June 21,1990 W
+
3 s
L Dbcket No. 50 27-Mr. W -E. Wilson Associate Director Nuclear Radiation Center-Washington State University-
-Pullman, Washington 99164 1300
.j o
[
Dear Mr. Wilson:
1
SUBJECT:
REQUEST'FOR ADDITIONAL INFORMATION-3.
.We are continuing our review of the. documentation submitted in support of your i
application for amendmect of year operating license for the Washington State 1
University Modified TRIGA R n earch Reactor that was submitted on April 19,.
j 4
1990.
During our review of your application, questions have arisen for which -
we require additional'information and clarification.
Please provide responses to the enclosed Request for Additional Information within 60 days of the date of-this-letter.
Following receipt of the additional information we will-i
. continue-our evaluation of your application.
If regarding this review, please contact me at (301)you have any questions 492-1127.
The reporting and/or recordkeeping requirements contained in this letter.
affe';t fewer than. ten respondents; therefore, OMB clearance is not required under P. L.'96-511.
Sincerely, Alexander Adams, Jr., Project Manager Non-Power Reactor, Decommissioning and Environmental Projects Directorate Division of Reactor Projects - III, IV,-Y and Special Projects heis@
Office of Nuclear Reactor Regulation s
DISTRIBUTION 16~cFe~tJ11eit i
PDNP r/f~
NRC & Local PDP D. Crutchfield
.W. Travers S. Weiss A. Adams
. E.1(ylton '
.0GC t-E. Jordan ACRS(10)
UFC IPMP7EA
- PDNP/PM iPDT@7D
.. :...../1 )g. ::............ ::............ ::.......
3
.:__..f..$...:.......____.::........____::...__.......::.........
- 5Weis's~
'NAME :
- AAdams:
_ _.. : tr_........ :......
DATE:06/2)/90
- 06k/
- 06/
90
. Document Name: AA RAI 6/19 M\\
9006270063 900621 5
PDR ADOCK 05000027
\\
p FDC g
.g,
t;
- p, '
';;,y, a J'
f W j
(/<bndo
. M; g:
. fo,p
' UNITED STATES -
y)i',
,f 3dLEAR REGULATORY COMMISSION' 7b:
WASHINGTON, D. C. 20655
,i i
- a - k
.* j June 21, 1990.
G
~
I 1
. Doc ket - No. : 50-27 i
Mr.- W. E. Wilson
~
' Associate Director.
l Nuclear Radiation: center
. ashington State University W
lc Pu11 man', Washington 99164-1300 i
Dear _Mr.:
Wilson:-
SUBJECT:
i REQUEST FOR> ADDITIONAL-INFORMATION 3
.We.are continuing our review of the-documentation submitted in support of your.
?
application for. amendment of, your oper.ating license for the Washington State' University Modified TRIGA Research Reactor that was submitted on April 19, A
, 1990. During-our review of your application, questions.have arisen for, which we require additional-information and.c1(rification.
Please provide responses
- to the enclosed Request for. Additional Information within 60 days of the date; of,this letter.. Following receipt of the addnional-information we will
' continue:our evaluation of your application.
If
~
- regarding this review, please contact me at (301)you have any questions e
492-1127.
The reporting a'nd/or recordkeeping requirements contained in this letter affect fewer;than ten respondents;-therefore, OMB clearance is not required under P. L.u96-511.
Sincerely,
-j
^
Alexander Adams, Jr., Pro ect nager.
Non-Power Reactor, Decomm ss ning and Environmental'Projec Directorate Division of Reactor Projects - III, IV, V and Special Projects' q
=-
Enclosure:
lAs stated-l
?
L l
i~
p v
1 e
.)
mi t.
I Sn.
3 0
c
.,=
qg
<j,-
e t
REQUEST FOR ADDITIONAL INFORMATION WASHINGTON STATE UNIVERSITY DOCKET NO. 50 ;
1.
For'your requested increase in authorized' steady state power level you l
made several changes to your Technical Specifications to make them consistent with the requested power level. However, Table 3.2 remains inconsistent with your request. Please amend Table 3.2.
i o
2.-
Your new proposed Technical Specificatio..s concerning the.use of byproduct material sealed sources in the reactor pool do not refer to any particular isotope or curie quantity. Does your safety analysis for Technical-Specification 3.14(3) hold true for any isotope? If a loss of' pool water eccident occurred, at what source size would melting of the encapsulation be credible? Also, if water loss occurred from the pool, at what source size would source radiation shine significantly increase radiation levels-produced by core shine?
In addition, the proposed Technical Specifications require c basis.. Proposed Technical. Specification 3.14(3) has a surveil-lance interval of monthly without a 'aximum interval between measurements.
m For an -interval of monthly, the maximum interval should not exceed six 1
weeks.;
3.
Proposed Technical Specification 4.3.3 has a verification interval of monthly'with'the interval not to exceed 60 days. Normally the maximum interval for monthly surveillances'is six weeks.
If you want a maximum i
interval of 60 days, please justify with a safety analysis.
4.
In Technical Specification 6.10 reference is made to the Region V Office l
of Inspection and Enforcement. This office does not exist anymore. The correct contact for the region is the Regional Administrator for written communication ano the Region V Office for telephone communication. Please update your Technical Specifications to. reflect these changes.
T