Northem States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401-1927 Telephone (612) 330-5500 March 10, 1993 Monticello Technical Specifications Section 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PIANT l
Docket No. 50-263 License No. DPR-22 Monthly Operating Report Februarv. 1993 P
Attached is the Monthly Operating Report for February, 1993 for the Monticello Nuclear Generating Plant.
o E%fGl Tb
[7 Thomas M Parker Director Nuclear Licensing TMP/jlk C:
Director, Office of Resource Management Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector State of Minnesota - Kris Sanda Attachment l
I i
l 9303170055 930228 I
'~
PDR ADOCK 05000263 R
PDR 1$ U
ils
~ OPERATING DATA REPORT' t
DOCKET NO.
50-263 DATE 3-1-93 COMPLETED BY H.-H.
Paustian TELEPHONE 612/295-5151 OPERATING STATUS
] Notes
]
1.LUnit Name :
Monticello
]
]
-2.
Reporting period:
February
]
]
- 3. Licensed Thermal Power (MWt):
1670
]
]
- 4. Nameplate Rating (Gross MWe):
569
)
-]
- 5. Design Electrical Rating (Net MWe):
545.4'
]
]
- 6. Maximum Dependable Capacity (Gross MWe): __564
]
]
- 7. Maximum Dependable Capacity (Net MWe):
536
]-
]
- 8. If Changes occur in Capacity Ratings (Items Number-3-Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any: __N/A THIS MONTH YR.-TO-DATE.
_ CUMULATIVE-11 '. Hours In Reporting Period 672 1416 189937 q
- 12. Number Of Hours Reactor Was Critical 0.0 627.9-152612.6
- 13. Reactor Reserve' Shutdown Hours-0.0 0.0 940.7
- 14. Hours Generator On-Line 0.0 625.0 149901.'2
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (mmi)'
0 767201 230160614
- 17. Gross Electrical Energy Generated (MWH) 0 252928 77783728
- 18. Net Electrical Energy Generated (203)
-1479 238857
-74394744
- 19. Unit Service Factor-0.0%
44.1%
78.9%~
i
- 20. Unit Availability Factor
-0.4%
31.5%
73.1%
0.0%
44.1%
78.9%'
~
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net)
-0.4%-
30.9%
71.8%=
23.-Unit Forced Outage Rate 0.0%
0.0%
3.7%
24.' Shutdowns Scheduled'Over Next 12 Months-(7ype, Date, and Duration of Each)
- Refueling Outage - 1/27/93 - 56 days
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:3/23/93
- 26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l
J l
'l
t AVERAGE' DAILY UNIT. POWER LEVEL' DOCKET NO.
50-263-
' UNIT ~ Monticello _,
-l DATE -1-93 1
' COMPLETED:BY H. H. Paustian TELEPHONE' 612/295-5151 i..
-l b
MONTH OF. February DAY AVERAGE DAILY POWER LEVEL DAY _
AVERAGE DAILY POWER LEVEL.
(MWe-Net)
(MWe-Net) l 1
-3.
17
-2.
'2.
2
-3.
18 3
-3, 19
-2,
'4
-3.
20
-2.
5
-2.
21
-2.
6
-2.
22
-2.
7
- 2.._
23
-2.
8
-2.
24
-2.
9
-2.
25
-2.
10-
-2.
26
-2.
11
.2.
.27
-3.
12
-2.
28-
-3.
{
13
-2.
- 14
-2.
15
-2.
'16-
-2.
I INSTRUCTIONS
- On this format, list the. average daily unit power level in MWe-Net for-eachL day in.the reporting month.
Compute to the' nearest whole. megawatt:.
j
'l
~ WARRATIVE. SUMi4ARY OF. OPERATING - EXPERIENCE; DOCKET NO.
50-263
-DATE 3-1-93 COMPLETED BY H. H. Paustian' TELEPHONE'.612/295-5151 MONTH
~FEB 2-1-93 to Plant shut down for 1993 Refueling Outage.
2-28-93 r
SPENT FUEL POOL UPDATE j
Fuel assemblies in core 484 Fuel assemblies in spent fuel pool 2237 710 Licensed capacity Date of last refueling that can be 2008 discharged with present capacity b
l' t
i Note: Power operation defined as essentially 100% of-i rated power except for weekend load drops for specified surveillance testing; l
t
- i l
L
=
a
.= g+;3<
UNIT SHIRDOVNS AND POVER REDUCTIONS DOCKET NO.
50-263-
. ~T~~
UNIT NAME Monticello DATE 01..
COMPLETED BY H. H. Paustian
~
' REPORT M0f7HI _ February _
TELEPHONE.312/295-5151 -
No.
Date Type Duration Reason Method LER System Como.
Cause & Corrective (1)
(hours)
(2) of No.
Code Code Action to Shutdown (4)
(5)
Prevent Recurrence (3) 1 02-01-93 S
672.0 C
1 N/A Plant shutdown for 1993 (EOC15) refueling outage L
1 2.
3 4
F: Forced Reason:
Method:
Draft IEEE Standard S: Scheduled A-Equipment Failure (Explain) 1-Manual 805-1984(F805-DS)
B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram 5
- ~
D-Regulator Restriction 4-Other (Explain)
.IEEE Standard 803A-1983 E-Operator Training & License Examination F-Administrative G-Operational Error.(Explain)
H-Other (Explain)
.