ML20044C086
| ML20044C086 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 03/12/1993 |
| From: | Fenech R TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9303170169 | |
| Download: ML20044C086 (2) | |
Text
>
o I
Tennessee Vahey Authority, Post Office Box 2000. Sodoy-Daisy Tennessee 37379-2000 Robert A. Fenech Vce President. Sequoyah Nuclear Plant I
March 12, 1993 U.S. Nuclear Regulatory Commission I
ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
SEQUOYAH NUCLEAR PLANT (SQN) - MEETING TO DISCUSS THE PROGRESS IN PERFORMANCE IMPROVEMENT EFFORTS AT SQN
Reference:
TVA letter to NRC dated November 23, 1992, "Sequoyah Nuclear Plant (SQN) Units 1 and 2 - Inspection Report Nos. 50-327, 328/92 Response to the 1992 Systematic Assessment of Licensee Performance (SALP)"
In the referenced letter, TVA committed to schedule a meeting with the NRC staff by March 15, 1993, to review the progress in the SQN performance improvement efforts. TVA intends to satisfy this commitment by meeting with NRC to discuss the overall SQN Site Improvement Plan.
Delays have occurred as a result of ongoing activities at SQN. A mutually agreed-upon meeting date and location will be determined through discussions with NRC.
If you have any questions concerning this submittal, please contact M. A. Cooper at (615) 843-8924.
Sincerely.
$ fs~e.-cA.-
Robert A. Fenech-l cc: See page 2 l
l t
170123 d
IO!
-9303170169 930312 PDR ADOCK 05000327 P
PDR g
I t
1 U.S. Nuclear Regulatory Commission 1
Page 2 March 12, 1993
+
Mr. D. E. LaBarge, Project Manager cc:
U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike I
Rockville, Maryland 20852-2739 1
NRC Resident Inspector Sequoyah Nuclear Plant k
2600 Igou Ferry Road I
Soddy-Daisy. Tennessee 37379-3624 Mr. B. A. Wilson, Project Chief l
U.S. Nuclear Regulatory Commission Region II
}
l 101 Marietta Street, NW, Suite 2900 1
Atlanta, Georgia 30323-0199
{
t l
l l
\\
t I
)
I i
l a-