Monthly Operating Rept for Feb 1993 for Monticello Nuclear Generating Plant
ML20044C047
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 02/28/1993
From: Parker T, Paustian H
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9303170055
Download: ML20044C047 (5)


Text

,

Northem States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401-1927 Telephone (612) 330-5500 March 10, 1993 Monticello Technical Specifications Section 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PIANT l

Docket No. 50-263 License No. DPR-22 Monthly Operating Report Februarv. 1993 P

Attached is the Monthly Operating Report for February, 1993 for the Monticello Nuclear Generating Plant.

o E%fGl Tb

[7 Thomas M Parker Director Nuclear Licensing TMP/jlk C:

Director, Office of Resource Management Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector State of Minnesota - Kris Sanda Attachment l

I i

l 9303170055 930228 I

'~

PDR ADOCK 05000263 R

PDR 1$ U

ils

~ OPERATING DATA REPORT' t

DOCKET NO.

50-263 DATE 3-1-93 COMPLETED BY H.-H.

Paustian TELEPHONE 612/295-5151 OPERATING STATUS

] Notes

]

1.LUnit Name :

Monticello

]

]

-2.

Reporting period:

February

]

]

3. Licensed Thermal Power (MWt):

1670

]

]

4. Nameplate Rating (Gross MWe):

569

)

-]

5. Design Electrical Rating (Net MWe):

545.4'

]

]

6. Maximum Dependable Capacity (Gross MWe): __564

]

]

7. Maximum Dependable Capacity (Net MWe):

536

]-

]

8. If Changes occur in Capacity Ratings (Items Number-3-Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any: __N/A THIS MONTH YR.-TO-DATE.

_ CUMULATIVE-11 '. Hours In Reporting Period 672 1416 189937 q

12. Number Of Hours Reactor Was Critical 0.0 627.9-152612.6
13. Reactor Reserve' Shutdown Hours-0.0 0.0 940.7
14. Hours Generator On-Line 0.0 625.0 149901.'2
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (mmi)'

0 767201 230160614

17. Gross Electrical Energy Generated (MWH) 0 252928 77783728
18. Net Electrical Energy Generated (203)

-1479 238857

-74394744

19. Unit Service Factor-0.0%

44.1%

78.9%~

i

20. Unit Availability Factor

-0.4%

31.5%

73.1%

0.0%

44.1%

78.9%'

~

21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net)

-0.4%-

30.9%

71.8%=

23.-Unit Forced Outage Rate 0.0%

0.0%

3.7%

24.' Shutdowns Scheduled'Over Next 12 Months-(7ype, Date, and Duration of Each)

Refueling Outage - 1/27/93 - 56 days
25. If Shut Down At End Of Report Period, Estimated Date Of Startup:3/23/93
26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l

J l

'l

t AVERAGE' DAILY UNIT. POWER LEVEL' DOCKET NO.

50-263-

' UNIT ~ Monticello _,

-l DATE -1-93 1

' COMPLETED:BY H. H. Paustian TELEPHONE' 612/295-5151 i..

-l b

MONTH OF. February DAY AVERAGE DAILY POWER LEVEL DAY _

AVERAGE DAILY POWER LEVEL.

(MWe-Net)

(MWe-Net) l 1

-3.

17

-2.

'2.

2

-3.

18 3

-3, 19

-2,

'4

-3.

20

-2.

5

-2.

21

-2.

6

-2.

22

-2.

7

- 2.._

23

-2.

8

-2.

24

-2.

9

-2.

25

-2.

10-

-2.

26

-2.

11

.2.

.27

-3.

12

-2.

28-

-3.

{

13

-2.

14

-2.

15

-2.

'16-

-2.

I INSTRUCTIONS

- On this format, list the. average daily unit power level in MWe-Net for-eachL day in.the reporting month.

Compute to the' nearest whole. megawatt:.

j

'l

~ WARRATIVE. SUMi4ARY OF. OPERATING - EXPERIENCE; DOCKET NO.

50-263

-DATE 3-1-93 COMPLETED BY H. H. Paustian' TELEPHONE'.612/295-5151 MONTH

~FEB 2-1-93 to Plant shut down for 1993 Refueling Outage.

2-28-93 r

SPENT FUEL POOL UPDATE j

Fuel assemblies in core 484 Fuel assemblies in spent fuel pool 2237 710 Licensed capacity Date of last refueling that can be 2008 discharged with present capacity b

l' t

i Note: Power operation defined as essentially 100% of-i rated power except for weekend load drops for specified surveillance testing; l

t

- i l

L

=

a

.= g+;3<

UNIT SHIRDOVNS AND POVER REDUCTIONS DOCKET NO.

50-263-

. ~T~~

UNIT NAME Monticello DATE 01..

COMPLETED BY H. H. Paustian

~

' REPORT M0f7HI _ February _

TELEPHONE.312/295-5151 -

No.

Date Type Duration Reason Method LER System Como.

Cause & Corrective (1)

(hours)

(2) of No.

Code Code Action to Shutdown (4)

(5)

Prevent Recurrence (3) 1 02-01-93 S

672.0 C

1 N/A Plant shutdown for 1993 (EOC15) refueling outage L

1 2.

3 4

F: Forced Reason:

Method:

Draft IEEE Standard S: Scheduled A-Equipment Failure (Explain) 1-Manual 805-1984(F805-DS)

B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram 5

- ~

D-Regulator Restriction 4-Other (Explain)

.IEEE Standard 803A-1983 E-Operator Training & License Examination F-Administrative G-Operational Error.(Explain)

H-Other (Explain)

.