__

._,j.._,

h#

'of _

UNITED STATES NUCLEAR REGULATORY COMMISSION ADVISORY COMMITTEE ON REACTOR SAFEGUARDS o

WASHINGTON, D, C. 20666 g

November 6, 1989 MEMORANDUM FOR: James M. Taylor Acting Executive Director for Operations I

l ATTN:

J. B1 a

FROM:

R.

Fra ey, xec ive Director, ACRS

SUBJECT:

354TH ACRS MEETING FOLLOW-UP ITEMS Based on - discussions regarding methods for improved implementation and follow-up of ACRS recommendations, _ the Committee agreed that a sunnary of Actions,. Agreements. Assignments, and Requests made during each full Connittee meeting will be sent to your office following each meeting.

' Attached wr this' agmement is a list of the requests made at the 354th ACRS Meeting,' October-5-6, 1989.-

Those items in the list " Actions,- Agreements Assignments, and Requests" dated November 2,'1989 that do not deal with requests made of the NRC Staff or that am not pertinent to NRC Staff activities have not been included in-this follow-up list.

Attachment:

[

As stated cc-w/att:

E. L.' Jordan, AEOD R. M. Bernero,'NMSS T. E. Murley, NRR E. S. Beckjord, RES S. Chilk, SECY A. Vietti-Cook, OCM/KC C. Ader, OCM/TR-G. Marcus, OCM/KR i

D, Trimble, OCM/JC i e

_ G;. A3D ORIGINAL GENERAL PDC i

Certified By i

,---a

... ;,, J Revised:

November 6, 1989 ACTIONS, AGREEMENTS, ASSIGNMENTS, AND REQUESTS 354TH ACRS MEETING, OCTOBER 5 AND 6, 1989 REPORTS, LETTERS, AND MEMORANDUM i

1.

Proposed Revised Policy Statement on tho Maintenance of Nuclear Power Plants (Report to Chainnan Carr, dated October 12, 1989)

I 2.

ACRS Comments on the Safety Goal Policy and Its Relationship to the concept of Adequate Protection (Report to Chainnan Carr, dated October TI,1989) 3.

Proposed Resolution of Generic Issue 135, " Steam Generator and Steam Line Overf111 Issues" (Letter to James M. Taylor, Acting Executive Director for Operations, dated October 11,1989)

OTHER ACTIONS, AGREEMENTS, ASSIGNMENTS, AND REQUESTS 4..

Future Agenda Items a. -- The Committee did not complete its discussion of'the NRC staff's proposed resolution of Generic Issue 8-56, " Diesel Generator Reliability " and agreed to schedule time for' additional discussion at the November 16-18, 1989 ACRS meeting. The Comittee asked that

- written statements be provided of the positions of the.NRC staff and NUMARC regarding this matter.

(Mr.-El-Zeftawyhasthefollow-up.

q actiononthismatter.)

~b.

. The Comittee did not complete its discussion of-the NRC staff's proposed resolution of Generic Issue 87, " Failure of HPCI Steam Line Without Isolation," and agreed to schedule time for additional.

discussion during the November 16-18, 1989 ACRS meeting.

(Mr.. Igne has the follow-up action on this matter.)

c.

The Comittee was briefed by E. Beckjord. RES, regarding the: impact of the budget reductions imposed by the Congress on the NRC Safety 4

Research Program. The Comittee discussed the budget reductions a

that had been imposed on the NRC over recent years and the manner in which these reductions had been distributed among the various NRC programs. The Committee proposed that this matter be discussed with the Comissioners during a future meeting.

(Mr. Duraiswamy has'the follow-up action on this matter.)

3 Dr. Siess requested that copies of all the correspondence between the Nuclear Safety Research Review Committee and RES be provided to the ACRS. Dr. Beckjord agreed to do so.

(Note: Copies were t

obtained from RES and sent to all members by Mr. Duraiswamy on October 12,1999.)

i

=

a p ww(. ;

e f8 354th ACRS Meeting s L

5.

The Comittee agreed that it did not need a briefing on the NRC staff's recent actions on the proposed rule on hot particles during the November.

meeting prior to a planned staff briefing of the Commissioners scheduled

- for late November 1989. Mr. Carroll Chaiman of the Occupational and Environmental Protection Systems subcommittee.'will review the staff's e

proposed resolution package when it is available and take the appropriate action.

(Mr. Igne has the follow-up action on this matter.)

6.

The Comittee decided not to review the proposed restart of the Calvert i

Cliffs plant.

7.

The first of the future applications for license extensions is expected to be for the Yankee Rowe plant. NRC staff review activities on this plant are also expected to be carried out in parallel with the develop-ment of the staff's generic guidance / requirements for licensees seeking -

license extensions. The Constittee agreed to review the Yankee Rowe application for a license extension as a se)arate item. -[ Note: This review is the responsibility of the ACRS su) committee on Westinghouse and Combustion Engineering Reactor plants.] (Mr. El-Zeftawy has the follow-up action on this matter.)

FUTURE ACTIVITIES-The Committee agreed to a tentative schedule for the November 16-18. 1989 ACRS E.,.

Meeting as shown in Appendix A..

I L

I l '

L l

a

h

.ax.,.

.~

J APPENDIX A TENTATIVE SCHEDU1.E FOR THE 355TH ACRS MEETING, NOVEMBER 16-18, 1989 Accident Management - Review and coment regarding proposed accident f

management strategies for consideration in Individual Plant Examinations.

Advanced Pressurized Water Reactors - Briefing by NRC staff members i

mgarding the status of review of the proposed standardized advanced pressurized water reactors.

TMI-2 Accident Evaluation - Briefing regarding status of the TMI-2 post-accident evaluation effort.

J Nine Mile Point Unit 1 - Review and report on proposed restart of this BWR plant. Representatives of the NRC staff and licensee will participate as appropriate.

GE Advanced Boiling Water Reactors - Review and comment on Module I of l

this standardized advanced-BWR design.

Nuclear Power Plant Access Authorization - Review and comment on proposed final rule regarding access authorization to controlled areas of nuclear power plants.

Integration of the-Regulatory Process (Omn) - Discuss proposed' ACRS n

report on proposed integration of the NR; regulatory process.

L Generic Issue B-56. Diesel Reliability and Proposed Regulatory Guide 1.9. Revision 3 - Discuss proposed ACR5 re proposed resolution of this generic-issue. port regarding MRG staff's L

Generic Issue 87. Failure of HPCI Steam Line Without Isolation - Discuss proposed AGR5 report regarding NRC staff's proposed resolution of this ;

L generic issue.

I l

u,