Text
F
q
[g dEC
.
/b,
NUCLEAR REGULATORY COMMISSION
_f
,
[
R
}
'
REGION IV
,s.
611 RYAN PLAZA DRIVE, SUITE 400
o,
8
AR LINGTON, T E XAS 76011-8064
g
j
....+
1
MAR 171993
'
,
Dockets: 50-313
50-368
Licenses: DPR-51
NPF-6
.
Entergy Operations, Inc.
ATTN:
J. W. Yelverton, Vice President
Operations, Arkansas Nuclear One
Route 3, Box 137G
Russellville, Arkansas 72801
Gentlemen:
,
SUBJECT: NRC INSPECTION REPORT 50-313/93-01; 50-368/93-01
This refers to the inspection conducted by an NRC team from Region IV
accompanied by the NRR Project Manager on January 19-22 and February 8-12,
1993. The inspection included a review of activities authorized for your
Arkansas Nuclear One facility. At the conclusion of the inspection, the
~
findings were discussed with you and those members of your staff identified in
the enclosed report.
Areas examined during the inspection are identified in the. report. These
areas included reviews of modifications and design change packages, interviews
,
with personnel, and reviews of quality assurance audits _and assessments of the
engineering and technical support organization. Within these areas, the
i
inspection consisted of selective examination of procedures and representative
records, interviews with ~ personnel, and observation of activities in progress.
The results of this inspection are documented in the enclosed report.
'
It was identified that some drawing revision notices were not' incorporate'd
within the procedural limit of 7 days, which was in violation of Criterton V
of Appendix B to 10 CFR 50. This violation is not being cited because the
criteria specified in paragraph VII.B.1 of Appendix C to 10 CFR 2 of the NRC's
t
" Rules of Practice," were satisfied. This violation appeared to be an
'
isolated occurrence and the licensee staff took prompt and effective actions
i
to correct the problem and prevent recurrence.
It is our understanding that, during the exit meeting conducted on
February 12, 1993, you made a commitment to review a selection of calculations
.for hot water service relief valves to determine adequacy of sizing. The
subsequent inspection of your review of the sizing calculations is an
~
inspection followup item.
If your understanding of this commitment differs
from ours, please contact me immediately.
i
9303230018 930317
ADOCK 05000313
'
,
v
i
-
- - -
- -
-
-
-
- - -
- -
-
- - -
'
,_
y
.
- Entergy Operations, Inc.
-2-
,
i
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and its enclosure will be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will be pleased
[
to discuss them with you.
Sincerely,
('
/
,4ja A
l
amuel J. C9 ins, Direct r
Division of Reactor Safety
Enclosure:
Appendix - NRC Inspection Report
50-313/93-01 w/ attachments
50-362/93-01 w/ attachments
ec w/ attachments:
Entergy Operations, Inc.
ATTN: Donald C. Hintz, President &
Chief Operating Officer
P.O. Box 31995
Jackson, Mississippi 39286
Entergy Operations, Inc.
ATTN: John R. McGaha, Vice President
Operations Support
P.O. Box 31995
Jackson, Mississippi 39286
Wise, Carter, Child & Caraway
ATTN:
Robert B. McGehee, Esq.
P.O. Box 651
Jackson, Mississippi 39205
Entergy Operations, Inc.
ATTN: James J. Fisicaro
Director, Licensing
'
Route 3, Box 137G
Russellville, Arkansas 72801
,
Honorable Joe W. Phillips
County Judge of Pope County
Pope County Courthouse
Russellville, Arkansas 72801
-
. ~ . -
-
.
..
,
,
_
cc.
,
i
a
l
.
. i dntergy Operations, ' Inc.
-3--
'
l
~Winston &-Strawn
"
- ATTN: , Nicholas' S. Reynolds, Esq.
!
1400 L Street, N.W.
'i
Washington, D.C.
20005-3502
li
!
Arkansas Department of Health '
!
ATTN: Ms. Greta Dicus, Director
.l
'
Division of Radiation Control and
!
Emergency Management'
_
4815 West Markham Street
1j
Little Rock, Arkansas 72201-3867
-
B&W Nuclear Technologies
j
ATTN: Robert B. Borsum
-j
Licensing Representative
'
1700.RockJille Pike, Suite 525
Rockville, Maryland 20852-
I
Admiral Kinnaird R. McKee, USN (Ret)'
.
214 South Morris Street
l
0xford, Maryland 21654
l
ABB Combustion Engineering
Nuclear Power
-
ATTN: ' Charles B. Brinkman
~!
Manager, Washington
'
Nuclear Operations -
12300 Twinbrook Parkway, Suite 330
.
Rockville, Maryland 20852
4
i
>
P
,
l
!
-l
-i
'
i
,
i
i
.
+
.
.
.
. . .
.-
,
.
,
i
-s
i
jEntergyOperations,Inc.
-4-
i
l
i
bec to DMG (IE01) - DRS and DRP
bec distrib. by RIV:
J. L. Milhoan
Resident Inspector
.
Section Chief (DRP/A):
,
Lisa'Shea, RM/ALF, MS: MNBB 4503
MIS System
DRSS-FIPS
RIV File
l
Section Chief (DRP\\TSS)
1
Project Engineer (DRP/A)
T. F. Westennan:
R. K. Frahm Jr.
P. A. Goldberg
-j
W. McNeill
}
l
.t
i
h
-.
l
!
!
-!
'
i
lI
!
!
!
!
!
!
!
RIV:ATL*
VI:ES*
RI:ES*
RI:ES*
C:ES*
i
>
MFRunyan/lb
RKFrahmJr
PAGoldberg
WMMcNeill
TFWesterman
l
/ /93
/ /93
/ /93
/ /93'
/ /93
l
DD:DRS M
D':D$
D:DRS/ik ;y
V
I
ABBbh-
SJCollins
ATHowell
7 / 4 /93
3 /t /93
.)/0/93
- Previously concurred
.l
t
!
_
!
!
r
u
.
-
s
Entergy Operations, Inc.
-4-
i
bec.to DMB (IE01):.-;.DRS'and DRP'
.
bec distrib. by RIV:
J. L. Milhoan
Resident Inspector
Section Chief _(DRP/A)
Lisa Shea, RM/ALF, MS: MNBB 4503
MIS System
DRSS-FIPS
RIY File
Section Chief (DRP\\TSS)
Project Engineer (DRP/A)
T. F. Westerman
R. K. Frahm Jr.
P. A. Goldberg
W. McNeill
.l
~
l
1
i
'
1
RIV:ATL*
VI:ES*
RI:ES*
RI:ES*
C:ES*
MFRunyan/lb
RKFrahmJr
PAGoldberg
WMMcNeill
TFWesterman
/ /93
/ /93
/ /93
/' /93
/' /93
'
DD:DRS M
D:DPP
D:DRS//k,, j
ATHowell F
ABBbh
SJCollins
]
O/4/93
3 ' /it, /93
3/O/93
- Previously concurred
l
-[
..
,
.m