Forwards Component Level Important to License Renewal (Itlr) Screening Results for RCS, ...Screening Results for Containment Sys, ...Screening Results for Salt Water Cooling Sys & ...Screening Results for Compressed Air..
ML20044C205
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 03/12/1993
From: Denton R
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17179A861 List:
References
NUDOCS 9303190148
Download: ML20044C205 (2)


Text

{

l y

a;

. BALTIMORE c.

GAS AND -

N ELECTRIC i

1650 CALVERT CUFFS PARKWAY LUSBY, MARYl.AND 20657-4702 ROBERT E, DENTON n

VicE PREStDENT NuctEAR ENERGY (ano) reo-44ss

^

March 12,1993 U.S. Nuclear Regulatory Commission Washington,DC 20555 A'ITENTION:

Document Control Desk

SUBJECT:

Cahert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Submittal of Systems, Structures and Components Screening Methodology for License Renewal o

REFERENCES:

(a) letter from Mr. R. E. Denton (BG&E) to NRC Document Control Desk, dated February 25,1993, Proposed Schedule to Submit License Renewal Documents (b)

Letter from Mr. R. E. Denton (BG&E) to NRC Document Control Desk, dated March 2,1993, Submittal 'of Systems, Structures and Components ' Screening Methodology Documents for License Renewal Gentlemen:

As described in Reference (a), the following documents are submitted for NRC review and approval:

Component level Laportant to License Renewal (ITLR) Screening Procedure for Systems i-Component level ITLR Screening Procedure for Structures L

Component Ixvel ITLR Screening Results (Note that only the results for Reactor Coolant,.

L Compressed Air, Saltwater, and Containment Systems are being submitted)

The combination of these documents plus those submitted by Reference (b) is Volume 1 of 2 of our

' Infegrated Plant Assessment Methodology. Baltimo_rc Gas and Electric Company is concerned about

the large level of de' ail produced by the component level screening. We have developed alternate summary results which meet the intent of the rule and SECY 93-049, " Implementation ~of 10 CFR Part 54, ' Requirements for Renewal of Operating Licenses for Nuclear Power Plants.'
  • These alternate summary results are available for your review. We believe this concern can be resolved duringyour review.

190013 g\\

[Ch-

~

uCA

,9 I

h c

, OTypd qI6\\

manos man a

PDR ADOCK 05000317

\\

'P PDR

{

+

y

'1 Document Control Desk

- March 12,1993 Page 2 -

L.

Please note that Reference (b) submitted two binders. One binder titled,'

  • Integrated Plant Assessment Methodology Volume 1: Systems, Structures and Component Screening" contained the Screening Methodology and the Sptems/ Structures Screening Procedure. The other binder was titled as,
  • System and Structurer important to License Renewal Screening Results." However, L

. throughout the methodology, it is referred to as, " Attachment C, CCNPP Systems and Structures

[.

Important to License Renewal." We regret any confusion caused by this error.

~ Should you have any questions regarding these documents, we will be pleased to discuss them with you.

Very trulyyours, 8

n

?

WG" I

'k

.I RED /JMOldhn Attachments:

As Stated i

i t

cc:

(Without Attachments)

D. A. Brune, Esquire J.E.Silberg Esquire i

R. A. Capra, NRC D. G. Mcdonald, Jr., NRC f

T.T. Martin, NRC P. R. Wilson, hTC R. I. Mcl.can, DNR J. H. Walter, PSC e

S. F. Newberry, NRC W. D. Travers, NRC (With Attachments)

.i R. L Nease, NRC

'i i

P' I

i i

s..