Forwards List of Requests Made at ACRS 353rd Meeting on 890907-09,per Agreement Based on Discussions Re Methods for Improved Implementation & Followup of ACRS Recommendations
ML20043J029
Person / Time
Issue date: 10/04/1989
From: Fraley R
Advisory Committee on Reactor Safeguards
To: Blaha J, Taylor J
NRC, NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
References
ACRS-GENERAL, NUDOCS 9006270214
Download: ML20043J029 (4)


Text

_

,,ri

=

ppe

. /,..,'q,

' UNITED STATES

'8 NUCLEAR REGULATORY COMMISSION.

o

.d cl-wAsHmoTow, o. c. rosu -

ADVISORY COMMITTEE ON REACTOR SAFEGUARD 8 i

=

October 4,1989 i

MEMORANDUM FOR: James M. Taylor, Acting Executive Director for Operations e

ATTN:

James L. Blah 9

. MA FROM:

Ra

. Frale'y, Exocutive Director, ACRS

SUBJECT:

353RD ACRS MEETING FOLLOW-UP ITEMS Based on discussions regarding methods for improved implementation and follow-up of ACRS recommendations, the' Committee agreed that a summary of Actions, Agreements. Assignments, and Requests made during each full Commit-tee meeting will be sent to.your office following each meeting.

Attached per this agreement is a list of the requests made at the 353rd ACRS-Meeting, September 7-9, 1989.

Those: items in the list " Actions, Agreements, Assignments, and Requests" dated September 25, 1989 that do not deal with requests made of the NRC Staff L

or that are not pertinent to.NRC staff activities have not been included-in this follow-up list.

Attachment:

JAs stated

?

g cc:

E. L.. Jordan, AE0D

R. M. Bernero. HMSS

~T. E. Murley, NRR E. S. Beckjord, RES S. J. Chilk, SECY A. L. Vietti-Cook, OCM/XC C. E. Ader. OCM/TR G. H. Marcus, OCM/XR D. C. Trimble, Jr., OCM/JC 331cgATED ORIGINAL l

Certified M k

9006270214 891004 l

PDR -ACRS g

l

= GENERAL PDC

\\.

l Revised: Oct. 4',1989 1

E*

O d

ACTIONS ~, AGREEMENTS, ASSIGNMENTS, AND REQUESTS 353RD ACRS MEETING, SEPTEMBER 7-9, 1989 e

REPORTS'AND LETTERS 1.

Emergency Plan for Full-Power Operation of the Seabrook Station, Unit 1 (Report to Chairman Carr dated September 13,1989) 2.

Electric Power Research Institute Advanced Light Water Reactor Require -

l ments Document (Report to Chairman Carr dated September 12, 1989) 3..

Proposed Resolut. ion of Generic Issue A-29

" Nuclear Power Plant Design-I for Reduction of Vulnerability to Industrial Sabotage" (Report to l

Chairman Carr dated September 12, 1989) 1 OTHER ACTIONS, AGREEMENTS, ASSIGNMENTS, AND REQUESTS s

-4.

. Future Agenda Items The Committee decided to review the proposed Regulatory Guide, Task No. DG-1001, " Maintenance Programs for Nuclear Power Plants," after-the public comment period.

(Mr. Alderman has the follow-up action 4

on this natter.)

The Committee decided to review the proposed resolution of Generic Issue 135, " Steam Generator and Steam Line-Overfill Issues," during the October 5-7, 1989 - ACRS meeting.

(Mr. Igne has the follow-up actiononthismatter.)

5.

The Committee decided not to review' the proposed amendments to -10 CFR

-i Part 34:

"ASNT Certification of Industrial Radiographers." (See SECY-89-194) 6.

The: Committee will meet with Dr. Beckjord, Director of RES, 'during the October 5-7, 1989 meeting to discuss items of-mutual interest.

Mr.

Duraiswamy is the coordinator for this activity.. The. topics identified by the Committee for discussion with Dr. Beckjord include the following:.

Impact of the FY 1990 budget reduction proposed by the Congress-on-the NRC Safety Resear:ch Program.

Nuclear Safety Research Review Connittee's views on the proposed budget reduction.

Progress being made in obtaining greater diversity of research providers.

t i

.e me3.

-1 353RD - ACTIONS' '

_ Status of, and progress being made-in, bringing outside expertise on board.as recomended by the National Research Council.

Contribution, so far, to the NRC Safety,Research from the implemen-tation of the recommendations of the National Research Council.

o 7.-

Dr. Siess briefed the Comittee on the status of the Extreme External Phenomena-Subcomittee's review of. the approach.being proposed by the i

NRC staff for consideration of external events in the IPE.

The Subcom-mittee will continue its review of this matter as soon as related documents, describing-the NRC staff's approach, are made available' 'It is expected that this matter will -be brought before the ACRS full Comittee - for action by Januar 1990.

'(Mr. Igne has the follow-up action on this matter.)y-February 8.-

Mr. Michelson noted that the EPRI generic position on a containment vent (e.g... venting is not included) and the position taken by General Electric (e.g.=, venting is provided for the ABWR) are different.

Mr.

Michelson stated.that he would explore the basis for the differences in the Subcomittee's review of the Advanced BWR.

(Mr. Alderman has the-L follow-up action on this matter.)

o 9.

Four ' plants (0yster Creek, Dresden 2, San Onofre 1, and - Pelisades)

E remain to be converted from POLS to FOLs.

The Comittee agreed to review these license conversions.

The former SEP Subcomittee will be reconstituted to handle these reviews with.Dr. Siess as the Chairman.

(Mr. Duraiswa y is the cognizant staff engineer for these reviews.)

10. During ACRS review of the. Sequoyah Plant restart, TVA conunitted to review incident reports-of sister ~' plants. and make use of applicable operating experience. ~ Mr. Carroll noted that TVA has recently indicated that. it plans. to make use of INP0' evaluations of ' operating experience rather than doing the evaluations themselves as previously agreed upon.

The-Comittee agreed to schedule 1 discussions with the NRC staff' to discuss the staf f's basis for allowing TVA to change its comitment and to discuss what the usual industry practice:.was -in regard to using operating - experience from other plants. - Mr. Michelson called. the l

Cwmittee.'s attention to the work which AE0D has p(erformed in evaluating

-industry use of generic operating experience.

Mr. Alderman and Mr.

L Houstonhasthefollow-upactiononthismatter.)

FUTURE ACTIVITIES 1

L.

The Comittee agreed to the fo14 wing tentative schedule for the October 5-7, 1989 ACRS meeting.

Maintenance of Nuclear Power-Plants - Complete review and report on proposed NRC Policy Statement on maintenance programs for nuclear power plants.

i' I

v

7 e

353RD - ACTIONS >

Definition of " Adequate Protection' - Discuss and report on proposed ACRS-NRC staff, positions regarding the definition of adequate protection related to implementation of the NRC safety goals.

Generic Issue 135. " Steam Generator and Steam Line Overfill Issues" - Review and report on proposed NRC staff resolution of this gene ic 1ssue.

Generic-Issue B-56 " Diesel Reliability" - Review and report on_ proposed NRC.-

start resolut1ti of this generic issue.

Generic Issue 87, " Failure of HPCI Steam Line Without Isolation" - Review and report on proposed resolution of this generic issue and the performance of other ' valves in nuclear power plants.

Standardized Nuclear Plants CANDU Briefing regarding proposed design of the CANDU-3 reactors.

Meeting with NRC Director of Research - Discuss items of mutual interest, including status of action. of the NA5 report on revitalizing the research

. program, impact of budget reductions on the NRC program, and diversity of-

-views and contractors in the research effort.

E_