'... [4 Jg UNITED STATES NUCLEAR REGULATORY COMMISSION g
li t 8-WASHINGTON, D, C,20$55 t
ILLIN0IS POWER COMPANY, ET AL.
DOCKET NO. 50-461-CLINTON POWER STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.37-License No. NPF.
1.
The Nuclear Regulatory Comission (the Commission) has found-that:.
Theapplicationforamendmentby(thelicensees) dated. June 30, Illinois Po A.
Soyland Power Cooperative, Inc.
1989, complies with;the standards and re Eriergy Act of 1954, as amended (the Act)quirements of the Atomic-
, and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the-provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable' assurance (i) that the activities authorized.by.
this amendment can be conducted without endangering the health and-safety of the public, and (ii) that such activities will be conducted in compliance with the Commiss br's regulations; D.
The issuance of this amendment will not'be inimical to the common defense and security or to the health and safety of-the'public; and E.
The issuance of this amendment is in accordance with 10 CFR Part-51 of the Commission's regulations and all applicable requirements.have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifi-cations as indicated in the attachment to this license. amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-62 is hereby.
i amended to read as follows:
" Illinois Power Company is authorized to act as agent for Soyland Power-Cooperative, Inc. and has exclusive responsibility and control over the physical construction, operation and maintenance of the facility.
l 9007020?67 9006 5 2
PDR ADOCK 05000461 P
L' 2
(2) Technical Specifications and Environmental Protection Plan The Technical-Specifications contained in Appendix A and the.
Environmental Protection Plan contained,in Appendix B as revised through Amendment No.37
, are hereby incorporated into this-license.
Illinois Power Company shall operate the facility in accordance with the Technical Specifications and the Environmental-Protection Plan.
3.
This license amendment is effective as of its date of issuance.
~
FOR THE NUCLEAR REGULATORY COMMISSION John N. Hannon, Director Project Directorate 111-3 Division of Reactor Projects - 111, IV, Y and Special Projects Office of Nuclear Reactor Rtgulation
Attachment:
Changes to the Technical Specifications Date of issuance: June 25, 1990
ATTACHMENT TO LICENSE AMENDMENT NO.37-FACILITY OPERATING LICENSE NO. NPF-62 DOCKET NO. 50-461 Replace the following oages of the Appendix "A" Technical Specifications with the attached pages.
Tie revised pages are identified by amendment number and contain vertical;1ines indicating the area of change. Corresponding overleaf pages are provided to maintain document completeness.
Remove Insert 3/4 6-44 3/4 6-44 3/4 6-46 3/4 6-46 3/4 6-53 3/4 6-53 3/4 6-55 3/4 6-55 i
4 l
l l
1 -,
,r
,-s,.
~
v-
TABLE 3.b.4-1 (Continued)
O CONTAINNENT ISCLATION VALVES EE w
E MXINUN SECONDARY
-)
APPLICABLE ISOLATION CONTAINMENT TEST
{
E VALVE PENETRATION ISOLATION OPERATIUMAL TIE BYPASS PATM PRESSURE t
- 1 NUMBER NUMBER SIGNAlt CONDITIONS (Seconds)
(YES/MO)
(psig)*
w Test Connections Vents, and Drains *) (Continued)
I l
6)
Feedwater/RHR Line B 10 NA NA 9.0 IB21-F0638 1821-F0308 1, 2, 3,#
Yes IE12-F0588 1,2,3 No 1,2,3 No IE12-F3498 1G33-F057 1,2,3 No 1,2,3 No R 7)
RHR A Suction 11 MA 1,2,3 NA No 9.9 I
IE12-F3344
.j T
1E12-F3354 tap 8)
RHR 8 Suction 12 NA 1, " 2, 3 NA No 9.9 l!
4 l
1E12-F3358 s-9)
RHR C Suction 13 NA 1,2,3 NA No 9.9 1E12-F334C
'l IE12-F335C i
- 10) RHR Shutdown Cooling 14 NA 1,2,3 NA No 9.0 IE12-F001 l'
i oE
@ @& 11) RHR/LPCI A Injection 15 NA 1,2,3 NA No
- 9. 0 -
l
[
IE12-F107A
. 23 1E12-F331A 1E12-F329A
?
e*
- 12) RHR/LPCI B Injection 16 NA 1,2,3
.NR No
- 9. 0 -
I
~=
IE12-F3318 L
~
e--
a
TABLE 3.6.4-1 (Continued) n C
CONTAINNENT ISOLATION VALVES
^
5 a
!i!
~
TAXIMUM-
' SECONDARY c-APPLICABLE ISOLATION' CONTAIMENT TEST l
j j'i VALVE PENETRATION ISOLATION OPERATION L TIE BYPASS PATH PRESSURE
]
NUMER NUMER SIGNAlt CONDITIONS (Seconds)
(YES/NO)
(psig)5 1
Test Connections, Vents and Drains (a) (Continued) j
IE12-F4568 l
- 14) RHR A Test Line 18 NA 1, 2, 3 M4 No 9.0
[
IE12-F365A w.1 IE12-F366A IE21-F346 A'
IE21-F347 I
i 2
1E12-F414 IE12-F415
'1E12-F418 IE12-F419 t
IE12-F420 1E12-F421
- 15) RHR C Test Line 19 NA 1, 2, 3.
M No 9.0 1E12-F353 1E12-F354 l
IE12-F428 j
k 1E12-F429 I 16) RHR B Test Line 20 M
1, 2, 3 m
No
~ 9.0 g
IE12-F3658 1E12-F3668
.2 P
1E12-F426 IE12-F427
%?
w F
~
~
~
~T-
~ ~ ^ '
+..
TABLE 3.b.4-1 (Continued) ng CONTAINMENT ISOLATION VALVES
'IE NAXINUM SECONDARY APPLICA8tE ISOLATION CONTAINNENT1 TEST E
VALVE PENETRATION ISOLATION OPERATIONAL. TINE BYPASS PATM. PRESSURE Z
NUMBER NUMBER SIGNAtt CONDITIONS (Seconds)
(YES/NO)
(psIc)*
I Test Connections Vents and Drains *} (Continued) l
No 9.0 l
IE12-F432A 1E12-F433A
- 18) RHR HX 26 NA 1, 2, 3 NA No 9.0 1E12-F4328 l
IE12-F4338
- 19) RCIC Pump Section 28 NA 1,2,3 NA No 9.9 l
T 1E51-F336 1E51-F337
- 20) RCIC Suction Release Discharge 31 MA 1,2,3 h
No 9.9 l
1E12-F436 IE12-F437
- 21) LPCS Pump Suction 32 NA 1,2,3 NA No 9.9 IE21-F331 l
1E21-F344 F 22) HPCS Test To Supp. Pool 33
.. NA 1, 2, 3 NA No 9.9 l
1E22-F376 M&
$ 23) Supp. Pool Cleanup Pump m "
Suction 34 NA 1,2,3 NA No.
_ 9. 9 l
~F 1SF034 5h a >
TABLE 3.6.4-1 (Continued) c3
.h CONTAINNENT ISOLATION VALVES 3
l z
i MXINUN SECONDARY e
APPLICABLE ISOLATION CONTAIMENT TEST 5
VALVE PENETRATION ISOLATION OPERATl0NAL TIE BYPASS PATH PRESSURE-
]
NUE ER NUMER SIGNAtt COWITIONS (Seconds)
(YES/ND)
(psig)*
Test Connections Vents and Drains (a) (Continued)
- 24) HPCS Pump Discharge 35 NA 1,2,3 M
No 9.0 1E22-F021 1E22-F3668 1
- 25) LPCS Pump Discharge 36 NA 1,2,3 NA No 9.0 IE21-F013 w
.IE21-F358 1
i 26) RCIC 41 NA 1,2,3 NA No --
9.0 IE51-F041 4
- 27) Head Spray 42 NA 1,2,3
. NA..
No S.0' 1E51-F034-IE51-F391
.IE12-F061' 1E51-F367 1
- 28) RCIC Turb Steam Supply 43 NA 1, 2, 3 M
No 9.0
-1E51-F399 1E51-F072
)
. k IE51-F401 o
- 29) RCIC Turb Vacuum Breaker l
.44 NA 1,2,3 NA No 9.0 1E51-F082 2
P IE51-F375 w
?
w N
l' S
m u-9.-.m
...m,
.y g-
TABLE 3.6.4-1 (Contimy;jd b
CONTAIMENT ISOLATION VALVES
^
E 4
NAXINUM SECONDARY c-APPLICABLE ISOLATION CONTAINMENT TEST 5-VALVE PENETRATION ISOLATION OPERATIONAL TIME BYPASS PATH PRESSURE
]
NUMBER NUMER SIGNAtt CONDITIONS (Seconds)
(YES/NO)
(psigP Other Isolation Valves (Continued) t 9)
RHR C Suction Line 13 NA 1, 2, 3 M
No 9.9 4
IE12-F105 t
- 10) RHR A Shutdown Cooling 14 NA 1,2,3 M
No 9.0 1E12-F475
- 11) RHR/LPCI A Injection 15 NA 1,2,3 M
No 9.0 w
1 1E12-F027A i
IE12-F042A J,
IE12-F028A 2
w j
- 12) RHR/LPCI B Injection
-16 M
1,2,3 M
.No 9.0
-1E12-F0278 IE12-F0428
~
IE12-F0288 l
- 13) RHR/LPCI C Injection 17 NA 1,2,3 M
No 9.0 IE12-F042C IE12-F041C i
h 14) RHR A/LPCS Test Line 18 M.
1, 2, 3 m
No 9.9 R
g IE12-F064A o
)
$ 15) RHR C Test Line-19 M
1, 2,- 3 M
No 9.9
.o IE12-F064C 16)' RHR B Test Line 20 M
1, 2, 3 M
No 9.9 I
l a
r i
I TABLE 3.6.4-1 (Continued) g" CONTAINMENT ISOLATION VALVES 5
g mMIMUM SECONDARY
-i APPLICABLE ISOLATION -CONTAINMENT TEST E
VALVE PENETRATION ISOLATION OPERATIOmL TIME BYPASS PATH PRESSURE,'
Q MUPEER NUMBER SIGNAlt COWITIONS (Seconds)
(YES/NO)
(psie)*'
Other Isolation Valves (Continued)
- 17) RHR A Suction Re1fef 21 NA 1,2,3 m.
No 9.9 1E12-F017A
- 18) RHR Shutdoun Cool Relief 23 NA 1,2,3 m
No 9.9 IE12-F005
- 19) RINt A HX Relief Line 24 m
1, 2, 3 m
No 9.9 i
IE12-F0554
,X
- 20) RHR 8 Suction Relief 25 NA 1,2,3 m
- No 9.9 g,
IE12-F0178 a
- 21) RHR 8 HM Relief Line 26 m
1, 2, 3 hk No 9.9 j
- 22) RHR/LPCI B Inj. Relief 27 m
1, 2, 3 m
No 9.0 1E12-F0258 i
- 23) RHR C Suction Relief 29 M
1,2,3 m
No
- 9. 9.
l l
- 24) RHR/LPCI C Inj. Relief 30 NA 1,2,3 m.
No 9.9
.I 1E12-F025C i
'?
1, 2,'3 m
.. No 9.9 IE12-F036 i
- 26) LPCS Section Line 32 NA 1,2,3 m
No
. 9.9 l
l
+
j'
-~
~
r " - ~ wa
-w
+ v -
m--
+ae ~ -
r
TABLE 3.6.4-1 (Continued) n C
CONTAIMENT ISOLATION VALVES
'ie MXINUM SECONDARY APPLICABLE ISOLATION CONTAIMENT TEST VALVE PENETRATION ISOLATION OPERATIONAL TIPE BYPASS PATH PRESSURE c-g NUMBER NUPBER SIGNAlt CONDITIONS (Seconds)
(YES/ND)
(psig)*
- Other Isolation Valves (Continued)
~
R' IE22-F005 IE22-F304
- 29) LPCS Injection Line 36 NA 1,2,3 NA No 9.0 o'
IE21-F005 IE21-F006 IE21-F340
- 30) HPCS Suction Line 37 NA 1, 2, 3 m
No 9.9 IE22-F015
- 31) LPCS Pump Relief Line 38 NA 1, 2, 3 NA Na 9.9 IE21-F018
-1E21-F031
- 32) RCIC Nin. Flow Relief 40 NA 1,2,3
-NA No
- 9. 9 y
IE51-F019 o.
l 33) RCIC Turbine Exhaust 41 NA 1,2,3 NA-No 9.9
<+
IE51-F068 y
- 34) RCIC Head Spray 42 NA 1, 2, 3 NA No 9.0 w
'1E51-F013 1E51-F066 1E51-F316
- =. -
j i
l TA8LE 3.6.4-1 (Continued) p CONTAINMENT ISOLATION VALVES E
I z
e MXIfRM SEC0 4ARY c
VALVE APPLICABLE IS0tATION CONTAlleqENT TEST PENETRATION ISOLATION OPERATIOML TIME BYPASS PATH ' PRESSURE NUMBER NUPBER SIGNAtt COWITIONS (Seconds) _(YES/ND)
(psig)*
Other Isolation Valves (Continued)
Primary Containment (Continued)
- 35) SX To Containment Cooler 48 M
1, 2, 3 m
No
- 9. 0 ISXO89A 1SX088A
- 36) Instrument Air 57 NA 1, 2, 3 M
No
- 9. 0 IIA 175 i
- 37) Instrument Air Bottles
' 58 NA w1 IIA 0428 1, 2, 3,#.
M Yes 9.0 e,
11A012A-
- 38) CRD 63 NA j
IC11-F122 1, 2, 3,#
M Yes 9.0 i'
IC11-F083
- 40) RHR/LPCI A Injec. Relief 87-M 1
1E12-F025A 1, 2, 3 NA No 9.0
No 9.9 1E12-F074A I
I
~
- )
4
-, _