Submits Results of Review of & 930211 Telcon Request for Approval for Phased Decommissioning of Existing Liquid Radwaste Sys & Installation of Temporary Liquid Sys as Part of Decommissioning Plan
ML20044B861
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 03/03/1993
From: Pittiglio C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Leslie Hill
LONG ISLAND POWER AUTHORITY
References
NUDOCS 9303110013
Download: ML20044B861 (5)


Text

"

i g nag UNITED STATES f

,j NUCLEAR REGULATORY COMMISSION

  • C WASHtNGTON, D.C. 20556-0001

.o MAR 0 31993 Docket No. 50-322 f

Mr. Leslie Hill, Resident Manager I

Long Island Power Authority g

Shoreham Nuclear Power Station P.O. Box 628 North Country Road l

Wading River, New York 11792

[.

Dear Mr. Hill:

SUBJECT:

APPROVAL 0F DECOMMISSIONING PLAN CHANGE 1

The Nuclear Regulatory Commission staff has reviewed the Long Island Power Authority's (LIPA). letter LSNRC-2004 dated January 5,1993, and supplemental telephone memorandum dated February 11, 1993, (Gisonda/Pittiglio) requesting.

approval for the phased decommissioning of the existing liquid radwaste system, and installation of a temporary liquid radwaste system. 'This request for a change to the Shoreham Decommissioning Plan (DP) was submitted in accordance with Conditions 3 and 4 of the Shoreham Decommissioning Order.

The NRC staff has' completed its review of the proposed changes in LSNRC-2004, I

and approves the phased decommissioning of the liquid radwaste system, and the use of the temporary liquid radwaste system. The temporary system is described in detail in the attachments to LSNRC-2004. The' staff based its approval on the following:. 1) the temporary system, including all temporary piping and valves, will be designed, fabricated,.and tested in accordance Regulatory Guide 1.143; 2) the proposed mobile radwaste filter /demineralizer unit to be furnished by Diversified. Technologies (DT) is a system that has been used at more than 20 nuclear power plants; 3) the DT mobile radwaste filter has sufficient capacity to process the anticipated volume of contaminated water; 4) the temporary system will-be used in compliance with the Offsite Dose Calculation Manual; and 5) the system requires.no change to the Technical Specifications.

The staff did not approve the use of the reactor building salt water drain tank, TK-190, as an alternative method to drain the spent fuel storage pool-

+

(SFSP). The use of the reactor building salt water drain tank alternative was disapproved because: 1) LIPA has not provided sufficient justification for the use of this alternative system to drain the SFSP, 2) LIPA has not demonstrated-how Appendix I requirements will be met, and 3) the use of the salt water drain tank would require a revision to the Offsite Dose Calculatio'n Manual (0DCM) on which the DP releases were approved.

/

i V; e

i-ocuaCT Om/$

nonne 4 L

9303110013 930303 PDR ADOCK 05000322 W

PDR l}

I

Y 4

W 03 W Shoreham Nuclear Power Station Letter dated:

Long Island Power Authority Docket No. 50-322 Mr. Carl Giacomazzo Regional Administrator, Region I President of the Shoreham U.S. Nuclear Regulatory Commission Decommissioning Project 475 Allendale Road Long Island Power Authority King of Prussia, PA 19406 200 Garden City Plaza Garden City, NY 11530 Mr. John C. Brons, President New York Power Authority Mr. Stanley B. Klimberg 123 Main Street President of Shoreham White Plains, NY 10601 Gas Conversion Project and Special Counsel to the Chairman Mr. Richard M. Kessel Long Island Power Authority Chairman & Executive Director 200 Garden City Plaza New York State Consumer Garden City, NY 11530 Protection Board 250 Broadway Mr. Richard Bonnifield New York, NY 10007 General Caunsel Long Island Power Authority Ms. Donna Ross 200 Garden City Plaza New York State Energy Office Garden City, NY 11530 Agency Building 2 Empire State Plaza Herbert M. Leiman, Esq.

Albany, NY 12223 Assistant General Counsel Long Island Lighting Company Nicholas S. Reynolds, Esq.

175 East Old County Road David A. Repka, Esq.

Hicksville, NY 11801 Winston & Strawn 1400 L Street, N.W.

W. Taylor Reveley, III, Esq.

Washington, DC 20005 Hunton & Williams Riverfront Plaza, East Tower Commissioner James T. McFarland 951 East Byrd Street New York Public Service Commission Richmond, VA 23219-4074 814 Ellicott Building 295 Main Street Mr. Stephen Schoenwiesner Buffalo, NY 14203 Shoreham Nuclear Power Station P. O. Box 628 Gerald C. Goldstein, Esq.

Wading River, NY 11792 Office of General Counsel New York Power Authority Mr. John D. Leonard, Jr.

1633 Broadway Vice President Office of Nuclear New York, NY 10019 Long Island Lighting Company Shoreham Nuclear Power Station Carl R. Schenker, Jr., Esq.

P. O. Box 628 0'Melveny & Myers Wading River, NY 11792 555 13th Street, N.W.

Washington, DC 20004 Mr. James H. Joyner U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406

p.

[

MAR 0 31993 j

2 Mr. Ronald L. Nimitz, Senior Radiation Specialist.

U.S. Nuclear Regulatory Commission 475'Allendale Road King of Prussia, PA 19406 James P. McGranery, Jr., Esq.

Dow, Lohnes & Albertson Suite 600 t

1255 - 23rd Street, N.W.

I Washington, DC 20037 i

P I

~t.

f t

t v

i

?

b t

P I

a

p p 0 d 1333 Leslie Hill 2

Should you have any additional questions, you may call me at (301) 504-3438.

Siacerely, CTA inal Siened Dy E

Clayton L. Pittiglio Jr., Project Manager Decommissioning and Regulatory Issues Branch Division of Low-level Waste Managr

...o and Decommissioning Office of Nuclear Material Safety and Safeguards cc: Attached list DISTRIBUTION:

Central File NMSS r/f RBangart WBrach JAustin JSurmeier PLohaus LPittiglio LBell LLWM r/f LLWM t/f SUBJECT ABSTRACT: APPROVAL OF SHOREHAM TEMPORARY SYSTEM f Mark SmallfBoxes"inLConcurrence Block to Define Distribution Copy-Preference In small Box sn "0fCi" 1/nep?ick'ai

^

^C = Cover ~ E '= Cover' & ' Enclosure '

N'= No' Copy

~

o See previous concurrence IOFC :

LLDR f

LLDR tr LLDR g

(

NAME:

LPittiglio*

LBell *-

JAustik DATE:

2/ /93 2/ /93 J/3/93 Path & File Name: P\\:SHORETEMI 0FFICIAL RECORD COPY In small Box on "DATE:" line p7 ace a: M = E-Mail Distribution Copy H = Hard Copy

/

PDR :

YES NO Category:

Proprietary or CF Only.

NO 7 Delete file after distribution ies / No ACNW:

YES ___

N0

/

IG:

YES

F

, W.

Leslie Hill 2

4) the temporary system will be used in compliance with the Offsite Dose Calculation Manual; and (5) the system requires no change to the Technical Specifications.

Should you have any additional questions, you may call me at (301) 504-3438.

Sincerely, Clayton L. Pittiglio Jr., Pr'oject Manager Decommissioning and Reguhtory Division of low-Leve)7'aste Management Issues Branch W

and Decommissionjfig Office of Nuclea/ Material Safety and Safeguar4(

cc: Attached list DISTRIBUTION:

Central File NMSS r/

RBangart WBrach JAustin JSurmeier PLohau-LPittiglio LBell LLWM r/f LLWM t/f SUBJECT ABSTRACT: APPROVAL OF SHOREHA,13 TEMPORARY SYSTEM Mark; Small Boxes in Concurren/e Block to' Define Distribution. Copy Preference

~

In small Box on "0FC:" line placi a': C = Cover' E =~ Cover & Enclosurc

'N = No' Copy FC :

LLDR 6

LLDR LLDR o

o-

[ihlio

)

NAME:

L JAustin DATE:, 2//r//93 f/['/93 2/ 93 i

Path & File Name: P\\:SHORETEMI 0FFICIAL RECORD COPY In small Box on "DAll:" line place a: M = E-Mail Distribution Copy H = Hard Copy PDR :

YES NO Category:

Proprietary or CF Only ACNW:

YES NO Delete file after distribution Yes No IG:

YES NO l