Text
.
k E h[f-i.
(N g
Portland General Electric Company-Trojan Nuclear Plant 71760 Columbia River Hwy.
Rainier, Oregon 97048,
(503) S56-3713 March 11.-1993 RDM-021-93 Trojan Nuclear Plant Docket 50-344 License NPF-1 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington DC 20555
Dear Sir:
Monthly Qperatine Report i
In accordance with the Trojan Nuclear Plant Technical Specifications reporting requirements, the Monthly Operating Data Report is submitted for February 1993.
Sincerely,
/
R. D. Mac on Plant General Manager i
Attachment c:
Mr. John B. Martin Regional Administrator, Region V U.S. Nuclear Regulatory Commission Mr. David Stewart-Smith State of Oregon Department of Energy Mr. Kenneth E. Johnston NRC Senior Resident Inspector Trojan Nuc1 car Plant a
f.
9303170043 930228
/
PDR ADOCK 05000344
/ 9.k
[
R PDR (f
l.
1 6
Trojan Nuclear Plant-Document Control Desk Docket 50-344 March 11, 1993 License NPF-1 Attachment 4 pages TROJAN NUCLEAR PLANT l
Trojan Monthly Operating Report
-February 1993 OPERATIONS The reporting period began and ended with the plant defueled.
t I
T t
i A
i
P OPERATING DATA REPORT DOCKET NO.
50-344 DATE March 1993 COMPLETED BY B. R. Hugo OPERAT~MG STATUS:
TELEPHONE (503) 556-5529
- 1. Unit Nak:
Trojan Nuclear Notes:
- Cumulative values Plant as of ' 3 p.m. January 4 when Portland General Electric
- 2. Reporting Period February 1993 Company's Board of Directors announced the permanent
- 3. Licensed Thermal Power (MWt) 3411 closure of Trojan.
- 4. Nameplate Rating (Gross MWe) 1216
- 5. Design Electrical Rating (Nat MWe) 1130
- 6. Maximum Dependable Capacity (Gross HWe) 1153
- 7. Maximum Dependable Capacity (Not Mde) 1095
- 8. If Changes Occur in Capacity Ratings (Items No. 3 N/A through 7) Since Last Report, Give Reasons
- 9. Power Level To Which Restricted, If Any (Not PHe) 0
- 10. Reasons For Restrictions, If Any Permanent Plant shutdown This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 672 1416 143271*
- 12. Number of Hours Reactor Was Critical 0
0 85710*
- 13. Reactor Reserve Shutdown Bours 0
0 5097*
- 14. Hours Generator On-Line 0
0 83545*
- 15. Unit Reserve Shutdown Hours 0
0 4468*
- 16. Gross Thermal Energy Generated (MWB) 0 0
267291694*
- 17. Gross Electrical Energy Generated (MWH) 0 0
88265599*
- 18. Net Electrical Energy Generated (MWH)
-4718
-10777 83477241*
- 19. Unit Service Factor 0.0 0.0 58.3*
- 20. Unit Availability Factor 0.0 0.0 61.4*
- 21. Unit Capacity Factor (Using MDC Net)
-0.6
-0.7 54.2*
- 22. Unit Capacity Factor (Using DER Net)
-0.6
-0.7 51.6*
- 23. Unit Forced Outage Rate 0.0 100.0 13.1*
- 24. Shutdowns Scheduled Over Next 6 Months (Type, N/A Date and Duration of Each):
- 25. If Shut Down at End of Report Period, N/A Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial FORECAST ACHIEVED Operation):
INITIAL CRITICALITY N/A N/A i
INITIAL ELECTRICITY N/A N/A CotNERCIAL CPERATION N/A N/A 1
. ~
~
'k i.
o AVERAGE DAILY UNIT POWER LEVEL i
DOCKET NO.
50-344 UNIT TROJAN DATE-MARCH 1993-i COMPLETED BY B. R. HUGO TELEPHONE (503) 556-5529 MONTH: February. 1993 l
DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
LEVEL (MWe-Net) 1
-7 17
-7 2
-7 18
-7 3
-7 19
-8 f
4
-7 20
-8
-8 j
5
-7 21 6
-7 22
~7-7
-6 23
-8:
8
-6 24
-8
~
9
-6 25
-8 5
10
-6 26
-8 11
-6 27
-8 l
12
-6 28
-8
- j 13
-6 29 i
14
-6 30 15
-7.
31 16
-7 i
INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-
)
Not for each day in the reporting month.~
Compute.-to the. nearest
.)
whole megawatt.
j u
2
'.r 4
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET No.
50-344 UNIT NAME Troian DATE March. 1993 REPORT MONTH February. 1993 COMPLETED BY B. R. Huno TELEPHONE (503) 556-5529 NO.
DATE TYPE' DURATION REASOIP METHOD OF LICENSE SYSTDi COMIVNENT CAUSE & CORRECTIVE ACTION TO FREVENT RECimRENCE HOURS SHUTTING EVENT CODE' COCE' DOWN REPORT #
REACTOW 93-01 930104 672.0 H
Portland General Electric *s Board of Directors voted to permanently cease Trojan operations on January 4,
- 1993, i
- 1. F: Forced
- 2. REASON
- 3. METHOD:.
- 4. IEEE Standard 805-1984' S: Scheduled A-Equipment Failure (Expleia) 1-Manual
C-Refuelins 3-Autcunatic Scram.
' D-Regulatory Restriction 4-Other (Explain)
E-Operator Training &
Licensing Examination F-Administrative G-Operational Error (Ex plain)
.B-Other (Explain)
.,1.~._-
.