ML20044C439
| ML20044C439 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom, Limerick |
| Issue date: | 03/09/1993 |
| From: | Bettenhausen L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Danni Smith PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| References | |
| NUDOCS 9303230038 | |
| Download: ML20044C439 (4) | |
Text
t
- g
- =.,.
x MAR S1993 Docket Nos. 50-352 50-353 50-277 50-278 Mr. D. M. Smith Senior Vice President -
Nuclear Philadelphia Electric Company Nuclear Group Headquarters Correspondence Control Desk P. O. Box 195 Wayne, PA 19087-0195
Dear Mr. Smi' :
SUBJECT:
10 CFR 50.54 QUALITY ASSURANCE PROGRAM CHANGE REVIEW
References:
1.
Letter dated December 3,1992, from Mr. D. M. Smith to the U. S. Nuclear Regulatory Commission msmitting Peach Bottom Atomic Power Station, Units 2 and 3, and Limerick Generating Station, Units 1 and 2, Request for Approval to Change the Quality Assurance Program Descriptions by Eliminating the Description of the Performance Assessment Section.
2.
Letter dated February 12, 1993, from Mr. C. L. Miller of the U. S. Nuclear Regulatory Commission to Mr. D. M. Smith, Concerning a Proposed Quality Assurance Program Change for Peach Bottom Atomic Power Station, Units 2 and 3, and Limerick Generating Station, Units I and 2.
We received your 10 CFR 50.54(a) submittal (reference 1), transmitting your proposed revision to the Operational Quality Assurance Plans for the Peach Bottom Atomic Power Station, Units 2 and 3, and the Limerick Generating Station, Units 1 and 2. The Region I staff reviewed this submittal and determined that additional clarifications were required as discussed in reference 2. Reference 2 also stated a meeting was scheduled to be held with your staff at Region I offices to further discuss the issue.
22000G~
OFFICIAL RECORD COPY G:PBLIMQA I
y
.In 9303230038 930309 5"
^" "
" &" s M-U-
Mr. D. M. Smith 2
IdAR 91993 Due to inclement weather and scheduling difficulties, the meeting scheduled with you; staff for February 26,1993, was cancelled. However, after further review of your submittal and a review of the clarifications provided by your staffin the form of telephone conversations, the Region I staff has found the changes to the Operational Quality Assurance Plans acceptable in that the Quality Assurance Programs continue to satisfy the criteria of Appendix B of 10 CFR Part 50. If there are changes to other operative QA commitments existing in docketed correspondence outside of the QA program descriptions, you are obligated to notify this office. Implementing such changes should be based on 10 CFR 50.54(a)(3). The effectiveness of your Quality Assurance Programs and procedure implementation will continue to be the subject of routine regional inspections.
If you have any questions concerning the above, please contact John Caruso at (215) 337-5175 or Norman J. Blumberg at (215) 337-5199.
Sincerely,.
Ji:
l b e il Lee H. Bettenhausen, Chief Operations Branch -
Division of Reactor Safety a
i
.3 i
i l
1 OFFICIAL RECORD COPY G:PBLIMQA l
L:
Mr. D. M. Smith 3
MAR S1993 cc:
R. Charles, Chairman, Nuclear Review Board D. R. Helwig, Vice President - Limerick Generating Station G. J. Beck, Manager - Licensing Section G. Madsen, Regulatory Engineer - Limerick Generating Station D. B. Miller, Vice President, Peach Battom Atomic Power Station G. Rainey, Vice President, Nuclear Services Department G. Cranston, General Manager, Nuclear Engineering Division C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.
K. P. Powers, Plant Manager, Peach Bottom Atomic Power Station A.. A. Fulvio, Regulatory Engineer, Peach Bottom Atomic Power Station J. W. Durham, Sr., Senior Vice President and General Counsel J. A. Isabella, Director, Generation Projects Department, Atlantic Electric B. W. Gorman, Manager, External Affairs R. McLean, Power Plant Siting, Nuclear Evaluations D. Poulsen, Secretary of Harford County Council R. Ochs, Maryland Safe Energy Coalition J. H. Walter, Chief Engineer, Public Service Commission of Maryland NRC Resident Inspector, Limerick Secretary, Nuclear Committee of the Board Public Document Room (PDR), Limerick Local Public Document Room (LPDR), Limerick Nuclear Safety Information Center (NSIC)
Public Document Room (PDR), Peach Bottom NRC Resident Inspector, Peach Bottom Commonwealth of Pennsylvania (2)
TMI - Alert (TMIA) i k
e OFFICIAL RECORD COPY G:PBLIMQA
D 91993
~ Mr. D. M. Smith 4
t bec:
Region I Docket Room (with concurrences)
L. Bettenhausen, DRS E. Wenzinger, DRP C. Anderson, DRP N. Blumberg, DRS N. Perry, SRI, Yankee Rowe DRS/EB SALP Coordinator (Limerick)
V. McCree, OEDO F. Rinaldi, NRR (Limerick)
DRS/EB SALP Coordinator (Peach Bottom)
J. Shea, NRR (Peach Bottom)
J. Cruso, DRS V. Curley (4)
DRS Files (4)
/
O A
NI:DRS NRR RI:DRS RI:DRS Caruso/dmg Shea Blumberg Bettenhausen 717/T3 03/f/93 03/[/93 03Q/93-03/03/93 Telecon OFFICIAL RECORD COPY G:PBLIMQA