the screening panel as instructed in Enclosure.
(PMs should decide if the amendment is sufficiently time-sensitive to sholly while awaiting the panel's decision.)
3.
Screening panel members will include:
a.
DRPE and DRPW co-chairs (2) b.
One Senior PM each from DRPE and DRPW (2) c.
One PE each from DRPE and DRPW (2) d.
At least one representative from the Technical Specifications Branch (1+)
e.
One Technical Specialist from ADT on request from one of the co-chairs f.
PM(s) who have been requested by the Panel +o discuss their amendment (s) 4.
Screening panel co-chairs will convene a panel meeting approximately every two weeks. Meetings will be held at a convenient time and place and will be announced approximately three working days in advance.
5.
For amendments requested on an exigent basis, PMs should contact their respective panel co-chair for immediate assistance on screening.
6.
For amendments requested on an emergency basis, PMs should screen the amendment as if it were a routine amendment request, after completion of staff work on the emergency TS amendment.
a
/
.y NRR Division Directors january _ 15, 1993 RESPONSIBILITIES AND AUTHORITIES 1.
ADP and ADT provide management oversight.
2.
DRPE and DRPW provide ADP and ADT with quarterly updates and recommendations on program improvements, and each will assign:
a.
a screening panel co-chair b.
a SeniLr Project Manager T
c.
a Project Engineer 3.
a.
complete Amendment T~acking Forms r
b, supply completed Amendment Tracking Form and copy of amendment to their respective (DRPE or DRPW) Project Engineer 4.
Project Managers will:
a.
complete an Amendment Tracking Form for each amendment request received from their licensee b.
forward a copy of amendment and Amendment Tracking Form to their respective PE c.
sholly amendment (if time-sensitive) while awaiting panel notification 5.
Project Engineers will:
a.
track amendment requests b.
distribute amendment copies among panel members c.
make notifications of panel meeting schedule
~
d.
prepare and 61stribute panel meeting summaries with assistance of'and approval by panel co-chairs and 0TSB representative (s) e.
coordinate (with OTSB) input to amendment historical database 6.
Panel Co-chairs will:
a.
schedule panel meetings j
y i
j
_-NRR Division Directors
.4 -
January-15,-1993
~
e b.
assign a primary reviewer (panel member) to each amendment c.
schedule technical branch representation ~ at panel meetings-d.
provide feedback to PMs (via DRPE and DRPW) to~ improve-amendment screening The first panel meeting will be scheduled in January.
If-you have any questions, please contact Cal Moon at 504-3136, Sheri Peterson at 504-1325; or~
Ed Trottier at 504-1427.
Original signed by:
James G. Partlow Associate Director-for Projects Office of Nuclear Reactor Regulation Original signed by J.E. Richardson for:
William T. Russell Associate Director for Inspection and Technical Office of Nuclear Reactor Regulation
Enclosure:
License Amendment Screening Criteria DISTRIBUTION:
Central File SPeterson
.PDI-3 Reading MVirgilio JPartlow" CGrimes WRussell BGrimes SV_arga WButler JCalvo TClark
-JRoe.
EHTrottier h
- See previous concurrence i
0FFICE PDI-31LA PDI-[PM PDIND
- PDV:PM' ADR4-5
, D D EW I
NAME MM M
WButler SPeterson MVikiohRM DATE
/ft /k/92-kdf/k 1%/El/92 12/18/92 lA hn/92 U 92 '
/
0FFICE-C:0TSB,_ Dh/
ADRI j.44 D:DRPE /7k dQPw ADQ((
NAME' CGrime N BYimes JCalv[
SVargaE'hNarMow NRksell
\\ A /92
///7/92 DATE-11/ $ 92 lL/t /92
/ / f-/92
/ /#-/92 -
f
3 x
,%l awary 10 1993.
- NRR Division Directos '
- b.. assign _a' primary reviewer (panel member) to each amendment
- c.._ schedule. technical branch representation at panel. meetings d.
provide feedback'to PMs (via DRPE and-DRPW) to' improve-amendment screening.
The first panel meeting will be scheduled in January.
If you have any questions, please contact Cal Moon at 504-3136,. Sheri Peterson.at 504-1325,.or Ed Trottier at 504-1427.
1Q Jume G..Partlow Associate Director for Projects Office _of Nuclear Reactor Regulation
'A
[b liiam T. Russell Associate Director for Inspection -
and-Technical Assessment-Office of Nuclear' Reactor Regulation
Enclosure:
License Amendment Screening
~
Criteria l
l
?
i 3
I
Enclosure LICENSE AMENDMENT SCREENING CRITERIA Using the Amendment Tracking Form and its Flow Chart (Attachments I and 2),
Licensing Project Managers should screen each incoming amendment request, using the following criteria and in the sequence indicated:
1.
Criterion: Would the amerdment make plant Technical Specicications like the revised Standard Technical Specifications (rSTS)?
Discussion: The revised Standard Technical Specifications (rSTS) are defined by the following NUREGS:
a.
Babcock and Wilcox NUREG-1430 b.
Combustion Engineering NUREG-1432 d.
General Electric (BWR-4)
NUREG-1433 e.
General Electric-(BWR-6)
NUREG-1434 A copy of these NUREGs can be found on floors 13 and 14 of OWfN, or on the Local Area Network Menu under "Z Tech Specs".
If the answer to Criterion I is YES, GO TO CRITERION 2.
1 If the answer to Criterion 1 is N0, GO TO CRITERION 3.
2.
Criterion: Would the amendment make plant Technical Specifications like an approved line item improvement?
Discussion: Attachment 3 to this Enclosure represents currently approved line item improvements (Generic Letters and Topical Reports). This list of line item improvements will be periodically updated.
If the answer to Criterion 2 is YES, PROCESS AMENDMENT (Complete Tracking Form and deliver to your panel PE with copy of amendment.)
If the answer to Criterion 2 is N0, complete Tracking Form and deliver to your panel PE with copy of amendment.
OTSB will determine proper disposition and so notify you.
3.
Criterion:
Is the amendment clearly applicable only to yin.r plant (plant i
specific)?
Discussion: Whether YES or N0, please use Tracking Form for a brief--
two or three sentence--discussion of your generic or plant specific determination, and provide a copy of amendment and Tracking Form to your panel PE.
)
AMENDMENTSCREENINGFLOWCHAQ-
-s.
1 Request for -
TS Amendment
- Process amendment n
..Yes.
If is it Revised STS includes:
like an I8 I B&W-NUREG-1430 Yes approved like revised
>w line-item W-NUREG-1431 CE - NUREG-1432 STS?
Improvement?'
GE-BWR4 - NUREG-1433 (1)
(2)-
GE-BWR6 - NUREG-1434 9
No No V
If Review as Does it Decision on No Yes clearly apply y
Disposition plant-specific c amendment.
only to your (OTSB Lead) plant?
(3)-
l 1
I I
i
___________________l l
I I
I
,.-_______L_______,
1-1 I
I T
Y Process
' Hold
. (Potential-Lead Plant) 1
~
- Complete an Amendment Tracking Fonn for each amendment request.
b:.
AMENDMENT TRACKING FORM 1.
Name of Plant (and unit, if applicable):
2.
Nuclear Steam Supply System (NSSS) vendor:
3.
Amendment dated 4.
TAC NO. and Priority M
5.
PM Name Phone 6.
Amendment title and brief description:
7a. If the amendment is like the rSTS, please give the NUREG number and title, and rSTS specification number that applies:
NUREG rSTS-
- b. If the " fit" is NOT EXACT, please describe the difference (s).
For example, where and how is differencc substantive, or is difference merely editorial?
- c. If not at all like the rSTS, go to #9 below.
Ba If the amendment is like an approved line-item improvement, please give the number and subject from Attachment 3 that your amendment fits:
G.L.
Topical. Report
- b. If the " fit" is NOT EXACT, please describe the difference (s).
For example, where and how is difference substantive, or is difference merely editorial?
- c. If not like an approved line-item improvement, panel will disposition.
- 9a. If plant specific, please give a brief two c: three sentence discussion of your determination.
b'. If generic, please give a brief -- two or three ' sentence -- discussion of your determination.
PANEL DECISION:
-l
t i
CURRENTLY APPROVED LINE ITEM IMPROVEMEtiTS I.
GENERIC LETTERS DATI 91 SUBJECT 6/04/87 87-09 Sections 3.0 and 4.0 of the Standard Technical Specifications (STS) on Applicability of Limiting Conditions for Operations and Surveillance 3/22/88 88-06 Removal of Organization Charts from Technical Specifications i
Admin strative Control Requirements 8/02/88 88-12 Removal of Fire Protection Requirements from Technical Specifications 10/04/88 88-16 Removal of Cycle-Specific Parameter Limits from Technical Specifications 01/31/89 89-01 Implementation of Programmatic Controls for Radiological Effluent
- Technical Specifications in the Administrative Controls Section of Technical Specifications and Relocation of Procedural Details.of RETS to-the.0ffsite Dose Calculational Manual or the Process Control Program 08/21/89 89-14 Removal of the 3.25 Limit on
-Extending Surveillance Intervals 12/11/90 90-09 Altirnative Requirements for Snubber Visual Inspection Intervals and Corrective Actions 01/04/91 91-01 Removal of the Schedule for Withdrawal of Reactor Material Specimens frcm Technical Specifications
2 of 4 04/02/91 91-04 Changes in Technical Specifications Surveillance Intervals to Accommodate a 24-month Fuel Cycle 05/06/91 91-08 Removal of Component Lists from Technical Specifications 06/27/91 91-09,
Modification of Surveillance Requirements for the Electric Protective Assemblies in Power Supplies for the Reactor Protection System 11/07/91 91-18 NRC Inspection Manual Guidance on Resolution of Degraded and-Nonconforming Conditions and Operability Determinations t
4 9
TOPICAL REPORTS 3 of 4 II.
TOPICAL REPORTS APPROVE 0 REPORT NO.
May 1986 WCAP-10271 Evaluation of Surveillance Frequencies and Out of Service Times for the Reactor Protection System Instrumentation, Supplement 1 Ju'. 1987 NEDC-30851P Technical Specifications Improvement Analysis for BWR Reactor Protection System Sep 1988 NEDC-30851P Technical Specifications Improvement-Analysis for BWR Reactor Protection System, Supplement 1 (Clarifying letter dated July 26, 1991)
Dec 1988 NEDC-30936P BWR Owners Group Technical Specifications Improvement Methodology-(wlth' Demonstration for BWR ECCS Actuation Instrumentation),
Parts 1 and 2 Dec 1988 BAW-10167 Justification for Increasing the Reactor Trip System On-Line Test Intervals Feb 1989 NEDC-30851P Technical Specifications Improvement Analysis for BWR Reactor' Protection System, Supplement 2 May 1989 WCAP-10271 Evaluation of Surveillance Frequencies and Out of Service Times for Engineered Safety-Features Actuation System, Supplement 2, Revision 1 Jun 1990 WCAP-10271 Evaluation of Surveillance Frequencies and Out of Service Times for the Reactor Protection System and Engineered Safety Features Actuation System, Supplement 2, i
Revision 1 (Revised)
June 1990 NEDC-31677P Technical Specifications Improvements-Analysis for BWR Isolation Actuation Instrumentation
-l
4 of 4
- Sep 1991 GENE-770-06-2 Addendum to Bases for Changes to Surveillance Test Intervals and Allowed Out-of-Service Times for Selected Instrumentation Technical Specifications-(BWR RCIC Instrumentation) 9 es"
4
- r 1:.
June 30,'1993 NOTE T0: Document Control Desk l
FROM:
James G.'Partlow,'ADP
SUBJECT:
RELEASE-0F DOCUMENT TO PUBLIC DOCUMENT ROOM 4
Attached document (Accession Number 9304080313)',- was inadvertently-left:
off distribution to the Public Document Room.
This document is approved.
o for release per conversation between Linda Kilgore and.Toni Gibbons of my
{
staff on' June 30, 1993.
ik Janes G. Partlow Associate Director for Projects