Text
_
. w
,/' %
-
UNITED STATES
e%
't
NUCLEAR REGULATORY COMMISSION
,
3
D .$
h
REGION V
'
' '
- [
1450 MARIA LANE
'%
WALNUT CREEK, CAUFORNIA 94596-5368
FEB 1 s 1993
I
Docket 50-344
License NPF-1
.
[-
Portland General Electric Company
121 SW Salmon Street
.
Portland, Oregon 97204
Attention:
Mr. James E. Cross
Executive Vice President
SUBJECT:
NRC INSPECTION REPORT 50-344/93-02
During the period of February 1 - 5, 1993, Mr. L. Cobler.tz of this office
conducted a routine inspection of activities authorized for your Trojan
Nuclear Plant. At the conclusion of the inspection, Mr. Coblentz discussed
our findings with members of your staff identified in the enclosed report.
Areas examined during this inspection are described in the enclosed report.
Within these areas, the inspection consisted of selective examination of
procedures and representative records, interviews with personnel, and
observations of activities in progress.
Based on the results of this inspection, certain of your activities appear to
be in violation of NRC requirements, as specified in the enclosed Notice of
Violation (Notice).
An area of your Radwaste Storage. Building in which
radiation levels exceeded 100 tillirem per hour was not properly posted as a
Our further review indicated, however, that this was an
isolated condition, and your corrective actions were prompt and thorough;.
therefore, a response to this violation is not required.
In addition, one licensee-identified violation, discussed in the enclosed
report, is not being cited because the criteria in Section V.G of the NRC
Enforcement Policy were met. No deviations were identified.
In accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy
of this letter and the enclosures will be placed in the NRC Public Document
Room.
Si cerely,
Ja
ee
12f
.
,
.
,
Fac lities Radiological Protection Branch
'
I
9303230049 930219
ADOCK 05000344
G
/A
{
.
fgV
,
L
h.
- .
,
'
2
Enclosures:
1.
2.
Inspection Report 50-344/93-02
cc w/ enclosures:
M. Featherston, Compliance Engineer
W. Williams, Compliance Manager
.
T. D. Walt, General Manager, Technical Functions
R. D. Machon, General Manager, Trojan Nuclear Plant
W. Robinson, Vice President, Nuclear
L. A. Girard, Vice President. and General Counsel
D. Stewart-Smith, Administrator, Siting and Regulations, DOE
,
i
f
b
b
_
.
.,
FEB 19.1993
3
bec w/ enclosures:
Docket File
Resident Inspector
Project Inspector
G. Cook
R. Huey
B. Faulkenberry
J. Martin
-
State of Oregon
bec w/o enclosures:
M. Smith
J. Zoll coffer
1
LCoble z
JRe
RHue
L/&/13
c9/heeM
g/7 gy
/
IREGUEST COPYl
IPh7Ei6ST COPY 1
IREGUEST COPY 1
1/YES) / N0 1
t/YES/ / NO 1 l'YES)/ N0 1
IsEND TO PDR 1 y
i
gM
)/ N0 1
.
$