r, Masakatsu Inagaki June 22, 1990 Hitachi Americ,a, Ltd.

Hitachi Plaza 2000 Sierra Point Parkway, fMS640 Brisbane, CA 94005-1819

Dear Mr. Inagaki:

This is in response to your letter dated May 10, 1990, (M10666) requesting information on a NRC procedure involving design approval of BWR Control Rod and fuel Channel. You stated that you are interested in this information in conjunction with your involvement with nuclear fuel equipment for plants operated by U.S. utilities that was originally produced at your parent firm in Japan.

Design approval reviews are encompassed within the NRC's Topical Report Review Program. We suggest that you contact U.S. utilities who have BWR plants to determine their interest in such a design approval.

These companies are identified in the enclosed pages which have aeen excerpted from the NRC's

" Roster of Utilities" (Enclosure 1).

If there is sufficient interest in your BWR Control Rod and fuel Channel design, the NRC could accept a topical report for review.

Enclosed is an excerpt from NUREG-0390, Topical Report Review Status, which provides a description of the Licensing Topical Report Program (Enclosure 2).

The acceptance criteria for this type of review is addressed in the Standard Review Plan Sections 4.2, 4.5.1, 4.5.2, and 4.6 (Enclosure 3),

if a topical report is submitted for our review, the transmittal letter or report must state what plants would be incorporating the topical report on their docket. You must also state the schedule on which the design approval is needed.

We estimate that our review schedule would be from 6 months to 1 year, provided that the NRC has been notified about the proposed submittal well in advance.

Upon completion of the review, NRC will issue a Safety Evaluation j

Report.

Please contact Mr. Larry Kopp on 301 492-0879, if additional'information is l

needed.-

Sincerely, l

t

/Sl S. Singh Bajwa, Acting Chief Planning, Program, and Management l[dy Support Branch l

Office of Nuclear Reactor Regulation

[]I '

Enclosures:

lL 1.

Excerpts from the Roster of Utilities i

I (BWR licensees) d'/

2.

Excerpt from NUREG-0390

'/

l 3.

Standard Review plan Sections P ('

(

(discussed in this letter) d l

DISTRIBUTION ON NEXT PAGE.

  • See previous concurrence.

n oy@

' v 'O I 0FC

NRR:SRXB
NRR:SRXB
PffAS:NRR
AC:PMSD:NRR :

l..... :: PHAS : N RR

............ :...... l. {.4 DAME:HSmith:cr

LKo
RJones
VWilson
SBajwa H....:............:...pp

@ ATE :06/21/90*

06/21/90*
06/21/90*
06/22/90*
06/t.790 l

Ufflbi L MLLUHU LUI'T l

Document Name:

DESIGN APPROVAL hN p

l 9007020121 900622 y

PDR ORG NRRD PDC

Mr. Masakatsu Inagaki Hitachi America, Ltd.

Hitachi Plaza 2000 Sierra Point Parkway, #MS640 Brisbane, CA 94005-1819

/

Dear Mr. Inagaki:

This is'in response to your _ letter dated May 10,- 1990, (MIO666) requesting /

information onfMRC procedure involving design. approval of BWR Control Rod, r

Fuel Channel. 'You stated that you are interested.in this information in',and conjunction with your involvement with nuclear fuel equipment for plants operated by V.S. utilities that was originally produced at your parent firm in Japan.

Design approval reviews are encompassed within the NRC's Topical Report Review Program. We suggest that you contact U.S. utilities who. have'BWR plants to determine their interest in such a design approval.

Thesejompanies-are i

identified in the enclosed pages which have been excerpted from'the NRC's i

" Roster of Utilities" (Enclosure 1).

If'there is sufficient interest in your BWR Control Rod and Fuel Channel design, the NRC could' accept a topical report for review. Enclosed is an excerpt from NUREG.0390,' Topical Report Review Status, which provides a description of the Licen, sing Topical Report Program.

(Enclosure'2).

Theacceptancecriteriaforthistypeofrev,ie/

w is addressed in the Standard Review Plan Sections 4.2, 4.5.1, 4.5.2, and'4.6 (Enclosure 3). 'If a topical _.

report is submitted for our review, the transmittal letter or. report must state; what plants would be incorporating the topical report on their docket.

You must also state the schedule on whichythe design approval islneeded.

We estimate that our review schedule would be from 6! months to 1_ year, provided that the NRC has been notified about the proposed submittal well in advance. Upon completion of the-review, NRC will issue a Safety Evaluation Report.

Please contact Mr. Larry Kopp on 301492-0879,_if additional information is

/

needed.

Sincerely, S. Singh Bajwa, Acting Chief Planning, Program, and Management Support Branch Office of Nuclear Reactor Regulation

Enclosures:

1.

Excerpts from the-Roster of Utilities (BWRlicensees) 2.

Excerpt from NUREG-0390 3.

Standard Review Plan Sections (discussed in this letter)

DISTRIBUTION ON NEXT PAGE.

0

.?O

0FC
PMAS:NRR 1NRR:5 W lNRR 3
PMAS:N@-\\ :AC:PM5B:NRR :

.....:.......d,t

. '... J/... :..

L _..: _ __qrg.:........._..:_...........:.........

iNAME :HSmith:cn C :

RJ es
VWilYon
SBajwa
.....
........ \\1'.. :.... p

^DATE:06/p/90.

06/,Al /90
06/k/0
06MN90
06/ /90-c

. UttICIAL KLGUKU GUPT l

Document Name: DESIGN APPROVAL 1

i Mr. Masakatsu Inagaki June 22, 1990 DISTRIBUTION w/o enclosures):

CentraleFilest(w/ incoming)4 NRC PDR (w/ incoming)

PMSB RF PMAS RF HSmith LSapp (w/ incoming) i Wilson AThadani RJones LKopp KBurke, GPA/IP VBenaroya, GPA/IP

' l d '

l l

a 5

+

d 4

+

-,e..

~-

,.,e