Dr. J. Michael Rowe, Chief FEB 2 81932 Reactor Radiation Division g
70 -/ h National Institute of Standards and Technology U. S. Department of Comerce Gaithersburg, Maryland 20899
Dear Dr. Rowe:
In a telephone conversation between Mr. Tawfik Raby and Mr. Paul Doyle, arrangements were made for an evaluation of the requalification program and licensed personnel at the National Institute of Standards and Technology (NIST). The evaluation visit which is scheduled for March 18, 1992, will be performed in accordance with Operator Licensing Standard ES-606. You should have a copy of this standard.
For the examiners to adequately prepare for this visit, it will be necessary for the facility to furnish the approved items listed in Enclosure 1,
" Reference Material Requirements" at least 60 days prior to the examination date to the following address:
U.S. Nuclear Regulatory Comission Washington, D.C. 20555 ATTN: James L. Caldwell, Mail Stop 10/0/22 Failure to supply the reference material as required by Enclosure 1 may result in postponement of the examination. The Chief Examiner may request that the.
facility submit a proposed examination for use during the examination week in addition to the material requirements of Enclosure 1.
Submission of a proposed examination, even if requested, is optional. However, if a proposed examination is sbbmitted, those personnel participating in its development may-become subject to the security restrictions described below.
It is requested that an employee be provided to complete the examination team.
The employee is expected to be a licensed or previously licensed SR0 at your' facility or similar facility.
If desired by the facility, and agreed to by the Chief Examiner, an additional employee may be a member of the examination team. These individuals must not be scheduled for an NRC-administered examination during this visit. Before commencement of NRC review of the examination, the facility representative will te required to sign a security agreement.
y___ _
(9~7695 C X 2 7 6 j l4 (fg 170079 Q
j 1
l 1
L FEB 2 81992 lq Dr. J. Michael Rowe l
,s l
The facility represe:Aative may continue to train operators with the L
understanding that he or she will not describe details of the exam either content or scope. Should questions arise which are on the exam, these j
questions may be answered provided no indication is given that the question is i
on the exam.
l The facility management is responsible for providing adequate space and accommodations to properly develop and conduct the examinations.,
' Administration of Requalification Examinations," describes our requirements for developing and conducting the examinations., contains the
'NRC Rules and Guidance for Examinees" that will be in effect during the I
administration of the written examination. The fa,cility management is responsible for ensuring that all operators are aware of these rules.
This request is covered by Office of Management and Budget Clearance Number 3150-0101 which expires May 31, 1992. The estimated aver:.ge burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, copying and mailing the required material. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this I
burden, to the Records and Reports Management Branch, Division of Information l
Support Services, Office of Information Resources Management, U.S. Nuclear l
Regulatory Commission, Washington, D.C. 20555; and to the Paperwork Reduction l
Project (3150-0101), Office of Management and Budget, Washington, D.C. 20503.
j l
Thank you for your consideration in this matter.
If you have any questions l
on the evaluation process, please contact Mr. James L. Caldwell, at (301) 504-1042.
Sincerely, James L. Caldwell, Chief Nonpcwer Reactor Section Operator Licensing Branch Division of Licensee Performance and Quality Evaluation j
Office of Nuclear Reactor Regulation j
Enc 1osures:
1.
Reference Material Requirements 2.
Administration of Requalification Examinations 3.
NRC Rules and Guidance for Examinees 4.-
Security Agreements cc w/encls:
Mr. Tawfik Raby, NIST j
Distribution:
)
RGallo Facility Operations Manager JCaldwell PDoyle, OLB Examiner DMcCain TMichaels, PM p
Central Files PQ Ot.B -
Q Facility File n: dim PD le well Facility Training Coordinator 0/fi/92 02$$/92 02/
92 i
I
\\ '
t L.
h ENCLOSURE 1 i
! 4 C
REFERENCE MATERIAL REOUIREMENTS Test items to support all aspects of the requalification examination must be i
provided to the NRC 60 days prior to the examination date, as specified in Enclosure I to ES-606.
1.
Existing learning objectives, students handouts and lesson' plans (including training manuals, plant orientation manual, system l
descriptions,reactortheory, thermodynamics,etc.)
l Training materials should include all substantive written material used for preparing applicants for initial R0 and SRO licensing. The written material should include learning objectives if available and the details presented during lectures, rather than outlines. Training materials l
should be identified, bound, and indexed. -Training materials which include the following should be provided:
i System descriptions including descriptions of all operationally relevant flow paths, components, controls and instrumentation.
System training material should draw parallels to.the actual procedures used for operating and applicable system.
Complete and operationally useful descriptions of all safety-system interactions, secondary interactions under emergency and abnormal conditions, including consequences of anticipated J
operator error, maintenance error, and equipment failure.
]
Training material used to clarify and strengthen understanding of 1
emergency operating procedures.
2.
Complete Procedure Index (including temporary procedures).
\\
3.
All administrative procedures as applicable to reactor operation or safety.
4.
All integrated plant procedures, normal or general operating procedures and procedures for experiments.
5.
All emergency procedures, emergency instructions, abnormal or special procedures.
6.-
Standing orders or procedures changed by reactor supervision and important orders or changes that are safety related and may' supersede the regular-procedures.
1 7.
Applicable procedures (procedures that are run frequently)~.
8.
Fuel-handling and core-loading procedures and initial core-loading l
procedures, when appropriate.
l 9.
Any annunciator / alarm procedures, as applicable.
-l L
L 0
t j
Enclosure l1(ccot{nued)- ;
.f
(
10.
Radiation protection manual, radiation control manual or procedures.
l i
11.
Emergency plan inaplementing procedures.
l l
12.
Technical Specifications and interpretations, if available.
13.
System operating procedures, including experiments.
14.
Piping and instrumentation diagrams, electrical single-line diagrams, or i
flow diagrams, as applicable.
i
'15.
Technical Data Bock, and/or plant curve information as used by operators i
and facility precautions, limitations, and set points for the facility.
i 16.
Additional material as requested by the examiners to develop l
examinations that meet the requirements of the Non-power Reactor l
Examiner Standards-and Regulations.
l The above reference material should be approved final issues and so marked.
If a facility has not finalized some of the material, the Chief Examiner j
should verify with the facility that the most complete, up-to-date material is i
available and that agreement has been reached with the licensee for limiting
+
changes before the administration of the examination.
j l
'l 1
j l
r k
s 1
1 i
i
ENCLOSURE 2
\\
ADMINISTRATION OF RE0VALIFICATION EXAMINATIONS 1.
The reference material will be reviewed by the chief examiner.
2.
I single room shall be provided for the written examination. The location of this room and supporting rest room facilities shall be such as to prevent contact with all other facility and/or contractor personnel for the duration of the examination.
3.
Minimum spacing is required to ensure examination integrity and will be evaluated by the chief examiner. Minimum spacing consists of one examinee per table and a 3-foot space between tables. No wall charts, models, and/or other training materials shall be present in the examination room.
4.
Copies of reference material for the written examination shall be provided for each examinee. The reference material will consist of Technical Specifications, operating / abnormal procedures, administrative procedures, and Emergei,cy Plans as available to the plant operators.
5.
An attempt will be made to distinguish between R0 and SRO knowledge and abilities to the extent that such a distinction is supported by the facility training materials.
6.
Prudent scheduling of the exam week activities is important to help alleviate undue stress on the operators. Your training staff and the Chief Examiner should work very closely in formulatino a schedule which does not result in excessive delays in individuals being administered their examination.
a
n ENCLOSURE 3 3
NRC RULES AND GUIDANCE FOR EXAMINEES 1.
Use black ink or dark pencil ONLY to facilitate legible reproduction.
2.
Print your name in the blank provided on the cover sheet of the examination.
3.
Fill in the date on the cover sheet of the examination, if necessary.
4.
Answer each question on.the examination.
5.
Use abbreviations only if they are commonly used in facility literature.
6.
The point value for each question is indicated in parentheses after the question.
7.
Show all calculations, methods or assumptions used to obtain an answer to mathematical problem, whether asked for in the question or not.
(This does not apply to multiple choice questions.)
8.
Unless solicited, the location of references need not be stated.
9.
If parts of the examination are not clear with respect to their intent, ask questions of the examiner only.
10.
You must sign the statement on the cover sheet that indicates the work on the examination is your own and that you have not received or been given any assistance in completing the examination. This must be signed AFTER the examination has been completed.
II.
Rest room trips are to be limited and only one examinee at a time may leave. You must avoid all contact with anyone outside the examination room to avoid even the appearance or possibility of examination compromise.
12.
Chcating on the examination would result in a revocation of your license and could result in more severe penalties.
13.
Each section of the examination is designated to take approximately 60 minutes to complete. You will be given 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> to complete the examination.
14.
When you are finished and have turned in your completed examination, leave the examination area.
15.
To pass the examination, you must achieve at least 70% in each category.
r i
Enclosure.3 (continued) 2-j 16.
Proportional grading will be applied. Any additional wrong 'information l
that is provided may count against you, for example, if a question is worth one point and asks for four responses, each of which is worth 0.25 i
points, and you give five responses, each of your responses will be worth 0.20 points.
If one of your five responses is incorrect, 0.20 t
will be deducted and your total credit for that question will be 0.80 instead of 1.00 even though you got the four correct answers.
I
[
1 l
t l
8 4
h I
1 i
'?
b l
t l
1 l
1 e
1
. I
ENCLOSURE 4 PRE-EXAMINATION SECURITY AGREEMENT I
agree that I will not knowingly divulge any Print Name information concerning the requalification examination for to any unauthorized persons.
i
=
/
Signature Date
~
POST EXAMINATION SECURITY AGREEMENT I
did not, to the best of my knowledge, divulge Print Name any information concerning the examination administered on to any unauthorized persons.
/
Signature Date 9
%