ML20044A241

From kanterella
Jump to navigation Jump to search
Advises That W Duggan Will Replace J Hu as Chief Reactor Supervisor at Beginning of Fall 1990 Semester in Aug 1990. Fuel Elements Removed from Reactor & Placed in Storage Containers Prior to J Hu Departure
ML20044A241
Person / Time
Site: 05000199
Issue date: 06/06/1990
From: Berlin R
MANHATTAN COLLEGE, RIVERDALE, NY
To: Michaels T
Office of Nuclear Reactor Regulation
References
NUDOCS 9006280250
Download: ML20044A241 (3)


Text

- _ _ _ _ .

/

t .; g

'gg g,gn MANHATTAN coLit!E PARKWAY RIVERDALE, NEW YORK ,041 MECHANICAL ENolNEEAIN3 DEPARTMENT

-Co. .. .ege >s,,,..c,.s

'- June 6,- 1990 M-/9Y

' Theodore S. Michaels, Project Manager Standardization and Non Power Reactor Directorate Division of Reactor Projects Ill, IV, V and Special Projects Office of Nuclear Reactor Regulations I U.S. Nuclear Regulatory Commission Washington, DC 20555 SUBJ ECT: Personnel. Change in Position of Chief Reactor Supervisor at MCZPR

Dear Ted:

As indicated-in our conversation of June 4,1990, Dr. Jih Perns Hu, the Chief Reactor Supervisor,has resigned from the College and nolonger fills this position. Dr William Duggan has been hired as a full time faculty member and Chief Reactor Supervisor, starting with .

the beginning of the Fall 1990 semester in August. Dr. Duggan has a doctorate in nuclear

-engineering from Rensselcar Polytechnic Institute,has previously operated research reactors, and comes to us with extensive nuclear experience in the consulting field. His resume is attachea.

The fuct elements were removed from the reactor prior to Dr. Hu's departure, and have been

. placed in their storage containers. The reactor system is currently undergoing maintenance and will remain in lay up until Dr. Duggan is licensed as an SRO. We are attempting to schedule the SRO test for shortly af ter he joins the faculty. The delivery of the fuel elements is now tentatively scheduled for the early fall (another delay from the prior estimate). Should

!the new fuct elements arrive prior to Dr. Duggan receiving his SRO license, they will be stored unti1 his license is granted, at which time the loading of the new core will be-accomplished.

~

I will continue to update you on the status of the program.

Sincercly, lbb Dr. Robert E. Berlin Reactor Administrator Attachment cc: Dr. V. Antonetti g

\\ \

9006280250 900606 PDR ADOCK 05000199

(\

H PDC

'J 4 WILLIAM PATRICK DUGGAN

, 3 Tor View Avenue New City, New York 10956 914 639 1180 EXPERIENCE Dames & Moore -

Pearl River, New York September,1987 Present Senior Engineer, Project Manager Responsibilities: Management and technical analysis of environmental and radiological engineering projects; Project Manager and technical coordinator for LLRW- disposal facility licensing program; Manager of LLRW technical assistance contract with New York Energy Authority: Safety analysis, performance _ evaluation, and dose assessment for the West Valley Demonstration Project, Business responsibilities include identification and development of clients, and preparation of proposals, Rensselaer Polytechnic Institute Troy, New York September,1988 + Present Adjunct Assistant Professor, Department of Nuclear Engineering Responsibilities: Lecture to Radioactive Waste Management course and advise students and faculty involved in waste and environmental research, May,1984 August,1987 Research Assistant Fusion' Engineering Program Responsibilities: Design and analysis of blanket and divertor systems for fusion reactors using the novel integrated Blanket Coll concept. As a member of the design team for the TITAN project, I collaborated with UCLA, Los Alamos Lab, the Fusion Engineering Design Center, and GA Technologies.

Sept,1983 May,1984 Instructor School of Engineering (Staff Appointment)

Responsibilities: Preparation and teaching of two laboratory courses at the senior and graduate levels involving use of the sub critical reactor facility, the Tl University Board microcomputer, and various data acquisition systems, including CAMAC,

. Stone and Webster Engineering Corporation Boston, Massachusetts Feb,1982 Sept,1983-Career Development Engineer .' Nuclear Technology Division Responsibilities: Analysis and evaluation of engineered safeguard systems including containment temperature and pressure effects; determination of non accident power

' plant radiation source terms and evaluation of shielding requirements. Duties requirec significant use of computer codes.

I

w ,, .

4=

WILLIAM P. DUGGAN EDUCATION Rensselaer Polytechnic Instituto Ph. D. Nuclear Engineering and Science Master of Science Nuclear Engineering Bachelor of Science Nuclear Engineering Minor: Public Policy Studies

- Doctoral research on fusion reactor design, including thermal hydraulle. _

electromagnetic, mechanical, and nuclear parameters. Master's thesis on thermal hydraulle performance of a spent fuel shipping cask. Course work included fluids, thermodynamics, heat transfer, and power plant systems.

PUBLICATIONS

" Applications of the Integrated Blanket Coll Concept to the Compact Reversed Field Pinch Reactor" Presented at the Seventh Topical Meeting on the Technology of Fusion ,

Energy . June,1986

" Applications of the IBC Concept to the RFP Fusion Reactor" Pr(sented at the 1986 ANS Eastern Regional Student Conference, April, 1986 i

PROFESSIONAL and CIVlO Engineer in Training, Lomi. ,nwealth of Massachusetts Member, American Nuclear Jociety l

' Member, Health Physics S sciety Member, Sigma Xi ,'

Director, Rensselaer Alumra Association l-  !

I j

I

/,

j l

f e i I

l l

i 1