ML20044C015

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-254/93-07 & 50-265/93-07 on 930302- 04.No Violations Noted
ML20044C015
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 03/09/1993
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Delgeorge L
COMMONWEALTH EDISON CO.
Shared Package
ML20044C016 List:
References
NUDOCS 9303160269
Download: ML20044C015 (2)


See also: IR 05000254/1993007

Text

3 --

. - - . - . _ . - _ -

_-.

-

-

-

. - . _

.

,

-

!

-

'

MAR 9

1993

t

Docke't No. 50-254

,

' Docket No. 50-265

t

i

Commonwealth Edison Company

ATTN: Mr. L. O. DelGeorge

!

Vice President

!

'

Nuclear Oversight and

Regulatory Services

Executive Towers West III

1400 Opus Place, Suite 300

Downers Grove, IL 60515

l

!

Dear Mr. DelGeorge:

This refers to the inspection conducted by Mr. J. H. Neisler of this office on

!

'

March 2-4, 1993.

The inspection included a review of authorized activities

for your Quad Cities Station, Units I and 2.

At the conclusion of the

!

!

inspection, the findings were discussed with those members of your staff

j

identified in the enclosed report. The purpose of the inspection was to

j

l

determine whether existing Quad Cities operating procedures were adequate to

cope with a station blackout pending the future installation of alternate AC

power generators.

Areas examined during the inspection are identified in the report. Within

this area, the inspection consisted of a selective examination of procedures,

.

representative records, observations, and interviews with personnel.

!

l

No violations of NRC requirements were identified during the course of this

inspection.

'

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

.

Sincerely,

t a m E S:0!ID E? C M 3 C. 7

G. C. Wright, Chief

Engineering Branch

l

Enclosure:

Inspection Reports

'

l

No. 50-254/93007(DRS);

No. 50-265/93007(DRS)

See Attached Distribution

!

RIII

RIII

RI

Ri I

j

CV#\\

AW

P

NUisler/jk

Gardner

2h

land

Wrig t

03/09/93

03/c/ /93

03/]/93

.03/f/93

1

le

9303160269 930309

PDR

ADOCK 05000254

0

pm

\\

Y%

-

.

__

.-

,- - _ - _ - . .

. . - . . . - . - . . - - -

'

.

.

_ Commonwealth Edison Company

2

ggg g

1933

i

Distribution

cc w/ enclosure:

R. Pleniewicz, Site Vice

'

President

i

'

R. Bax, Station Manager

'

A. Misak, Regulatory Assurance

Supervisor

D. Farrar, Nuclear Regulatory

Services Manager

DCD/DCB (RIDS)

OC/LFDCB

Resident Inspectors-Quad Cities,

Dresden, LaSalle

Richard Hubbard

J. W. McCaffrey, Chief

Public Utilities Division

LPM, NRR

Robert Newmann, Office of Public

Counsel, State of Illinois

Center

State Liaison Officer

Chairman, Illinois Commerce

i

Commission