ML20044C184

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Dec 1992 for River Bend Station,Unit 1
ML20044C184
Person / Time
Site: River Bend Entergy icon.png
Issue date: 12/31/1992
From: Hendl G
GULF STATES UTILITIES CO.
To:
Shared Package
ML20044C182 List:
References
NUDOCS 9303180287
Download: ML20044C184 (4)


Text

-....

l l

I DOCKET NO. 50/458 i

RIVER-BEND STATION UNIT 1 REPORT NO.

R-92 i DATE January 12.'1993

(

~

COMPLETED BY G.

F.

Hendl l

TITLE Sr. Compliance Analyst TELEPHONE 504-381-4732 i

)

MONTH DECEMBER, 1992 i

DAY AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL POWER LEVEL.

(MWe-Net)

(MWe-Ne t) 1.

929 17.

928 2.

928 18.

925 f

3.

928 19.

922-4.

'920 20.

924-5.

931 21.

924 6.

507 t

22.

922 7.

0 23.

924 8.

0 24.

930 9.

0 25.

927 10.

0 26.

929 11.

0 27.

928 12.

0 28.

924 13.

0 l

29.

925 14.

12 30.

926 I

15.

449 31.

927 1

16.

791 i.

l 9303100287 930311 PDR ADOCK 05000458 i

R PDR

i l

~

DOCKET NO. 50/458 i

RIVER BEND STATION UNIT 1 i

REPORT NO.

R-92 12 DATE January 12. 1993 3

COMPLETED BY G.

F.

Handl TITLE Sr. Como11ance Analyst TELEPHONE 504-381-4732 PAGE 1

OF 2

l i

OPERATING STATUS 1.

REPORTING PERIOD:

December. 1992 GROSS HOURS IN REPORTING PERIOD:

744 2.

CURRENTLY AUTHORIZED POWER LEVEL (Mwt) :

2S94 MAX.

DEPEND CAPACITY (MWe-Net):

M DESIGN ELECTRICAL RATING (MWe-Net):

M l

l 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):

N/_A i

4.

REASONS FOR RESTRICTION (IF ANY):

NLA l

THIS YR' TO MONTH DATE CUMULATIVE i

5.

NUMBER OF HOURS REACTOR WAS CRITICAL.

573.6 3.487.3 44.539.40 t

6.

REACTOR RESERVE SHUTDOWN HOURS 0

0 0

7.

HOURS GENERATOR ON LINE 548.2 3.211.2 41.902.91 l

8.

UNIT RESERVE SHUTDOWN HOURS O

0 0

i

-9.

GROSS THERMAL ENERGY GENERATED (MWH).

1.532.389 8.770.567 111.099.990

10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 519.927 2.952.071 37.541.570
11. NET ELECTRICAL ENERGY GENERATED (MWH).

486.651 2.762.678 35.131.630 L

1

I l

DOCKET NO. 50/458 RIVER BEND STATION UNIT 1 REPORT NO.

R-92-12 DATE January 12. 1993 i

COMPLETED BY G.

F.

Handl l

TITLE Sr. Compliance i

Analyst TELEPHONE 504-381-4732 i

I PAGE 2

OF 2

i OPERATING STATUS I

THIS YR TO' CUMU-MONTH DATE LATIVE i

12. REACTOR SERVICE FACTOR..

77.'1 39.7 71.5 i

13. REACTOR AVAILABILITY FACTOR.

77.1 39.7 71.5 14.. UNIT SERVICE FACTOR 73.7 36.6 69.2 I

15. UNIT. AVAILABILITY FACTOR.

73.7 36.6 69.2 i

16. UNIT CAPACITY' FACTOR (Using MDC) 69.9 33.6 63.6 I
17. UNIT CAPACITY FACTOR (Using Design MWe).

69.9 33.6 63.6 1

18. UNIT FORCED OUTAGE RATE 26.3 25.8 10.5
19. SHUTDOWNS-SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF.EACH) :

N/A

20. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

N/A t

i

.s.

UNIT SHUTDOWNS AND POWER REDUCTIONS l

l l

TIME TIME START RECOVER OF FROM DURATION TYPE REASON METHOD CORRECTIVE ACTION /

NO.

DATE OCCURRENCE OCCURRENCE (HOURS)

NOTE (1)

NOTE (2)

NOTE (3)

COMMENTS 92 07 12/06/92 1729 12/14/92 195.5

  • F B

2 Replace the recirc.

2115 pump

'B' shaft seal due to excessive leakage.

SUMMARY

  • REVISED FROM SCHEDULED TO FORCED NOTE (1)

TYPE OF OCCURRNCE:

ENTER CODE DOCKET NO. 5/048 F:

FORCED RIVER BEND STATION UNIT 1 S

SCHEDULED NOTE (2)

REASON FOR OCCURRENCE:

ENTER CODE REPORT NO.

R-92-12 A

EQUIPMENT FAILURE (EXPLAIN IN CORRECTIVE ACTIONS /COMMEh"fS)

B:

MAINTENANCE OR TEST REPORT MONTH DECEMBER, 1992 C:

REFUELING D:

REGULATORY RESTRICTION E:

OPERATOR TRAINING AND LICENSE EXAMINATION DATE January 12, 1993 F:

ADMINISTRATIVE G:

OPERATIONAL ERROR (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS)

G.

F.

Hendl H:

OTHER (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS)

COM LETED BY NOTE (3)

METHOD OF SHUTTING DOWN REACTOR OR REDUCING POWER:

ENTER ONE

~

g

' SIGNATURE 1.

MANUAL 2.

MANUAL SCRAM 3.

AUTOMATIC SCRAM Sr. Compliance Analyst 4.

'OTHER (EXPLAIN IN CORRECTIVE ACTION / COMMENTS)

TITLE 4

--