Amend 37 to License NPF-62,changing Tech Spec Table 3.6.4-1 to Add Certain Valves Associated W/Containment Penetrations 17,35,36 & 42 to List of Containment Isolation Valves to Ensure Availability of Four Testable Valves
ML20044A744
Person / Time
Site: Clinton 
Issue date: 06/25/1990
From: Hannon J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20044A745 List:
References
NUDOCS 9007020167
Download: ML20044A744 (10)


Text

...

'... [4 Jg UNITED STATES NUCLEAR REGULATORY COMMISSION g

li t 8-WASHINGTON, D, C,20$55 t

ILLIN0IS POWER COMPANY, ET AL.

DOCKET NO. 50-461-CLINTON POWER STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.37-License No. NPF.

1.

The Nuclear Regulatory Comission (the Commission) has found-that:.

Theapplicationforamendmentby(thelicensees) dated. June 30, Illinois Po A.

Soyland Power Cooperative, Inc.

1989, complies with;the standards and re Eriergy Act of 1954, as amended (the Act)quirements of the Atomic-

, and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the-provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable' assurance (i) that the activities authorized.by.

this amendment can be conducted without endangering the health and-safety of the public, and (ii) that such activities will be conducted in compliance with the Commiss br's regulations; D.

The issuance of this amendment will not'be inimical to the common defense and security or to the health and safety of-the'public; and E.

The issuance of this amendment is in accordance with 10 CFR Part-51 of the Commission's regulations and all applicable requirements.have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifi-cations as indicated in the attachment to this license. amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-62 is hereby.

i amended to read as follows:

" Illinois Power Company is authorized to act as agent for Soyland Power-Cooperative, Inc. and has exclusive responsibility and control over the physical construction, operation and maintenance of the facility.

l 9007020?67 9006 5 2

PDR ADOCK 05000461 P

PDC

L' 2

(2) Technical Specifications and Environmental Protection Plan The Technical-Specifications contained in Appendix A and the.

Environmental Protection Plan contained,in Appendix B as revised through Amendment No.37

, are hereby incorporated into this-license.

Illinois Power Company shall operate the facility in accordance with the Technical Specifications and the Environmental-Protection Plan.

3.

This license amendment is effective as of its date of issuance.

~

FOR THE NUCLEAR REGULATORY COMMISSION John N. Hannon, Director Project Directorate 111-3 Division of Reactor Projects - 111, IV, Y and Special Projects Office of Nuclear Reactor Rtgulation

Attachment:

Changes to the Technical Specifications Date of issuance: June 25, 1990

ATTACHMENT TO LICENSE AMENDMENT NO.37-FACILITY OPERATING LICENSE NO. NPF-62 DOCKET NO. 50-461 Replace the following oages of the Appendix "A" Technical Specifications with the attached pages.

Tie revised pages are identified by amendment number and contain vertical;1ines indicating the area of change. Corresponding overleaf pages are provided to maintain document completeness.

Remove Insert 3/4 6-44 3/4 6-44 3/4 6-46 3/4 6-46 3/4 6-53 3/4 6-53 3/4 6-55 3/4 6-55 i

4 l

l l

1 -,

,r

,-s,.

~

v-

TABLE 3.b.4-1 (Continued)

O CONTAINNENT ISCLATION VALVES EE w

E MXINUN SECONDARY

-)

APPLICABLE ISOLATION CONTAINMENT TEST

{

E VALVE PENETRATION ISOLATION OPERATIUMAL TIE BYPASS PATM PRESSURE t

  • 1 NUMBER NUMBER SIGNAlt CONDITIONS (Seconds)

(YES/MO)

(psig)*

w Test Connections Vents, and Drains *) (Continued)

I l

6)

Feedwater/RHR Line B 10 NA NA 9.0 IB21-F0638 1821-F0308 1, 2, 3,#

Yes IE12-F0588 1,2,3 No 1,2,3 No IE12-F3498 1G33-F057 1,2,3 No 1,2,3 No R 7)

RHR A Suction 11 MA 1,2,3 NA No 9.9 I

IE12-F3344

.j T

1E12-F3354 tap 8)

RHR 8 Suction 12 NA 1, " 2, 3 NA No 9.9 l!

4 l

1E12-F3348 i

1E12-F3358 s-9)

RHR C Suction 13 NA 1,2,3 NA No 9.9 1E12-F334C

'l IE12-F335C i

10) RHR Shutdown Cooling 14 NA 1,2,3 NA No 9.0 IE12-F001 l'

i oE

@ @& 11) RHR/LPCI A Injection 15 NA 1,2,3 NA No

9. 0 -

l

[

IE12-F107A

. 23 1E12-F331A 1E12-F329A

?

e*

  • 12) RHR/LPCI B Injection 16 NA 1,2,3

.NR No

9. 0 -

I

~=

1E12-F1078 I

IE12-F3318 L

1E12-F3298

~

e--

a

TABLE 3.6.4-1 (Continued) n C

CONTAINNENT ISOLATION VALVES

^

5 a

!i!

~

TAXIMUM-

' SECONDARY c-APPLICABLE ISOLATION' CONTAIMENT TEST l

j j'i VALVE PENETRATION ISOLATION OPERATION L TIE BYPASS PATH PRESSURE

]

NUMER NUMER SIGNAlt CONDITIONS (Seconds)

(YES/NO)

(psig)5 1

Test Connections, Vents and Drains (a) (Continued) j

13) RHR/LPCI C Injection 17 NA 1, 2, 3 FA No 9.0 1E12-F0%C IE12-F351 4

IE12-F4568 l

14) RHR A Test Line 18 NA 1, 2, 3 M4 No 9.0

[

IE12-F365A w.1 IE12-F366A IE21-F346 A'

IE21-F347 I

i 2

1E12-F414 IE12-F415

'1E12-F418 IE12-F419 t

IE12-F420 1E12-F421

15) RHR C Test Line 19 NA 1, 2, 3.

M No 9.0 1E12-F353 1E12-F354 l

IE12-F428 j

k 1E12-F429 I 16) RHR B Test Line 20 M

1, 2, 3 m

No

~ 9.0 g

IE12-F3658 1E12-F3668

.2 P

1E12-F426 IE12-F427

%?

w F

~

~

~

~T-

~ ~ ^ '

+..

TABLE 3.b.4-1 (Continued) ng CONTAINMENT ISOLATION VALVES

'IE NAXINUM SECONDARY APPLICA8tE ISOLATION CONTAINNENT1 TEST E

VALVE PENETRATION ISOLATION OPERATIONAL. TINE BYPASS PATM. PRESSURE Z

NUMBER NUMBER SIGNAtt CONDITIONS (Seconds)

(YES/NO)

(psIc)*

I Test Connections Vents and Drains *} (Continued) l

17).RHR HX 24 NA 1,2,3 M

No 9.0 l

IE12-F432A 1E12-F433A

18) RHR HX 26 NA 1, 2, 3 NA No 9.0 1E12-F4328 l

IE12-F4338

  • 19) RCIC Pump Section 28 NA 1,2,3 NA No 9.9 l

T 1E51-F336 1E51-F337

20) RCIC Suction Release Discharge 31 MA 1,2,3 h

No 9.9 l

1E12-F436 IE12-F437

21) LPCS Pump Suction 32 NA 1,2,3 NA No 9.9 IE21-F331 l

1E21-F344 F 22) HPCS Test To Supp. Pool 33

.. NA 1, 2, 3 NA No 9.9 l

1E22-F376 M&

$ 23) Supp. Pool Cleanup Pump m "

Suction 34 NA 1,2,3 NA No.

_ 9. 9 l

~F 1SF034 5h a >

TABLE 3.6.4-1 (Continued) c3

.h CONTAINNENT ISOLATION VALVES 3

l z

i MXINUN SECONDARY e

APPLICABLE ISOLATION CONTAIMENT TEST 5

VALVE PENETRATION ISOLATION OPERATl0NAL TIE BYPASS PATH PRESSURE-

]

NUE ER NUMER SIGNAtt COWITIONS (Seconds)

(YES/ND)

(psig)*

Test Connections Vents and Drains (a) (Continued)

24) HPCS Pump Discharge 35 NA 1,2,3 M

No 9.0 1E22-F021 1E22-F3668 1

25) LPCS Pump Discharge 36 NA 1,2,3 NA No 9.0 IE21-F013 w

.IE21-F358 1

1E21-F356A m

i 26) RCIC 41 NA 1,2,3 NA No --

9.0 IE51-F041 4

27) Head Spray 42 NA 1,2,3

. NA..

No S.0' 1E51-F034-IE51-F391

.IE12-F061' 1E51-F367 1

28) RCIC Turb Steam Supply 43 NA 1, 2, 3 M

No 9.0

-1E51-F399 1E51-F072

)

. k IE51-F401 o

29) RCIC Turb Vacuum Breaker l

3 1E51-F080

.44 NA 1,2,3 NA No 9.0 1E51-F082 2

P IE51-F375 w

1E51-F376

?

1E51-F083 1

w N

l' S

m u-9.-.m

...m,

.y g-

TABLE 3.6.4-1 (Contimy;jd b

CONTAIMENT ISOLATION VALVES

^

E 4

NAXINUM SECONDARY c-APPLICABLE ISOLATION CONTAINMENT TEST 5-VALVE PENETRATION ISOLATION OPERATIONAL TIME BYPASS PATH PRESSURE

]

NUMBER NUMER SIGNAtt CONDITIONS (Seconds)

(YES/NO)

(psigP Other Isolation Valves (Continued) t 9)

RHR C Suction Line 13 NA 1, 2, 3 M

No 9.9 4

IE12-F105 t

10) RHR A Shutdown Cooling 14 NA 1,2,3 M

No 9.0 1E12-F475

11) RHR/LPCI A Injection 15 NA 1,2,3 M

No 9.0 w

1 1E12-F027A i

IE12-F042A J,

IE12-F028A 2

w j

12) RHR/LPCI B Injection

-16 M

1,2,3 M

.No 9.0

-1E12-F0278 IE12-F0428

~

IE12-F0288 l

13) RHR/LPCI C Injection 17 NA 1,2,3 M

No 9.0 IE12-F042C IE12-F041C i

1E12-F301C t

h 14) RHR A/LPCS Test Line 18 M.

1, 2, 3 m

No 9.9 R

1E21-F011 i

g IE12-F064A o

)

$ 15) RHR C Test Line-19 M

1, 2,- 3 M

No 9.9

.o IE12-F064C 16)' RHR B Test Line 20 M

1, 2, 3 M

No 9.9 I

1E12-F0648 i

l a

r i

I TABLE 3.6.4-1 (Continued) g" CONTAINMENT ISOLATION VALVES 5

g mMIMUM SECONDARY

-i APPLICABLE ISOLATION -CONTAINMENT TEST E

VALVE PENETRATION ISOLATION OPERATIOmL TIME BYPASS PATH PRESSURE,'

Q MUPEER NUMBER SIGNAlt COWITIONS (Seconds)

(YES/NO)

(psie)*'

Other Isolation Valves (Continued)

17) RHR A Suction Re1fef 21 NA 1,2,3 m.

No 9.9 1E12-F017A

18) RHR Shutdoun Cool Relief 23 NA 1,2,3 m

No 9.9 IE12-F005

19) RINt A HX Relief Line 24 m

1, 2, 3 m

No 9.9 i

IE12-F0554

,X

20) RHR 8 Suction Relief 25 NA 1,2,3 m

- No 9.9 g,

IE12-F0178 a

21) RHR 8 HM Relief Line 26 m

1, 2, 3 hk No 9.9 j

1E12-F0558

22) RHR/LPCI B Inj. Relief 27 m

1, 2, 3 m

No 9.0 1E12-F0258 i

23) RHR C Suction Relief 29 M

1,2,3 m

No

9. 9.

l l

1E12-F101

24) RHR/LPCI C Inj. Relief 30 NA 1,2,3 m.

No 9.9

.I 1E12-F025C i

'?

25) RHR To RCIC Section Relief 31 m

1, 2,'3 m

.. No 9.9 IE12-F036 i

26) LPCS Section Line 32 NA 1,2,3 m

No

. 9.9 l

1E21-F001 p

l

+

j'

-~

~

r " - ~ wa

-w

+ v -

m--

+ae ~ -

r

TABLE 3.6.4-1 (Continued) n C

CONTAIMENT ISOLATION VALVES

'ie MXINUM SECONDARY APPLICABLE ISOLATION CONTAIMENT TEST VALVE PENETRATION ISOLATION OPERATIONAL TIPE BYPASS PATH PRESSURE c-g NUMBER NUPBER SIGNAlt CONDITIONS (Seconds)

(YES/ND)

(psig)*

  • Other Isolation Valves (Continued)
27) HPCS Test Line & Relief 33 NA 1, 2, 3 NA No 9.9 IE22-F014 1E22-F035 1E22-F039 IE22-F012
28) HPCS Injection Line 35 NA 1, 2, 3 NA No 9.0 1E22-F004

~

R' IE22-F005 IE22-F304

29) LPCS Injection Line 36 NA 1,2,3 NA No 9.0 o'

IE21-F005 IE21-F006 IE21-F340

30) HPCS Suction Line 37 NA 1, 2, 3 m

No 9.9 IE22-F015

31) LPCS Pump Relief Line 38 NA 1, 2, 3 NA Na 9.9 IE21-F018

-1E21-F031

32) RCIC Nin. Flow Relief 40 NA 1,2,3

-NA No

9. 9 y

1E51-F090 g

IE51-F019 o.

l 33) RCIC Turbine Exhaust 41 NA 1,2,3 NA-No 9.9

<+

IE51-F068 y

1E51-F040

34) RCIC Head Spray 42 NA 1, 2, 3 NA No 9.0 w

'1E51-F013 1E51-F066 1E51-F316

- =. -

j i

l TA8LE 3.6.4-1 (Continued) p CONTAINMENT ISOLATION VALVES E

I z

e MXIfRM SEC0 4ARY c

VALVE APPLICABLE IS0tATION CONTAlleqENT TEST PENETRATION ISOLATION OPERATIOML TIME BYPASS PATH ' PRESSURE NUMBER NUPBER SIGNAtt COWITIONS (Seconds) _(YES/ND)

(psig)*

Other Isolation Valves (Continued)

Primary Containment (Continued)

35) SX To Containment Cooler 48 M

1, 2, 3 m

No

9. 0 ISXO89A 1SX088A
36) Instrument Air 57 NA 1, 2, 3 M

No

9. 0 IIA 175 i
37) Instrument Air Bottles

' 58 NA w1 IIA 0428 1, 2, 3,#.

M Yes 9.0 e,

11A012A-

38) CRD 63 NA j

IC11-F122 1, 2, 3,#

M Yes 9.0 i'

IC11-F083

39) RHR Flush Line 76 NA 1,2,3 NA No 9.9 1E12-F030 4
40) RHR/LPCI A Injec. Relief 87-M 1

1E12-F025A 1, 2, 3 NA No 9.0

41) RHR HX A Vent 89 NA 1,2,3 M

No 9.9 1E12-F074A I

I

~

)