ML20044A197
From kanterella
Jump to navigation
Jump to search
ML20044A197 | |
Person / Time | |
---|---|
Site: | Farley |
Issue date: | 06/25/1990 |
From: | Hoffman S Office of Nuclear Reactor Regulation |
To: | Office of Nuclear Reactor Regulation |
References | |
NUDOCS 9006280194 | |
Download: ML20044A197 (20) | |
Similar Documents at Farley | |
---|---|
Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20206L4921999-05-10010 May 1999
[Table view]Summary of 990416 Meeting with Util in Rockville MD to Discuss Matter Re SG Operational Assessments for Current Operating Cycle at Plant,Unit 1 ML20206G1181999-05-0505 May 1999 Summary of 990419-20 Meeting with Southern Nuclear Operating Co,Inc in Rockville,Md Re Matters Related to Implementation of Improved Standard TSs at Farley Nuclear Plant,Units 1 & 2 ML20198S2581998-12-31031 December 1998 Summary of 981215 Meeting with Southern Nuclear Operating Co in Rockville,Md to Discuss Technical Issues Associated with Kaowool Fire Barriers Installed at Farley Nuclear Plant, Units 1 & 2 ML20198M7031998-12-29029 December 1998 Summary of 981215 Meeting with Southern Nuclear Operating Co,Inc in Rockville,Md Re Matters Related to Current Steam Generator Tube Insp at Farley Nuclear Plant,Unit 1.List of Attendees & Meeting Handouts,Encl ML20195J1361998-11-17017 November 1998 Summary of 981026 Meeting with Util in Rockville,Md to Discuss Plant Analysis of Replacement SG & Evaluation of Other Small Changes for FNP Units 1 & 2 Best Etimate Large Break loss-of-coolant Accident ML20155C2451998-10-29029 October 1998 Summary of 981008 Meeting with Southern Nuclear Operating Co in Rockville,Md Re Util Repair of Joseph M Farley Nuclear Plant,Unit 1 B SG Tubes & Eddy Current Test Data for Tube R25C51 Submitted by .List of Attendees Encl ML20155C4141998-10-29029 October 1998 Summary of 981014 Meeting W/Southern Nuclear Operating Co, Inc in Rockville,Md Re Justification of Certain TS Changes Needed to Implement Improved Std TS & NRC Staff Request for Addl Info, .List of Attendees Encl ML20203C5501997-12-0505 December 1997 Summary of 971120 Meeting W/Southern Nuclear Operating Co to Discuss Matters Related to Steam Generator Replacement Projects Proposed for Both Farley Nuclear Units.List of Attendees Enclosed ML20199A0161997-10-30030 October 1997 Summary of 971022 Meeting W/Util in Rockville,Md Re Initiatives That Focus on Planned Licensing Actions & Corrective Measures Re Problems Considered by Mgt to Warrant Special Attention ML20217E1531997-09-25025 September 1997 Summary of 970916 Meeting W/Southern Nuclear Operating Co, Inc in Rockville,Maryland Re Licensees Improved Std TS Conversion Application & Schedule for Submittal.List of Meeting Attendees & Meeting Handouts Encl ML20217L8701997-08-14014 August 1997 Summary of 970731 Meeting W/Southern Nuclear Operating Co, Inc in Birmingham,Al Re Plant Status,Major Problems & Other Topics at Farley,Hatch & Vogtle Nuclear Plants.List of Attendees & Presentation Handouts Encl ML20134K7521997-02-12012 February 1997 Summary of 970205 Meeting W/Util & W for Initial Discussion of Utils Plans & Schedule for Submitting Proposed TS Amend Request Re Use of Direct Tube Repair in Repair of SG Tubes. List of Participants & Matl Presented Encl ML20029D9001994-05-0909 May 1994 Summary of 940426 Meeting W/Util & W in Rockville,Md Re TMI Issue II.d.1, Performance Testing of BWR & PWR Relief & Safety Valves. Attendees List & Handout Encl ML20056C5231993-06-18018 June 1993 Summary of 930602 Meeting W/Util Re Plant Proposal for Removing 2C Emergency Diesel Generator from TS as Part of Farley Implementation of Station Blackout Rule.List of Attendees Encl ML20056D6661993-06-0101 June 1993 Summary of Operating Reactors Events Briefing 93-19 on 930526 ML20128C1261992-11-25025 November 1992 Summary of 921026 Meeting W/Util in Houston County,Al Re Future Submittals Planned by Util,Status of NRC Review of Previous Submittals,Responses to Generic Communications,Nrc Concerns & General Coordination of Licensing Activities ML20128A0111992-11-25025 November 1992 Summary of 920727 Meeting W/Util,Westinghouse & Pnl in Rockville,Md Re Discussions on Steam Line Break Leakage Issues Relating to Licensees SG Tube Alternate Plugging Criteria Proposal.List of Attendees Encl ML20058K1841990-12-0404 December 1990 Summary of 901107 Meeting W/Util in Rockville,Md Re Steam Generator Tube Collapse Under Combined LOCA & Safe Shutdown Earthquake Loads ML20044A1971990-06-25025 June 1990 Summary of 900607 Meeting W/Util & Westinghouse in Rockville,Md Re Planned Amends Covering Steam Generator Tube Sleeving in Tube Support Plate Area,Increase in Steam Generator Tube Plugging Limit & RTD Bypass Removal ML20247R0161989-09-21021 September 1989 Summary of Operating Reactors Events Meeting 89-34 on 890920 to Brief Senior Managers & Regional Offices on Selected Events That Occured Since Last Meeting ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20150B2131988-07-0505 July 1988 Summary of 880601 Meeting W/Util in Rockville,Md Re Antitrust 2.206 Petition.Attendance List Encl ML20153B0061988-06-17017 June 1988 Summary of CRGR Meeting 137 on 880608 Re Proposed Draft Rule 10CFR52 Concerning Site Permits,Design Certifications & Combined Licenses & Proposed NRC Bulletin Regarding Thermal Stresses in Piping.List of Attendees Encl ML20153B0011988-06-17017 June 1988 Summary of CRGR Meeting 137 on 880608 Re Proposed Draft Rule 10CFR52 Concerning Site Permits,Design Certifications & Combined Licenses & Proposed NRC Bulletin Regarding Thermal Stresses in Piping.List of Attendees Encl.W/O Stated Encl ML20151C9691988-04-0808 April 1988 Summary of 880406 Meeting W/Util & Alabama Electric Power Cooperative in Rockville,Md Re Status of Settlement Proposal Presented to NRC in Jan 1988,per 2.206 Antitrust Proceeding. List of Attendees Encl ML20148L1801988-03-25025 March 1988 Summary of 880318 Meeting W/Utils in Rockville,Md Re Info That Would Be Required in Submittal of Amends to Licenses & CP Held by Utils.Attendees List & Viewgraphs Encl ML20196J7851988-03-10010 March 1988 Summary of Operating Reactors Events Meeting 88-10 on 880308.List of Attendees & Significant Elements of Events Discussed Encl ML20150C7261988-03-0909 March 1988 Summary of 880302 Meeting W/Utils in Rockville,Md Re Formation of Separate Operating Organization.List of Attendees & Viewgraphs Encl ML20149M1771988-02-0808 February 1988 Summary of 880115 Meeting W/Util Discussing Generic Implications of Cracked 6-inch Safety Injection Pipe at Plant.Meeting Attendees & Agenda Encl ML20196B1461988-01-11011 January 1988 Summary of CRGR Meeting 127 on 871223 Re Proposed Resolution of USI A-47, Safety Implications of Control Sys in LWR Nucl Nuclear Power Plants. Committee Recommended Forwarding Ofc Package to EDO Following Incorporation of CRGR Comments ML20149F4741988-01-0707 January 1988 Summary of Operating Reactors Events Meeting 88-01 on 870105 Re Events That Occurred Since 871222.List of Attendees & Viewgraphs Encl ML20237F2471987-12-18018 December 1987 Summary of Operating Reactor Events Meeting 87-44 on 871215. List of Attendees,Events Discussed,Significant Elements of Events & Summary of Reactor Scrams Encl ML20236L3201987-11-0505 November 1987 Summary of 870924 Meeting W/Util,Bechtel & Rl Cloug Assoc Re Problems Concerning Qualification of V-Type Electrical Splices at Facility.Attendance List Encl ML20236P2841987-11-0505 November 1987 Summary of Operating Reactors Events Meeting 87-38 on 871103.List of Attendees,Viewgraphs & Summary of Reactor Scrams Encl ML20235W9431987-10-13013 October 1987 Summary of Operating Reactors Events Meeting 87-32 on 870922.Notes That Meeting 87-31 Did Not Occur.List of Attendees & Events Discussed & Significant Elements of Events Encl ML20216J4431987-06-26026 June 1987 Summary of 870619 Meeting W/Util & Southern Co Svcs to Discuss Commission Policy Statement for Tech Spec Improvements on Plant Specific Basis.List of Attendees & Pilot Application of Commission Interim Policy... Encl ML20214S9971987-06-0202 June 1987 Summary of 870505 Meeting W/Util Re Planned Safeguards Mods at Facility ML20236S4401986-12-30030 December 1986 Summary of 861120 Meeting W/Util Re Proposed Tech Spec Changes to Snubber Surveillance Insp Intervals ML20212E3601986-12-23023 December 1986 Summary of 861120 Meeting W/Bechtel,Southern Co,Svcs & Alabama Power Co in Bethesda,Md Re Proposed Tech Spec Changes to Snubber Surveillance Insp Intervals.Meeting Agenda,List of Attendees & Viewgraphs Encl ML20147E8911986-08-20020 August 1986 Trip Rept of 860721-25 Visit to Plant to Observe INPO Accreditation Team Evaluation of Six Training Programs, Including Instrumentation & Control Technician,Mechanical Maint & Electrical Maint.List of Team Members Encl ML20206L9081986-08-11011 August 1986 Summary of Operating Reactor Events Meeting 86-27 on 860804 W/Ofc Director,Div Directors & Representatives Re Briefing on Events Which Occurred Since Last Meeting on 860728.List of Attendees & Viewgraphs Encl ML20211P1361986-07-16016 July 1986 Summary of 860707 Operating Reactor Events Meeting 86-23 W/ Div Directors & Representatives Re Events Since Last Meeting on 860630.Notification of Inability to Meet Assigned Target Completion Dates for Actions Requested.Viewgraphs Encl ML20211G7781986-06-13013 June 1986 Summary of Operating Reactor Events Meeting 86-19 on 860609. List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20154P0071986-03-12012 March 1986 Summary of Operating Reactor Events 860303 Meeting 86-06 W/Ornl Re Events Occurring Since 860224 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20154C9931986-02-24024 February 1986 Summary of Operating Reactors Event Meeting 86-04 on 860210.List of Attendees,Briefing & Reactor Scram Summaries Encl ML20132C3761984-08-0808 August 1984 Trip Rept of 840618-20 Site Visit to Observe INPO Accreditation Team to Determine Adequacy of Process as Means of Implementing Sys Approach to Training in Commercial Nuclear Power Industry ML20033C2231981-11-0909 November 1981 Summary of 811029 Meeting W/Util in Bethesda,Md Re Util Presentation of Diesel Generator Reliability Improvements Program.Agenda Encl ML20031F1401981-10-0101 October 1981 Summary of 810918 Meeting W/Westinghouse Owners Group Re Pressurized Thermal Shock to Reactor Pressure Vessels. Attendance List & Handouts Encl ML20010B7411981-08-10010 August 1981 Summary of 810803 Meeting W/Util in Bethesda,Md Re NRC Concerns Relating to Diesel Generator 1C Failures.Failures Possibly Related to Reg Guide 1.108 Testing.Relevant Tech Specs & Attendance Lists Encl 1999-05-05 Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT) MONTHYEARML20206L4921999-05-10010 May 1999
[Table view]Summary of 990416 Meeting with Util in Rockville MD to Discuss Matter Re SG Operational Assessments for Current Operating Cycle at Plant,Unit 1 ML20206G1181999-05-0505 May 1999 Summary of 990419-20 Meeting with Southern Nuclear Operating Co,Inc in Rockville,Md Re Matters Related to Implementation of Improved Standard TSs at Farley Nuclear Plant,Units 1 & 2 ML20198S2581998-12-31031 December 1998 Summary of 981215 Meeting with Southern Nuclear Operating Co in Rockville,Md to Discuss Technical Issues Associated with Kaowool Fire Barriers Installed at Farley Nuclear Plant, Units 1 & 2 ML20198M7031998-12-29029 December 1998 Summary of 981215 Meeting with Southern Nuclear Operating Co,Inc in Rockville,Md Re Matters Related to Current Steam Generator Tube Insp at Farley Nuclear Plant,Unit 1.List of Attendees & Meeting Handouts,Encl ML20195J1361998-11-17017 November 1998 Summary of 981026 Meeting with Util in Rockville,Md to Discuss Plant Analysis of Replacement SG & Evaluation of Other Small Changes for FNP Units 1 & 2 Best Etimate Large Break loss-of-coolant Accident ML20155C2451998-10-29029 October 1998 Summary of 981008 Meeting with Southern Nuclear Operating Co in Rockville,Md Re Util Repair of Joseph M Farley Nuclear Plant,Unit 1 B SG Tubes & Eddy Current Test Data for Tube R25C51 Submitted by .List of Attendees Encl ML20155C4141998-10-29029 October 1998 Summary of 981014 Meeting W/Southern Nuclear Operating Co, Inc in Rockville,Md Re Justification of Certain TS Changes Needed to Implement Improved Std TS & NRC Staff Request for Addl Info, .List of Attendees Encl ML20203C5501997-12-0505 December 1997 Summary of 971120 Meeting W/Southern Nuclear Operating Co to Discuss Matters Related to Steam Generator Replacement Projects Proposed for Both Farley Nuclear Units.List of Attendees Enclosed ML20199A0161997-10-30030 October 1997 Summary of 971022 Meeting W/Util in Rockville,Md Re Initiatives That Focus on Planned Licensing Actions & Corrective Measures Re Problems Considered by Mgt to Warrant Special Attention ML20217E1531997-09-25025 September 1997 Summary of 970916 Meeting W/Southern Nuclear Operating Co, Inc in Rockville,Maryland Re Licensees Improved Std TS Conversion Application & Schedule for Submittal.List of Meeting Attendees & Meeting Handouts Encl ML20217L8701997-08-14014 August 1997 Summary of 970731 Meeting W/Southern Nuclear Operating Co, Inc in Birmingham,Al Re Plant Status,Major Problems & Other Topics at Farley,Hatch & Vogtle Nuclear Plants.List of Attendees & Presentation Handouts Encl ML20134K7521997-02-12012 February 1997 Summary of 970205 Meeting W/Util & W for Initial Discussion of Utils Plans & Schedule for Submitting Proposed TS Amend Request Re Use of Direct Tube Repair in Repair of SG Tubes. List of Participants & Matl Presented Encl ML20029D9001994-05-0909 May 1994 Summary of 940426 Meeting W/Util & W in Rockville,Md Re TMI Issue II.d.1, Performance Testing of BWR & PWR Relief & Safety Valves. Attendees List & Handout Encl ML20056C5231993-06-18018 June 1993 Summary of 930602 Meeting W/Util Re Plant Proposal for Removing 2C Emergency Diesel Generator from TS as Part of Farley Implementation of Station Blackout Rule.List of Attendees Encl ML20056D6661993-06-0101 June 1993 Summary of Operating Reactors Events Briefing 93-19 on 930526 ML20128A0111992-11-25025 November 1992 Summary of 920727 Meeting W/Util,Westinghouse & Pnl in Rockville,Md Re Discussions on Steam Line Break Leakage Issues Relating to Licensees SG Tube Alternate Plugging Criteria Proposal.List of Attendees Encl ML20128C1261992-11-25025 November 1992 Summary of 921026 Meeting W/Util in Houston County,Al Re Future Submittals Planned by Util,Status of NRC Review of Previous Submittals,Responses to Generic Communications,Nrc Concerns & General Coordination of Licensing Activities ML20058K1841990-12-0404 December 1990 Summary of 901107 Meeting W/Util in Rockville,Md Re Steam Generator Tube Collapse Under Combined LOCA & Safe Shutdown Earthquake Loads ML20044A1971990-06-25025 June 1990 Summary of 900607 Meeting W/Util & Westinghouse in Rockville,Md Re Planned Amends Covering Steam Generator Tube Sleeving in Tube Support Plate Area,Increase in Steam Generator Tube Plugging Limit & RTD Bypass Removal ML20247R0161989-09-21021 September 1989 Summary of Operating Reactors Events Meeting 89-34 on 890920 to Brief Senior Managers & Regional Offices on Selected Events That Occured Since Last Meeting ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20150B2131988-07-0505 July 1988 Summary of 880601 Meeting W/Util in Rockville,Md Re Antitrust 2.206 Petition.Attendance List Encl ML20153B0061988-06-17017 June 1988 Summary of CRGR Meeting 137 on 880608 Re Proposed Draft Rule 10CFR52 Concerning Site Permits,Design Certifications & Combined Licenses & Proposed NRC Bulletin Regarding Thermal Stresses in Piping.List of Attendees Encl ML20153B0011988-06-17017 June 1988 Summary of CRGR Meeting 137 on 880608 Re Proposed Draft Rule 10CFR52 Concerning Site Permits,Design Certifications & Combined Licenses & Proposed NRC Bulletin Regarding Thermal Stresses in Piping.List of Attendees Encl.W/O Stated Encl ML20151C9691988-04-0808 April 1988 Summary of 880406 Meeting W/Util & Alabama Electric Power Cooperative in Rockville,Md Re Status of Settlement Proposal Presented to NRC in Jan 1988,per 2.206 Antitrust Proceeding. List of Attendees Encl ML20148L1801988-03-25025 March 1988 Summary of 880318 Meeting W/Utils in Rockville,Md Re Info That Would Be Required in Submittal of Amends to Licenses & CP Held by Utils.Attendees List & Viewgraphs Encl ML20196J7851988-03-10010 March 1988 Summary of Operating Reactors Events Meeting 88-10 on 880308.List of Attendees & Significant Elements of Events Discussed Encl ML20150C7261988-03-0909 March 1988 Summary of 880302 Meeting W/Utils in Rockville,Md Re Formation of Separate Operating Organization.List of Attendees & Viewgraphs Encl ML20149M1771988-02-0808 February 1988 Summary of 880115 Meeting W/Util Discussing Generic Implications of Cracked 6-inch Safety Injection Pipe at Plant.Meeting Attendees & Agenda Encl ML20196B1461988-01-11011 January 1988 Summary of CRGR Meeting 127 on 871223 Re Proposed Resolution of USI A-47, Safety Implications of Control Sys in LWR Nucl Nuclear Power Plants. Committee Recommended Forwarding Ofc Package to EDO Following Incorporation of CRGR Comments ML20149F4741988-01-0707 January 1988 Summary of Operating Reactors Events Meeting 88-01 on 870105 Re Events That Occurred Since 871222.List of Attendees & Viewgraphs Encl ML20237F2471987-12-18018 December 1987 Summary of Operating Reactor Events Meeting 87-44 on 871215. List of Attendees,Events Discussed,Significant Elements of Events & Summary of Reactor Scrams Encl ML20236P2841987-11-0505 November 1987 Summary of Operating Reactors Events Meeting 87-38 on 871103.List of Attendees,Viewgraphs & Summary of Reactor Scrams Encl ML20236L3201987-11-0505 November 1987 Summary of 870924 Meeting W/Util,Bechtel & Rl Cloug Assoc Re Problems Concerning Qualification of V-Type Electrical Splices at Facility.Attendance List Encl ML20235W9431987-10-13013 October 1987 Summary of Operating Reactors Events Meeting 87-32 on 870922.Notes That Meeting 87-31 Did Not Occur.List of Attendees & Events Discussed & Significant Elements of Events Encl ML20216J4431987-06-26026 June 1987 Summary of 870619 Meeting W/Util & Southern Co Svcs to Discuss Commission Policy Statement for Tech Spec Improvements on Plant Specific Basis.List of Attendees & Pilot Application of Commission Interim Policy... Encl ML20214S9971987-06-0202 June 1987 Summary of 870505 Meeting W/Util Re Planned Safeguards Mods at Facility ML20236S4401986-12-30030 December 1986 Summary of 861120 Meeting W/Util Re Proposed Tech Spec Changes to Snubber Surveillance Insp Intervals ML20212E3601986-12-23023 December 1986 Summary of 861120 Meeting W/Bechtel,Southern Co,Svcs & Alabama Power Co in Bethesda,Md Re Proposed Tech Spec Changes to Snubber Surveillance Insp Intervals.Meeting Agenda,List of Attendees & Viewgraphs Encl ML20206L9081986-08-11011 August 1986 Summary of Operating Reactor Events Meeting 86-27 on 860804 W/Ofc Director,Div Directors & Representatives Re Briefing on Events Which Occurred Since Last Meeting on 860728.List of Attendees & Viewgraphs Encl ML20211P1361986-07-16016 July 1986 Summary of 860707 Operating Reactor Events Meeting 86-23 W/ Div Directors & Representatives Re Events Since Last Meeting on 860630.Notification of Inability to Meet Assigned Target Completion Dates for Actions Requested.Viewgraphs Encl ML20211G7781986-06-13013 June 1986 Summary of Operating Reactor Events Meeting 86-19 on 860609. List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20154P0071986-03-12012 March 1986 Summary of Operating Reactor Events 860303 Meeting 86-06 W/Ornl Re Events Occurring Since 860224 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20154C9931986-02-24024 February 1986 Summary of Operating Reactors Event Meeting 86-04 on 860210.List of Attendees,Briefing & Reactor Scram Summaries Encl ML20033C2231981-11-0909 November 1981 Summary of 811029 Meeting W/Util in Bethesda,Md Re Util Presentation of Diesel Generator Reliability Improvements Program.Agenda Encl ML20031F1401981-10-0101 October 1981 Summary of 810918 Meeting W/Westinghouse Owners Group Re Pressurized Thermal Shock to Reactor Pressure Vessels. Attendance List & Handouts Encl ML20010B7411981-08-10010 August 1981 Summary of 810803 Meeting W/Util in Bethesda,Md Re NRC Concerns Relating to Diesel Generator 1C Failures.Failures Possibly Related to Reg Guide 1.108 Testing.Relevant Tech Specs & Attendance Lists Encl ML20126L2331981-05-0101 May 1981 Summary of 810429 Meeting W/Pwr Owners Group Re Thermal Shock to Reactor Pressure Vessels.All Parties Agree That Thermal Shock W/Subsequent Repressurization Is Safety Concern Needing Prompt Evaluation ML20003D9551981-03-17017 March 1981 Summary of 810204 Meeting W/Util Re Facility Startup Schedule 1999-05-05 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20044A197&oldid=4534166"