ML20044C078

From kanterella
Jump to navigation Jump to search
Requests NRC Approval to Transit Listed Us Ports W/Spent Fuel,In Ref to SUMI/PNC-2,per 10CFR73.37.Tentative Schedule for Shipment Jul/Aug 1993
ML20044C078
Person / Time
Site: 07001252
Issue date: 02/10/1993
From: Condrey D
EDLOW INTERNATIONAL CO.
To: Macdonald C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20044C075 List:
References
NUDOCS 9303170154
Download: ML20044C078 (1)


Text

-

p 4 / 3 >r 35 C 90- C/95%YdOK M

~

Q 70-/263 I

39/2//

. Edlow International Company 1666 Connecticut Ave., N.W., Suite Sto Washington, D.C. 20009 U.S.A.

Tel 002) 483-4959 Tlx 643B7 Fax C02) 483484o February 10, 1993 Mr. Charles E. MacDonald, Chief Transportation Branch Division of Safeguards and Transportation, NHSS U.S. PAJclear RegJlatory Comission Washington, D.C.

20555 Dur Ref:

SUKI/PNC-2 For compliance-with 10 CFR 73.37, we request that you provide us with IRC approval to transit the following U.S. Port with spent fuel. Please note.that in most cases, the ocean. vessel transporting spent fuel will only transit this port.

In the case of shipments being transported to or from specific ports, w will arrange for route plans as necessary.

Port of Seattle, Washington Port of Tacoma, Washington Plea %'se The tentative schedale for this shipnent is July / August,1993.

provide us with written confirmation that you have received this request.

We thank you for your continued cooperation.

Sincerely, EDLOW INTERNATIONAL COMPN 4Y

\\

Daren J. Condrey Assistant Manager, Operations t

9303170154 930309 PDR ADOCK 07001252 C

PDR

__-