ML20044C320
| ML20044C320 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 03/10/1993 |
| From: | Matthews D Office of Nuclear Reactor Regulation |
| To: | Georgia Power Co, Oglethorpe Power Corp, Municipal Electric Authority of Georgia, City of Dalton, GA |
| Shared Package | |
| ML20044C321 | List: |
| References | |
| NPF-68-A-057, NPF-81-A-036 NUDOCS 9303220179 | |
| Download: ML20044C320 (7) | |
Text
.
g$#N 4 -
UNITED STATES t
.f
- g.
NUCLEAR REGULATORY COMMISSION.
' WASHINGTON, D.C. 206fi64001 -
}
}
GEORGIA POWER COMPANY f
OGLETHORPE POWER CORPORATION MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA CITY OF DALTON. GEORGIA-
^
DOCKET NO. 50-424 V0GTLE ElfCTRIC GENERATING PLANT. UNIT 1 AMENDMENT'TO FACILITY-OPfRATING LICENSE l
Amendment No. 57 License No. NPF-68 1.
The Nuclear Regulatory Commission (the Commission) has found that:
I P
A.
The application for amendment to the Vogtle. Electric Generating-t Plant, Unit 1 (the facility), Facility 0perating License No..NPF--
J 68 filed by the Georgia Power Company, acting for itself....
Oglethorpe Power Corporation, Municipal Electric Authority'of' Georgia, and City of Dalton, Georgia (the licensees), dated-September 17, 1992, as supplemented February 12.and 25,7 1993, complies with the standards and requireme tts of the Atomic Energyf Act of 1954, as amended (the Act). and the Commission's rules and-regulations set forth in.10 CFR Chapter I;.
B.
The facility will operate in conformity with the application,lthe-provisions of the Act, and the rules. and' regulations of. the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be:
conducted 'in compliance with the Commission's: regulations ' set forth in 10 CFR Chapter I D.
The issuance of this license amendment will not be inimical to the' common defense and security. or to the health and-safety of the public; and E.
The issuance of this amendment is in accordance-with;10 CFR Part 51 of.the Commission's regulations and all applicable requirements have been satisfied.
9303220179 930310 PDR nADOCK 05000424-P PDRj;;.
I 2.
Accordingly, the license is hereby amended by page changes _to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. NPF-81 is hereby amended to read as follows:
ltthnical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 57, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are-hereby incorporated into this license.- GPC shall operate the facility in accordance with the Technical Specifications and the-Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance and shall be implemented within 60 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION-l i
~
David B. Matthews, Director-Project Directorate 11-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation j
Attachment:
Technical Specification
' Changes Date of Issuance: March 10,1993 t
t t
t i
Q'-
J prec UNITED STATES -
4 t1 1
.p j
NUCLEAR REkULATORY. COMMISSION
?
e WASHINGTON, D.C. 20BEf4001 '
+
GEORGIA POWER COMPANY' d
0GLETHORPE POWER CORPORATION MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA-
-L.ITY OF DALTON. GEORGIA DOCKET NO. 50-425 V0GTLE ELECTRIC GENERATING PLANT. UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 36
. License No.:NPF-81 1.
The Nuclear Regulatory Commission (the Commission)-has found that:
~
A.
The application for amendment to the Vogtle' Electric Generating Plant,- Unit 2 (the facility), Facility Operating License:No. NPF-:
81 filed by the Georgia Power Company, acting for itself, Oglethorpe Power Corporation, Municipal' Electric Authority of.
5 Georgia,.and City of Dalton, Georgia -(the: licensees),. dated September 17, 1992, as supplemented February;12 and-25, 1993, complies with the standards and requirements'.of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and '
regulations set forth in 10 CFR Chapter I; B.
The facility wil.1 operate in conformity' with the application, the; provisions of the Act, and the rules and regulations of the-Commission; C.
There is reasonable assurance (i) that-the activities-authorized?
by this amendment can be conducted without endangering the health--
and safety of. the public, and (ii) that suchLactivities will.be-conducted in compliance with the Commission's regulations setE l
fortii in 10 CFR Chapter I; t
D.
The issuance of this license amendment will not be inimical to the-O common defense and security or to the health and safety of the public; and-
.E.
- The issuance of this amendment is in'accordance with"10 CFR Part-51 of the Commission's regulations ~ and all: applicable requirements.
j
~
have been satisfied.
a rs
~
c r
(p.
E, k
F a,
~
2.
Accordingly,.the license _ is hereby amended by page changes to the.
Technical Specifications as indicated.in the attachment to this license amendment and paragraph 2.C.(2)-of. Facility' Operating License No. NPF-81 is hereby amended to read as follows:
L Technical Specifications and Environmental Protection Plan-The Technical Specifications contained in Appendix A, as revised-through Amendment No.
36 and the Environmental Protection Plan contained in Appendix B,. both'of which are attached hereto, are hereby incorporated into this license.. GPC shall operate the L facility in accordance with the Technical Sicecifications.and the Environmental Protection Plan.-
3.
This license amendment is effective as of its date of issuance ~ and shallj
~
be implemented within 60 days of -issuance.
- L LFOR THE NUCLEAR REGULATORY COMMISSION-
-David B. Matthews, Director Project Directorate 11-3 Division of Reactor Projects
/1/II
-Office of Nuclear Reactor. Regulation
Attachment:
Technical Specification Changes Date of Issuance: March 10,1993 l
h i[
l J
i i
-1 q
s 4..
.c ATTACHMENT TO LICENSE AMENDMENi NO. E7 FACILITY OPERATING LICENSE NO. NPF-68 AND LICENSE AMENDMENT NO. 36 FACILITY OPERATING LICENSE NO. NPF-81 EOCKETS N05. 50-424'AND 50-425 Replace the following pages of the Appendix "A" Technical Specificat' ions with-the enclosed pages. The revised pages are identified by Amendment number and contain vertical lines indicating the areas of change.
i Remove Paaes Insert Pages 2-8 2 2-10 2 I t-( -'
4 g
TABLE 2.2-1 (Continued)
Sg TABLE NOTATIONS 3
NOTE 1: OVERTEMPERATURE AT d
AT
(}
1
) s AT, {K,
-K
{r
[T (3,
) - T'] + K3 (P - P') - f, (AI)}
I 7
2 o.
Where:
AT Measured AT Lead-lag compensator on measured AT; 1.+ r,1 I+rSz Time constants utilized in lead-lag compensator for AT, t 18s, r,, r2 i
r,s 3 s; I
Lag compensator on measured AT; m
1+TS3 co Time constants utilized in the lag compensator for AT, r - 2 s; l
7 -
3 3
Indicated AT at RATED THERMAL POWIR; AT, K
s 1.12; 3
K
.0.0224/*F; g
J[E g,
1 + r,$
The function generated by the lead-lag compensator for T,
gg 1+T5 dynamic compensation; 3
oo
((
Time constants utilized in the lead-lag compensator for T,,,
r 2 28 s, 7, i 4
s 4
9 P-7 $ 4 s; 5
to w C
T Average temperature, *F; ss
- p 1
Lag cot,pensator on measured T,,;
1 +. 7 S 6
y_
Time constant utilized in the measured T,, lag compensator, 76 - O s;.
7 6
=
h
TABLE 2.2-1 (Continued) 1ABLE NOTATIONS (Continued)
E El R
NOTE 3: OVERPOWER AT ey AT (1 + T 5)
(
1
)
vi (1 + 7 5)
(1 + T S) s AT, {K.
-K 5 ((_.17 S
){
l
)T-K6 [T (
1
) - T"] - f2 (AI)}
3 1 + 7 S) (1 + 7 S)
(1 + 7 S) 2 3
7 6
3 Where: AT Measured AT; 9
l + ril-Lead-lag compensator on measured AT; I+iS2 Time constants utilized in lead-lag compensator ri, r2
-for AT, r, 2 8 S, r $ 3 s; 2
1 Lag compensator on measured AT; I+TS3
?
r Time constants utilized in the lag compensator for AT, 3
5 r -2s; l
3 AT, Indicated AT at RATED THEPJ1AL POWER;
=
K.
5 1.095, l
4 r
2 0.02/*F for increasing average temperature and 2 0 for decreasing average 3
temperature, FF 7E The function generated by the rate-lag compensator for T dynamic 1 +7 __.. compensation, m
rSr EE Time constants utilized in the rate-lag compensator for T
, r 2 10 s,_
r 7
7 E$
L *,
1 Lag compensator on measured Tm;
- @g I+7S6 hh
"=