Monthly Operating Rept for Feb 1993 for Trojan Nuclear Plant
ML20044C043
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 02/28/1993
From: Hugo B, Machon R
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RDM-021-93, RDM-21-93, NUDOCS 9303170043
Download: ML20044C043 (5)


Text

.

k E h[f-i.

(N g

Portland General Electric Company-Trojan Nuclear Plant 71760 Columbia River Hwy.

Rainier, Oregon 97048,

(503) S56-3713 March 11.-1993 RDM-021-93 Trojan Nuclear Plant Docket 50-344 License NPF-1 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington DC 20555

Dear Sir:

Monthly Qperatine Report i

In accordance with the Trojan Nuclear Plant Technical Specifications reporting requirements, the Monthly Operating Data Report is submitted for February 1993.

Sincerely,

/

R. D. Mac on Plant General Manager i

Attachment c:

Mr. John B. Martin Regional Administrator, Region V U.S. Nuclear Regulatory Commission Mr. David Stewart-Smith State of Oregon Department of Energy Mr. Kenneth E. Johnston NRC Senior Resident Inspector Trojan Nuc1 car Plant a

f.

9303170043 930228

/

PDR ADOCK 05000344

/ 9.k

[

R PDR (f

l.

1 6

Trojan Nuclear Plant-Document Control Desk Docket 50-344 March 11, 1993 License NPF-1 Attachment 4 pages TROJAN NUCLEAR PLANT l

Trojan Monthly Operating Report

-February 1993 OPERATIONS The reporting period began and ended with the plant defueled.

t I

T t

i A

i

P OPERATING DATA REPORT DOCKET NO.

50-344 DATE March 1993 COMPLETED BY B. R. Hugo OPERAT~MG STATUS:

TELEPHONE (503) 556-5529

1. Unit Nak:

Trojan Nuclear Notes:

2. Reporting Period February 1993 Company's Board of Directors announced the permanent
3. Licensed Thermal Power (MWt) 3411 closure of Trojan.
4. Nameplate Rating (Gross MWe) 1216
5. Design Electrical Rating (Nat MWe) 1130
6. Maximum Dependable Capacity (Gross HWe) 1153
7. Maximum Dependable Capacity (Not Mde) 1095
8. If Changes Occur in Capacity Ratings (Items No. 3 N/A through 7) Since Last Report, Give Reasons
9. Power Level To Which Restricted, If Any (Not PHe) 0
10. Reasons For Restrictions, If Any Permanent Plant shutdown This Month Yr-to-Date Cumulative
11. Hours in Reporting Period 672 1416 143271*
12. Number of Hours Reactor Was Critical 0

0 85710*

13. Reactor Reserve Shutdown Bours 0

0 5097*

14. Hours Generator On-Line 0

0 83545*

15. Unit Reserve Shutdown Hours 0

0 4468*

16. Gross Thermal Energy Generated (MWB) 0 0

267291694*

17. Gross Electrical Energy Generated (MWH) 0 0

88265599*

18. Net Electrical Energy Generated (MWH)

-4718

-10777 83477241*

19. Unit Service Factor 0.0 0.0 58.3*
20. Unit Availability Factor 0.0 0.0 61.4*
21. Unit Capacity Factor (Using MDC Net)

-0.6

-0.7 54.2*

22. Unit Capacity Factor (Using DER Net)

-0.6

-0.7 51.6*

23. Unit Forced Outage Rate 0.0 100.0 13.1*
24. Shutdowns Scheduled Over Next 6 Months (Type, N/A Date and Duration of Each):
25. If Shut Down at End of Report Period, N/A Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial FORECAST ACHIEVED Operation):

INITIAL CRITICALITY N/A N/A i

INITIAL ELECTRICITY N/A N/A CotNERCIAL CPERATION N/A N/A 1

. ~

~

'k i.

o AVERAGE DAILY UNIT POWER LEVEL i

DOCKET NO.

50-344 UNIT TROJAN DATE-MARCH 1993-i COMPLETED BY B. R. HUGO TELEPHONE (503) 556-5529 MONTH: February. 1993 l

DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

LEVEL (MWe-Net) 1

-7 17

-7 2

-7 18

-7 3

-7 19

-8 f

4

-7 20

-8

-8 j

5

-7 21 6

-7 22

~7-7

-6 23

-8:

8

-6 24

-8

~

9

-6 25

-8 5

10

-6 26

-8 11

-6 27

-8 l

12

-6 28

-8

j 13

-6 29 i

14

-6 30 15

-7.

31 16

-7 i

INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-

)

Not for each day in the reporting month.~

Compute.-to the. nearest

.)

whole megawatt.

j u

2

'.r 4

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET No.

50-344 UNIT NAME Troian DATE March. 1993 REPORT MONTH February. 1993 COMPLETED BY B. R. Huno TELEPHONE (503) 556-5529 NO.

DATE TYPE' DURATION REASOIP METHOD OF LICENSE SYSTDi COMIVNENT CAUSE & CORRECTIVE ACTION TO FREVENT RECimRENCE HOURS SHUTTING EVENT CODE' COCE' DOWN REPORT #

REACTOW 93-01 930104 672.0 H

Portland General Electric *s Board of Directors voted to permanently cease Trojan operations on January 4,

1993, i
1. F: Forced
2. REASON
3. METHOD:.
4. IEEE Standard 805-1984' S: Scheduled A-Equipment Failure (Expleia) 1-Manual
5. IEEE Standard 803A-1983 B-Maintenance or Test-2-Manual Scram.

C-Refuelins 3-Autcunatic Scram.

' D-Regulatory Restriction 4-Other (Explain)

E-Operator Training &

Licensing Examination F-Administrative G-Operational Error (Ex plain)

.B-Other (Explain)