ML20044C329

From kanterella
Jump to navigation Jump to search
Forwards Neutron Monitoring Sys Design Evaluation,Per BWR Owners Group Licensing Topical Rept NEDO-31558, Position on NRC Reg Guide 1.97,Rev 3 Requirements for Post-Accident Neutron Monitoring Sys
ML20044C329
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 03/15/1993
From: Cottle W
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-REGGD-01.097, RTR-REGGD-1.097 GNRO-93-0032, GNRO-93-32, NUDOCS 9303220216
Download: ML20044C329 (10)


Text

{{#Wiki_filter:-~ ,' s l s. _ ~ENTERGY Entergy Operations,Inc. +. - se ita Goson MS 2750 To: 601437 6433 W. T. Cettie ~ . a F%uv i olFl' KDT Oav G. 'Acew Non March 15, 1993 U.S. Nuclear Regulatory Commission Mail Station P1-137 Washington, D.C.. 20555 Attention: Document Control Desk j i

Subject:

. Grand Gulf Nuclear Station [ Unit 1 Docket No. 50-416 License No. NPF-29. Grand Gulf Nuclear Station (GGNS) Plant Specific Design Evaluation for NEDO-31558 f GNRO-93/00032 .l Gentlemen: l On April 1, 1988 the BWR Owners Group submitted the Licensing Topical. Report; " Position on NRC Regulatory Guide 1.97, Revision 3 Requirements for Post-Accident Neutrcn Monitoring System (NEDO-31558)". This Topical: Report provided an event analysis of the neutron monitoring system functions for-post accident use. The.results of this analysis provided alternate neutron monitoring functional design criteria to that of Regulatory Guide 1.97. By letter to the.BWR Dwners Group dated January 13, 1993 the NRC found the i alternate criteria of NEDO-31558 for neutron flux monitoring [ instrumentation acceptable in lieu of Regulatory Guide 1.97 criteria for currently licensed BWRs. The Safety Evaluation Report states, in part, that licensees should review their neutron flux monitoring instrumentation l against the criteria of NEDO-31558 and confirm they meet these criteria. Any deviations to the criteria are to be explicitly. stated, and a= "i commitment made to meet the criteria or supporting justification provided I for alternatives. t Grand Gulf is submitting the GGNS neutron monitoring system design evaluation as it; relates to the Topical Report (Attachment 1). To i facilitate NRC review,- the section numbering in Attachment 1 corresponds to i the design criteria sections of the Topical Report. 2200831 l g{}[) f I G9302171/SNLICFLR ' 1-9303220216 930315 -et - j, ~ PDR: ADOCK 05000416 t PEH4 ,p -.. s

1 l March 15. 1993 GNRO-93/00032 l Page 2 of 3 f i The NRC's safety evaluation report for NEDO-31558 also recommended that each licensee perform a plant specific evaluation of the power distribution j to the neutron flux monitoring instrumentation, including recorders. Thir review should verify that, in addition to the events identified in NEDD-31558, a single power supply failure would not cause the loss of redundant channels of neutron flux monitoring instrumentation. GGNS has l reviewed the power distribution for neutron flux monitoring instrumentation and concludes that each division is powered from separate and reliable class 1E uninterruptible power supplies (UPS). Loss of a single UPS will not cause loss of redundant neutron flux monitoring instrumentation. However, review of the power for the neutron flux monitoring recorders has iden2ffied that these recorders are powered by the same non-cInss IE UPS preer supply. GGNS has scheduled to provide redundant non-class JE UPS power for these recorders during the next refueling outage (RF06). This will ensure that loss of a single UPS supply will not cause loss of redundant neutron flux monitoring recorders per the recommendations of the safety evaluation report. This submittal fulfills the IJcense condition as stated in Attachment 1 (c)(4) of the GGNS Operating License. Entergy Operations plans to submit a request for removal of this license condition, as provided for in the SER approving NEDD-31558, under separate cover. Yours truly, w rc--- T WTC/RLP/mte attachment: Topical Report cc: Mr. R.11. Bernhard (w/a) Mr. D. C. Hintz (w/a) Mr. R. B. McGehee (w/a) Mr. N. S. Reynolds (w/a) Mr. H. L. Thomas (w/o) Mr. Stewart D. Ebneter (w/a) Regional Administrator U.S. Nuclear Regulatory Commission Region 11 101 Marietta St., N.W., Suite 2900 Atlanta, Georgia 30323 Mr. P. W. O'Connor, Project Manager (w/2) Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C. 20555 G9302171/SNLICFLR - 2

GGNS Neutron Monitorina l Plant Soecific Desian Evaluation (NEDO-31558) l Introduction A preliminary evaluation was provided to the NRC by letter dated April 28,1988. l This submittal completely supercedes that evaluation, and provides more up to date information. This attachment provides plant specific information relative to the capabilities of the existing Neutron Monitoring System (NMS) at Grand Gulf as it applies to the alternative design requirements stated in NEDO-31558 (Reference 1), " Position on NRC Regulatory Guide 1.97, Revision 3 Requirements for Post Accident Neutron Monitoring System". The topics of discussion in the following sections of this attachment correspond to subsections 5.2.1 through 5.3 of NEDO-31558. To facilitate understanding of the information presented by this attachment, the individual NEDO-31558 subsection i headings and requirements are restated followed by the existing capabilities of the GGNS NMS with respect to the alternate criteria. Where necessary, clarifying information is provided. The basis for the alternative requirements is not rcstated l l as this information is provided in NEDO-31558. 1 The information provided under each subsection primarily applies to.the APRM subsystem. However, when appropriate, information is also being provided for the j 1RM subsystem to show its capability to provide a backup or confirmatory support function to the APRMs when at the lower end of their operating range (i.e., overlap - ) region). l Since the pnsition of NEDO-31558 is based on the operators' actions stated in the I emergency operating procedures (utilization of the NMS for these actions) an initial discussion of the applicable GGNS Emergency Procedures (EPs) and their similarities / differences to the generic BWR Emergency Procedure Guidelines (EPGs) is as follows: 'l GGNS Emeraency Procedure (EP) Overview The GGNS EPs were developed directly from Revision 4 of the BWROG EPGs. l-Because core power (neutron flux) is the parameter of interest, discussion will be restricted to those EPs that are concerned with maintaining and controlling this parameter. At Grand Gulf the EPs related to core power are; EP-2, "RPV Control" and EP-2A, "RPV Control - ATWS".

^ . to GNRO-93/00032 Consistent with the intent of the EPGs, the RPV Control procedure provides the operator with direction to control reactor power under conditions where the reactor will remain shutdown under all conditions, while the RPV Control-ATWS procedure provides the necessary direction to control RPV parameters when it can not be determined that the reactor will remain shutdown under all conditions. The entry conditions for EP-2 provide plant specific values for RPV pressure, level, scram / power, and drywell pressure. The scram / power entry condition encompasses the condition where the operator may not be able to determine reactor power. The bases document for the EPGs discusses the fact that loss of electrical power to the APRMs does not, by itself, necessarily mean that reactor power cannot be determined. The ensuing discussion provided by the bases document further supports the variables / methods used to determine reactor power that were specified in NEDO-31558 Section 6.3. The general guidance provided by EP-2A regarding the control of reactor power is as follows: If all control rods are not inserted to or beyond position 02 (Maximum Subcritical Banked Withdrawal position), transfer recirc pumps to LFMG, initiate ARl/RPT, attempt to insert all controls rods to or beyond position 02 using all possible methods and if required initiate boron injection using both SLC pumps prior to the suppression pool reaching 110 F (Boron injection initiation Temperature). If at any time during the performance of EP-2A, all control rods are inserted to or beyond position 02 then terminate boron injection, enter the scram Off Normal Event Procedure (ONEP), and exit the power control logic leg of EP-2A and re-enter EP-2. i l If while performing the above actions it is determined that the reactor will remain shutdown under all conditions without Boron, then terminate Boron injection, enter the scram ONEP, exit i l EP-2A and re-enter EP-2. The injection of boron into the RPV for the above listed actions is initiated by a limiting suppression pool temperature of 110 F (Suppression Pool Temperature is a Category 1 variable as defined in RG 1.97). Action is conservatively taken before reaching this temperature to preclude the possibility of compromising the integrity of the containment from a forced emergency depressurization at high power levels. The actions required of the operator when performing EP-2A are those actions which will ensure that the hot shutdown boron weight is injected while minimizing the energy being discharged into the containment. In addition, EP-2A assures that adequate boron is injected into the vessel to achieve and maintain cold shutdown conditions. 2

i to GNRO-93/00032 ~ 5.2.1 Ranae Alternate Requirement: 1 to 100% (GGNS downscale alarm is 4%) i RG 1.97 Requirement: 10 '% to 100% The operating range associated with the APRM subsystem at GGNS is 1 to 100% core thermal power (approximately 2. 8 X 10'2nv to 2.8 X 10"nv). This range satisfies the alternate requirement stated above. t 5.2.2 Accuraev l Alternate Requirement: i2% of Rated Power RG 1.97 Requirernent: None stated The instrument accuracy of the GGNS APRM subsystem is 2% of rated i power. The APRM subsystem meets the alternate requirements as stated in NEDO-31558. 5.2.3 Resoonse Characteristic Alternate Requirement: 5 Sec/10% Change l 2 RG 1.97 Requirement: None Specified The existing GGNS APRM subsystem exceeds the specified response characteristics, satisfying the alternate requirement. t 5.2.4 Eauioment Qualification l Alternate Requirement: Operate in AT2NS Environment i RG 1.97 Requirement: RG 1.89 and 1.100 l A plant specific evaluation was performed for GGNS to insure that the f APRM subsystem was designed to function in the abnormal environments i of ATWS events. Based on review of existing calculations, GGNS may exceed the typical design conditions delineated in Table 5-1 of NEDO-31558. Although GGNS may exceed the typical design conditions j delineated in Table 5-1 of NEDO-31558, the APRM subsystem has been l designed to function within the environmental parameters expected for ] GGNS during the required events. 3 i J

. to GNRO-93/00032 t i 5.2.5 Function Time Alternate Requirement: 1 Hour RG 1.97 Requirement: None Specified. From the results of the ATWS event discussed in the previous section and presented in NEDO-24222, it is evident reactor power has been -{ reduced to essentially 0% at approximately thirty minutes into the event. As stated in the previous section, the APRM subsystem is qualified for 1 the environmental conditions of an ATWS, and would operate for greater l than one hour. The NMS meets the alternate requirement specified above. 5.2.6 Seismic Qualification Alternate Requirement: Seismic qualification not required RG 1.97 Requirement: Seismically qualify Cat 1 equipment as important to safety per RG 1.100 i and IEEE-344 Since the event which has been determined to set the design basis j requirements for the NMS is an ATWS event, seismic requirements for the NMS should be consistent with the ATWS rule (10CFR50.62). This 1 rule specifies ATWS environmental conditions which do not require seismic qualification. 5.2.7 Redundancy and Seoaration Alternate Requirement: Redundancy to Assure Reliability [ F.G 1.97 Requirement: Redundant in Division Meeting RG 1.75 i The APRM subsystem consists of eight independent channels, each-channel consisting of inputs from up to twenty-two LPRM detectors and j the necessary signal conditioning equipment, to provide an output signal directly reflecting average power in the core. This output signal is then utilized to provide reactor trip signals, alarms, and indication. The eight channels are divided into four separate divisions with each division I consisting of two APRM channels. Because of the redundancy in detector inputs (only 14 required for operability per GGNS Technical l Specifications) per channel, the application of power and equipment i separation, and the total number of channels, the APRM subsystem j satisfies the alternate redundancy and separation criteria. 4 e

. to GNRO-93/00032 5.2.8 Power Sources Alternate Requirements: Uninterruptable and Reliable Power Sources RG 1.97 Requirement: Standby Power Source (RG 1.32) The four divisions of the APRM subsystems are supplied UPS power from four separate inverters. The normal power supply is from the station batteries with backup power supplied from the associated Division 1 or 2 ESF bus. The recorders located on the operators control console are supplied power from a single non-class 1E UPS power supply. A design change is scheduled for RF06 to provide redundant non-class 1E UPS power for these recorders. This willinsure that loss of a single UPS supply will not cause loss of redundant neutron flux monitoring recorders per the requirements of the safety evaluation report issued January 13, 1993 for the BWR Owner's Group Topical Report NEDO-31558. 5.2.9 Channel Availability Alternate Requirement: Available Prior to Accident RG 1.97 Requirement: Available Prior to A.ccident As discussed in NEDO-31558, the power range instrumentation is available and in service while the plant is operating; therefore, the existing design satisfies this requi ement. ~; 5.2.10 Quality Assurance Alternate Requirement: Limited QA Requirements Based on Generic Letter 85-06 (Reference 3) RG 1.97 Requirement: Application of Specific Reg. Guides The entire APRM subsystem is safety related with the exception of the l APRM recorders located on the operators control console. The guidance provided under NRC Generic Letter 85-06 for non-safety related ATWS equipment has been fully satisfied by the procurement, design, installation, and ongoing operational quality assurance program, for the APRM subsystem. Based on the above, the APRM subsystem satisfies the alternate requirement as stated above. ? E 5 I )

. to GNRO-93/00032 f l 5.2.11 Disolav and Recordino i Alternate Requirement: Continuous Recording RG 1.97 Requirement: Continuous Recording Every APRM channel has continuous recording capability provided by strip chart recorders located on the operators control console. The requirement of NEDO-31558 is fully satisfied. 5.2.12 Eouioment identification Alternate Requirement: Identify in Accordance with CRDR I RG 1.97 Requirement: Identify in Post-Accident Monitors The NMS recorders are all clearly marked and labeled by division, and signal input. These recorders are located on the central portion of the operators control console along with the other plant parameters which are of primary significance to the operator. Located between the four APRM recorders are the APRM status indicators, clearly identifying alarm levels (upscale /downscale/inop, etc.L This instrumentation was reviewed from a Human Factors standpoint for both useability and identification i during performance of the DCRDR effort. Based on the above, the identification of the equipment satisfies the requirement of NEDO-31558. 5.2.13 Interfaces Alternate Requirement: No Interference with RPS Trip functions i RG 1.97 Requirement: Isolators'to be used for Alternate Functions At Grand Gulf the non IE portions of the APRM subsystem are isolated i and separatec 1s required from the IE portions of the system. The NMS,- therefore, satisfies the alternate requirement as stated above. j i k 6 i

.e j i i .. to GNRO-93/00032 l 5.2.14 Service. Test, and Calibration Alternate Reauirernent: Establish in Plant Procedures l [ RG 1.97 Requirement: Establish in Plant Procedures l The APRM subsystem is tested and calibrated on the frequencies as specified in the GGNS Technical Specifications, which are implemented i by plant procedures. l The frequency of performance of these procudures is performed in the i same manner as all other Technical Specification surveillance procedures. I Based on the above discussion, this requirement as specified in NEDO-l 31558 is satisfied. t 5.2.15 Human Factors j Alternate Requirement: Incorporate HFE Principles RG 1.97 Requirement: Incorporate HFE Principles j l The DCRDR effort has been performed for the instrumentation and controls located on the operators control console. Human factors engineering principles were incorporated into this review process, therefore, the NMS satisfies this criteria. i 5.2.16 Direct Measurement I Alternate Requirement: Direct Measurement of Neutron Flux j i i RG 1.97 Requirement: Direct Measurement of Neutron Flux l i The APRM subsystem utilizes miniature fission detectors and as such directly monitors neutron flux in the core. This criteria is satisfied. 5.3 Conclusion I t in all cases the APRM subsystem of the NMS meets or exceeds the f alternate requirements established by NEDO-31558 and in many cases j complies with the requirements of RG 1.97. .l 7 ) 1

l _ to GNRO-93/00032

References:

1. NEDO-31558; Position on NRC Regulatory Guide 1.97, Revision 3 Requirements for Post Accident Neutron Monitoring System. March 14,1988, General Electric Company. 2. NEDO-24222; Assessment of BWR Mitigation of ATWS, Volume 2 (NUREG 0460 Alternate No. 3), February 1981, General Electric Company. 1 3. Generic Letter 85-06; Quality Assurance Guidance for ATWS Equipment That is Not Safety Related, April 16,1985, Nuclear Regulatory Commission. + 4. AECM-88/0083; GGNS Plant Specific Design Evaluation for NEDO-31558, dated April 28,1988. 5. NRC Evaluation of BWR Owner's Group Topical Report NEDO-31558, " Position on NRC Regulatory Guide 1.97, Revision 3, Requirements for Post-Accident Neutron Flux Monitoring System" (TAC M77660), by letter to BWROG dated January i 13,1993. 6. GENE 637-006-0393, GE Nuclear Energy, " Qualification Assessment of Grand Gulf Neutron Monitoring System for Post-Accident Monitoring", dated March 12,1993. t 7 't .,E 8 l ,}}