ML20044A705

From kanterella
Jump to navigation Jump to search
Summary of CRGR Meeting 177 on 900110.Topics Discussed Included Continued Review of Nubarg Backfitting Appeal on Use of Nuclear Heat for Hydrostatic Testing in BWRs & Draft Rev 3 to Reg Guide 1.33 Re QA in Operating Plants
ML20044A705
Person / Time
Issue date: 06/07/1990
From: Jordan E
Committee To Review Generic Requirements
To: Taylor J
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
References
RTR-REGGD-01.033, RTR-REGGD-1.033 NUDOCS 9007020102
Download: ML20044A705 (2)


Text

_

  • ^ is

.. - a

,w

  1. %D o

UNITED STATES' E,n.

NUCLEAR REGULATORY COMMISSION

(

WASHINGTON, D. C. 205ss

,,j JUN 0 71990 o

4:

MEMORANDUM FOR:

James M. Tay1or Executive Director

.for Operations FROM:

Edward L.. Jordan, Chairman Comittee to Review Generic Requirements

SUBJECT:

MINUTES OF CRGR MEETING NUMBER 177 The Committee to Review Generic Requirements (CRGR) met on Wednesday,

/-

January 10,1990 from 1:00-3:00 p.m.

A list of attendees for this meeting is attached (Enclosure 1).

The following items were addressed'at the meeting:

1.

The Committee ;ontinued its review of the NUBARG backfitting appeal on the use of nuclear heat.for hydrostatic testing in BWR's.

The Committee had previously reviewed this matter at Meetings 172, 174 and 175 and had o

provided the EDO with a recommended response to the NUBARG appeal.

At this meeting.the Committee developed additional recommendations for the E00 in areas not explicitly addressed in the recommended response to e

NUBARG.

This matter is discussed in Enclosure 2.

l 2.

Jerry _ Wilson (RES).and Owen Gormley-(RES) presented for CRGR review a proposed draft revision 3 to Regulatory Guide 1.33 on quality assurancez

'in. operating plants.

The Committee recommended against issuance of the proposed revision.

This matter -is discussed in Enclosure 3.

,a 3.

(Due to schedule problems the Committee cancelled a planned briefing on a.

proposed rule on emergency preparedness relating to Part 52 licensing for nuclear power plants.

(The briefing was to have been preparatory'in s

nature, preceding actual review at a future meeting.)

}

In accordance with the ED0's July 18, 1983 directive concerning " Feedback and Closure of CRGR Reviews," a written response is required from the cognizant e

office to report.agraement or disagreement with the CRGR recommendations in i

these minutes.

The response, which is required within five working days after Z

. receipt of these minutes, is to be forwarded to the CRGR Chairman and if there g(1.

= is disagreement with CRGR recommendations, to the ED0 for decisionmaking.

=/

llI ll f

4 90070 0102 900607

/"

PDR NRCCRGR

/

MEx t/ro 7-PDC p@{

m' n.n nww ma C FILE CENTER COPY 4o

,o

ik;g.a:

Y2%.

,- S.-

_. 1

- JUN 0 719907

' i

  • r'

?

Questions concerning these meeting minutes should be referred--to Dennis;

-Allison-(492-4148)..

ot'e d 58 4

~

g.t aordan s

Edward L. Jordan,_- Chairman'-

Committee to Review Generic-Requirements Ei. closures:

As stated cc w/ enclosures:

Commission (5)

I

- SECY.

-J.- Lieberman P; Norry D. Williams y

Regional-Administrators CRGR Members Distribution: (w o enc.)

  • ecentrah Filer "-

"PDR'(NRC/CRGR

,.S; Treby-_-

W. Little M. Lesar-P. Kadambi-(w/ene.)-

CRGR CF=(w/ enc.-)

'CRGRESF (w/ enc.)

M.-Taylor'(w/ene.)-

L.' Shao (w/ enc.):

R.-Bosnak-(w/ enc.)

-W. Minners (w/ enc.)

B. Morris (w/ enc.)

4 T. ; Kin'g : (w/ enc. )

1.' Wilson-(w/ enc.)

C.LGormley (w/ enc.)

J. Richardson (w/ enc.)

P. Randa11'(w/ enc.)

R. Hermann (w/ enc.)'

-E.' Jordan (w/ enc.)

J.:Heltemes (w/ enc.)=

"J. Conran.(w/ enc.)

.D. Allison.(w/ enc.)-

m

+

' 0FC : AE00:CR R. :

AE :DD

C/CRGP: AE00 :
NAME
DAlliso :cg :

ltemes : ELJordan

.DATE : ldI 7/90

///90 g2f%/90 0FFICIAL RECORD COPY

s,

hkl'

.