ML20044B408

From kanterella
Jump to navigation Jump to search
Notice of Withdrawal of Application for Amend to License NPF-62,revising License Condition 2.E Re Security Plan Requirements
ML20044B408
Person / Time
Site: Clinton Constellation icon.png
Issue date: 07/30/1990
From: Samworth R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20044B409 List:
References
NUDOCS 9008020191
Download: ML20044B408 (2)


Text

,,

i j

~

7590-01 i

UNITEDSTATESNUCLEARREGULATOR{ COMMISSION ILLIN0IS POWER COMPANY. ET AL.

i DOCKET NO. 50-461 NOTICE OF WITHDRAWAL OF APPLICATION FOR AMENDMENT TO FACILITY OPERATING LICENSE The United States Nuclear Regulatory Comission (the Comission) has granted the request of Illinois Power Company and Soyland Power Cooperatite.

{

Inc. to withdraw a part of its February 5, 1988 application for proposed r

i amendment to Facility Operating License No. NPF-62 for the Clinton Power Station, Unit No. 1, located in DeWitt County, Illinois.

The proposed amendment would have revised the License Condition 2.E concerning certain security

,an requirements.

The Comission has previously issued a Notice of Consideration of Issuance of Amendment and Proposed No Significant Hazards Consideration l

Determination published in the FEDERAL REGISTER on December 14, 1988

.f (53 FR 50327). However, by telephone conversation on July 3, 1990, the licensee withdrew the proposed change..

i For further details with respect to this action, see the application 1

for amendment dated February 5,1988, and Amendment No. 41 to Facility i

)

Operating Licensee No.' NPF-62 which granted the balance of the licensee's requested change and addressed the withdrawal of the proposed change to License Condition 2.E.

The above documents are available for public 900802019

)730 DR ADOC jog 1

2 inspection at the Comission's Public Document Room, 2120 L Street, N.W.,

Washington, D.C., and the Vespasian Warner Public Library,120 West Johnson Street, Clinton, Illinois 61727.

Dated at Rockville, Maryland this 30th day of July 1990.

FOR THE NUCLEAR REGULATORY COMMISSION i

Robert S. Samworth, Acting Director i

Project Directorate III-3 Division of Reactor Projects - III, IV, Y and Special Prtjects Office of Nuclear Reactor Regulation I

4 4

,-.-