d',...s'o, UNITED STATES IN RESPONSE, PLEASE fN NUCLEAR REGULATORY COMMISSION REFER TO:
M900615B k
W ASHIN GT ON, D.C. 20%5 t
6 June 22, 1990 OFFICE OF THE SECR E T ARY MEMORANDUM FOR:
James M. Taylor Executive Director for Operations FROM:
[/sk6$J. Chilk, Secretary
/C
SUBJECT:
STAFF REQUIREMENTS - AFFIRMATION / DISCUSSION AND VOTE, 11:30 A.M.,
FRIDAY, JUNE 15, 1990, COMMISSIONERS' CONFERENCE ROOM, ONE, WilITE FLINT NORTil, ROCKVILLE, MARYLAND (OPEN TO PUBLIC ATTENDANCE)
I 1.
SEQY-90-178 - Final Rule Entitled. "Storace of Snent Nucienr Fuel in NRC-Annroved Storace Casks at Nuclear Power Reactor Sites" and Other Conformina Amendments to 10 CPR Parts 50 and 170 The Commission, by a 4-0 vote,* approved a final rule which would allow power reactor licensees to store spent fuel on.
their reactor sites under a general license.
The rule requires that licenscos notify the NRC that only NRC-cortified casks will be used for storage and that the spent fuel can be stored under conditions specified in the cask's certificate of compliance.
The rule also provides procedures and critoria for obtaining NRC approval of spent fuel storage cask designs.
The l
attached modifications should be incorporated.
Commiscioner Roberts did not participato,in this matter.
l
- Section 201 of the Energy Reorganization Act, 42 U.S.C.
55841, provides that action of the Commission shall be determined by a " majority vote of the members."
Commissioner Remick was.not present when this item was affirmed.
Accordingly, the formal vote of the Commission was 3-0 in favor of the decision.
Commissioner Remick, however-, had previously indicated that he would approve this paper and had he been present he would have affirmed his prior vote.
O g 7, 9006260356 900622' b
PDR 10CFR I
PTo.7 PDC
'l
}
.c q
i 2'-'
The rule should be revised as noted, reviewed by the Regulatory 1
Publications Branch, ADM, and returned for' signature.and-t-
publication.
1 (EDO)
(SECY Suspenset- '7/20/90)
Attachment:
I As stated.
'i I
t
-t cct Chairman Carr Commissioner Roberts.
I Commissioner Rogers.
}
Commissioner Curtiss i
Commissioner Remick' OGC GPA ACRS PDR Advance DCS - F1-24 I
I.
I r
b k
.e i
9 P
-. j i
L I
-i c
g g
.i e
cj
~. -
_ ~
and review by the NRC of technical documents required in i 72.212 and that P
these documents should be placed in the public document rooms for inspection by the public.
Response.
A condition of the general license is that a reactor licensee must determine whether activities related to storage of spent fuel at the reac-f tor site involve any unreviewed safety question or require any change in tech-nical specifications.
This written determination becomes part of the reactor 4
licensee's records.
Under 10 CFR 50.59, an unreviewed safety question is involved if (1) the probability of occurrence or the consequences of an accident or malfunction of eqaipment important to safety previously evaluated 2
in the SAR may be increased; or (2) if a possibility for an accident or malfunctinn of a different type than any evaluated previously in the SAR may be created; or (3) if the margin of safety as defined in the basis for any technical specification is reduced.
If the evaluation made under 10 CFR 50.59 reveals any unreviewed safety question or if use of a cask design requires any change in technical specifications or a facility license amendment is needed for any reason, then casks of that design cannot be used to store spent fuel i
I
- teL, 6 - *A ela te =;
The reactor licensee must mehe-QE Algc gpwe( ah-under the general license.
those changes to the facility license necessary to use the desired cask design, use a different cask design, or apply for a specific license under 10 CFR Part 72.
If the reactor l:
licensee chooses to make changes to accommodate the desired cask design, e.g.,
revise technical specifications, an application for a license amendment would l
l have to be submitted under 10 CFR 50.90.
l 3.
Comments.
It appears that a hearing would be mandated under the Act, as spent fuel storage under the general license would involve a license amend-ment.
The commenter argued that nuclear power reactor licenses contain a 7
i
)
l Another commenter stated that storage of sper.t fuel from two or more reactors i
inevitably makes the host site a de. facto regional repository, without the same l
l benefit of review and discussion given the regional site.
Another commenter suggested that the amount of spent fuel stored on a site should be limited to I
that amount produced by the site's reactor operations.
The major concern of these commenters appeared to be that spent fuel from a number of reactors would be deliberately accumulated and stored at one reactor site under this general license.
Response.
This rulemaking is not cencerned with transfer or shipment of spent fuel from one reactor site to another.
As explained in the discussion of t
the proposed rule (54 FR 19379), transf ar of spent fuel from one reactor tite to another must be authorized by on 4snadmaat-4e the receiving reac operating licensy" d L.4gM &A QqA A Ac, tor's LL J4 84
- sud P;; =tidgconducted under the regulations in 10 CFR Part 50.
The transportation of the spent fuel is subjec' to the regulations in 10 CFR Part 77..
This rulemaking is not germane to either spent fuel transfer or transportation procedures.
The NRC anticipates that, beginning in the early 1990s, the'e will be a significant need for additional spent fuel storage capacity at many nuclear power reactors.
This was a major reason for initiating this rulemaking at this time.
Dry storage of spent fuel in casks under a general licer.se would alleviate the necessity of transferring spent fuel from one reactor site to another.
5.
Comment.
The Coumission should reconsider a petition for rulemaking submitted by the State cf Wisconsin.
The petition requested that the NRC expand the scope of its regulations pertaining to spent fuel transport "to ensure that both the need for and the safety and environmental consequences of l
9 r
_m, _, _, _. _ _
license.
This was a major consideration for setting the date for submittal of a cask design reapproval application in the proposed rule.
The NRC has recon-sidered this requirement and believes that the period required for cask design reapproval can be reduced.
The final rule has been revised to incorporate lan-guage similar to that for other materials-type license renewals, which would allow a Certificate of Compliance to continue in effect until the application for reapproval has been finally determined by the Commission.
14.
Comments. 'No spent fuel dry storage should be allowed at sites that do not have fully operational State approved emergency preparedness plans.
Another commenter stated that, for emergency response purposes and for proper inclusion in emergency planning, the utility must notify State and local governments simultaneously with the NRC when spent fuel storage is begun.
Another commenter inquired whether or not States would be notified of spent fuel storage at the reactor site in order to minimize emergency response planning impacts, t
Response. The new 10 CFR 72.32(c) (no section in the old rule is applicable) states that "For an ISFSI that is located on the site of a nuclear power tsactor licensed for operation by the Commission, the emergency plan required by 10 CFR 50.47 shall be deemed to satisfy the requirements of this section." One condition of the general license is that the reactor licensee must review the reactor emergency plan and modify it as necessary to cover dry cask storage and related activities.
If the emergency plan is in compliance with 10 CFR 50.47, then it is in compliance with the Commission's regulation
{
Thus, the utility does not need to separately notify State and local l
a governments before beginning spent fuel storage.
$&b q cy 15
4 l
15.
Comment. What extra information, beyond that currently required in safety analysis reports, will be required in topical safety analysis reports for cas,k certification?
hsponse.
Currently a Topical Safety Analysis Report (TSAR) is submitted to obtain spent fuel storage cask certification.
NRC procedures allow l
applicants and licensees to reference appropriate Sections of a TSAR in licensing proceedings, which reduces investigative and evaluation costs for them.
Under this final rule, applications and a Safety Analysis Report (SAR)
(equivalent to a TSAR) will have to be submitted for cask design certification.
There will not be any " extra" information required in an SAR as a result of this rulemaking.
Guidance on the information to be submitted in an SAR for cask design certification is contained in Regulatory Guide 3.61, " Standard Format and Content for a Topical Safety Analysis Report for a Spent Fuel Dry Storage Cask."
i l
16.
Comment. One comment stated that it is unclear from the proposed rule as to whether full-scale or scale model testing is required for cask I
certification.
3H 7Y The at(.y nf cask designs is analyzed in the SAR.
Response.
The steff reviews cask design bases and criteria.
The design and performance of the cask and the means of controlling and limiting occupational radiation exposures are analyzep r:-'etd.
Appropriate functional and operating limits (technical specifications) are developed.
However, in instances where cask design, con-struction, or operation can not be satisfactorily substantiated, the staff may require that some component or system testing be performed.
During the first use of a certified design the licensee, in conjunction with the vendor, may be required to conduct preoperational testing on the first cask and submit a i
16
credit has not been accepted in reviews conducted under 10 CFR Part 72, however, regulatory guides may be issued in the future.
i i
- 19. Somment.
What will a current reactor licensee have to do to obtain a general license?
Response.
As specified in $ 72.212(b), a power reactor licensee must (1) perform written evaluations establishing that spent fuel storage will be in compliance with a cask's Certificate of Compliance and that there is no unre-viewed safety questidn or change in technical. specifications involved in activities at the reactor related to the storage of spent fuel in casks, (2) provide adequate safeguards for the spent fuel in storage, (3) notify NRC prior to first storage of spent fuel and whenever a new cask is used, and (4) keep r
records of spent fuel storage and related activities.
1 20 Comment.
Could the general license be used to store spent fuel beyond the term of the reactor operating license? Several utilities hold operating licenses at more than one site; thus, clarification is needed as to when an operating license is terminated and how licensees may use a general license.
Response.
A licensee who holds reactor operating licenses at more than i
one site must notify NRC for each site involved.
A licensee who holds i
operating licenses for more than one reactor located on a single site need i
notify NRC only once, r
Spent fuel can be stored on a site only as long as there is a power reactor with a valid license or the possession of spent fuel is authorized On. MLm Of Ywe.
under some other regulatiog This could be an amended license issued under 10 i
CFR 50.82, under which any reactor licensee may apply for termination of'the operating license and to decommission the facility.
When the reactor is put into a condition in which it cannot operate, the operating license would be 18
w e
.(
)
s amended to permit the licensee to possess the by product, source, and special
~I nuclear material remaining on the site. ' Storage of spent fuel in dry casks-under the general license could continue under the amended license, which is
- i often called a "pocsession-only" license.
Decommissioning means to remove a facility from' service, reduce the residual radioactivity to a level that permits termination of the license, and release of the site for unrestricted use.
Spent fuel stored under a= general 1
license must be removed before the site can be released for unrestricted use (i.e., decommissioned).
21.
Comments.
The propo =1 rule is unclear as to when the' general j
license would terminate if a cask model has been reapproved by NRC following use of the cask for a period of up to 20 years.
One commenter also suggested l
that S 72.212(a)(2) be changed to read:
"The general license for the storage of spent fuel in each cask fabricated under a Certific A of Compliance shall terminate either 20 years after the date that the cask is first used by the licensee to store spent fuel, or, if the cask.model is reapproved for storage of fuel for more than 20 years, at the conclusion of-this newly-approved j
storage period, beginning on the date that the cask is first used by the licensee to store spent fuel."
Response. The intent of proposed.6'72.212(a)(2) is that spent fuel may be stored under a valid Certificate of Compliance for a particular cask for a
' period of up to s.O years starting on the date the cask is first used for stor-age of spent fuel by the licensee.
If a cask design is reapproved, the 20 year storage period begins anew, including casks of that design that remain in use.
The 20 year storage period will also apply to new casks put into use after a Certificate of Compliance is reapproved.
If a particular cask's Certificate of 19-
+,
.,, ~.,.,,,
=-.
i submitted to the Commission in connection with applications may be made.
available for public inspection in accordance with provisions of the regulations contained in Parts 2 and 9 of this chapter."
In general, udfL applications rL ;. edt be made available except to the extent that they r
contain information exempt from disclosure such as proprietary or classified i
information.
- 27. Comments.
The proposed rule should be modified to include alternative storage technologies.
Two commenters indicated that the proposed 4
rule approval of only one storage technology (i.e., spent fuel storage in dry casks) provides an unfair competitive advantage to suppliers of these systems.-
Response.
The reasons for Commission approval of spent fuel storage in dry casks are discussed in the Federal Register notice. for the proposed rule.
An important consideration is that free-standing casks, being very strong and massive structures, are independent of the effects of site-specific natural i
phenomena.
For instance, in a worst case scenario considering the effects of earthquakes, a cask could topple.
Forces from this fall would be well within a cask's design limits for safe confinement of radioactivity.
Importantly,-site-l specific approvals would not be required by-the Commission, provided conditions l
in Subpart K are met.
One system specifically mentioned in the comments is NUHOMS (registered trade mark by NUTECH Inc.), which consists.of storing spent fuel in sealed canisters and storing the canisters in concrete modules.
Another system mentioned is the Modular Vault Dry Store (FW Energy Applications, Inc.), which consists of storing the spent fuel in sealed containers and storing the containers in racks set in concrete or earth for
(
shielding.
A major reason that these spent fuel storage systems, which are i
being considered-by the Commission for use under a general license, are.not 22 l
j l
under 6 72.72 [$ 72.51], is to enable NRC's'0ffice of Nuclear Reactor Regulation to. inspect for compliance with safeguards regulations.
The i-
[,
information submitted under 6 72.212(b)(1)(ii) is necessary to enable the NRC l
to take appropriate action in a timely manner on any issue that may arise.
30.
Comments.
The proposed rule requires that spent fuel storage cask designers give consideration to compatibility of cask designs with transporta-
[
tion and ultimate disposal by DOE.
Some commenters favored this consideration and others questioned its advisability, unless specific criteria could be pro-vided.
Some commenters indicated that NRC should also address the lack of consistency between Part, 71 and 72.
Response.
Specific design criteria for spent fuel disposal may not be available until a repository design is approved.
However, cask designers j
should remain aware that spent fuel ultimately will be received by DOE ~and that-My cask designs should adopt DOE criteria asgHr become/ available.
This does not mean that cask designs previously certified by-NRC will have to be recertified for this reason in order to continue to store spent fuel.
i It is not necessary that storage casks be designed for transport of spent j-fuel (i.e., to meet requirements in Part 71), because the spent fuel could be unloaded and transferred into transport casks approved under Part 71, if neces-i sary.- However, in the interest of reducing radiation exposure, storage casks should be designed to be compatible with transportation and DOE design criteria to the extent practicable.
Transportation compatibility will be attainable to-the extent that cask designers can avoid return of spent fuel from dry storage to reactor basins for transfer to a transport cask before moving it off-site for disposal.
i l
24
- s. =
l t
- 31. Comment.
Paragraph 72.238 should be revised to read "The criteria in 9 72.236(a) through (1) and (m)."
Response.
Paragraph'72.236(m) states that, to the extent practicable in the design of casks, consideration should be given to the compatibility of the dry storage. cask system and components with transportation and other activities related to the removal of the stored spent fuel from the reactor site for ulti-mate disposition by 00E.- DOE is developing repository storage designs that will be acceptable for use at their permanent spent fuel storage facility.
However, specific criteria for designing spent fuel storage casks for compatibility may not be available until the design for a high-level wasta repository is complete.
Revision of $ 72.238 is not considered to be appropriate at this time, although requirements in proposed 5 72.236(m) have-been retained separately.
i l
- 32. Comment.
The environmental assessment fails to conform to the requirements of the National Environmental: Protection Act of 1969 (NEPA) and the guidelines of the Council on Environmental Quality (CEQ).
Response.
The Commission's regulations for implementing Section 102(2) of NEPA in a manner consistent with NRC's domestic licensing _and related regula -
tory ' authority under the Atomic Energy Act are' set forth in 10 CFR Part 51.
These regulations were revised in March of 1984 (49 FR'9352) taking into account the guidelines of CEQ.
The environmental assessment for this rule was performedinQ::;ul::$conformitywiththeagency'senvironmentalreview procedures in 10 CFR Part 51 and thereby conforms to NEPA requirements.
33.
Comment.
While the public notice provides a list of documents which contain current information, a supplemental environmental impact statement is 25
. -. ~ ~.
lI o
j required in order to inform the public as to the nature of the information and e
to allow an opportunity for public comment.
j Response.
Potential environmental impacts related to this rulemaking were analyzed in its environmental assessment, in previous rulemakings related to revision of Part 72, and in the Commission's waste confidence proceedings that resulted in publication of the Waste Confidence Decision in the Federal Register on August 31, 1984 (49 FR 34658).
In its waste confidence proceedings the Commission found that it has reasonable assurance that-no significant environmental impacts will result from the storage of spent fuel for at least t
~ b'-
30 years beyond the expiration of nuclear power reactbr4 cWes.
Ti As a result of its Waste Confidence Decision, the Commission revised its regulations in 10 CFR 51.23 to eliminate discussion of the environmental impact of spent fuel 1
storage in reactor storage pools or independent spent fuel storage L
installations for the period following the term of the license.
In addition, t
the Commission recently published a review of its waste confidence decision:(54 FR 39765; September 27,1989).
Accordingly, an environmental assessment, rather than an environmental impact statement, is considered suitable for this
.rulemaking.
Also all of these documents were published in tne Federal Register l
l to allow an opportunity for public comment.
l 1
i l
34.
Comment.
The NRC has misrepresented the requirements of the NWPA.
The environmental assessment and finding of no significant environmental impact-7 states that the NWPA directs the Commission to approve one or more technologies for use of spent fuel storage.
While the demonstration program is mandated,
- the adoption of one or more technologies is not.
Response.
Section 218(a) of the NWPA does not direct the Commission to approve any spent fuel. storage technology.
However, the objective of the 26 g
i
... _ ~.,
.n
_ s Finding of No Significant Environmental Impact:
Availability The Commission has determined under the National Environmental Policy Act of'1969, as amended, and the Commission's regulations in Subpart A of 10 CFR Part 51, that this rule, if adopted, would not be a major Federal action signi-AW ficantly.affecting the quality of the human environment, and therefore wg j
1
' Environmental Impact Statement (EIS) is not required.
The finding is premised
(
on two actions,-which are (i) the licensing of an operating. reactor for a
-l particular site for Which an EIS has been-previously prepared and (ii) the independent certification of spent fuel storage casks for use at any reactor site.
Thus, the rule does.not add'any significant environmental impacts and 1
[
does not change any safety requirements.
The environmental assessment and-finding'of no significant impact on which this determination. is based are i
available for inspection at the NRC Public Document Room, 2120 L Street NW, Washington. 00.
Paperwork Reduction Act: Statement i
i 4
This final rule amends information collection requirements-that are subject to the Paperwork Reduction Act of 1980 (44 U.S.C. 3501 et seq;).
These requirements were approved by the Office of Management and Budget with approval numbers 3150-0011 and 3150-0132.
i Public reporting burden for this collectionLof information is estimated to
[
average 134 hours0.00155 days <br />0.0372 hours <br />2.215608e-4 weeks <br />5.0987e-5 months <br /> per response for a power reactor licensee and 2,448 hours0.00519 days <br />0.124 hours <br />7.407407e-4 weeks <br />1.70464e-4 months <br /> per response for a cask vendor including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.
Send comments i
37 s
4 e
~.. - ~
vw,,-,.
-w.s
1
.1 72.214 of this final rule.- Companies involved in the design, manufacture, and sale of casks are large private entities employing more than 500 persons and i
j having sales in excess of $1 million.
Some companies involved in the actual sale of these casks eugusus may not employ over 500 persons, but have sales in
)
excess of $1 million.
These companies may er ry ::t fall within the scope of yg $h)bPreliminary Regulatory Analysis, which "small entities" as defined above was made available for public comment 1en the proposed rule was. published, analyzed potential impacts on cask verMors.
No comments were= received on the analysis.
In any case, cask vendors vill decide whether or not to submit i
applications for cask design approval ased on_their analysis of,the potential market.
M k h Ea Md'd e q A, Backfit Analysis The NRC has determined that the backfit rule, 10 CFR 50.109, does not apply to this final rule, and, thus, a backfit analysis is not required, because these-amendments do not contain any provisions which would impose backfits as definded in 6 50.109(a)(1).
List of Subjects l
l Part 50:
Antitrust,- Classified information, Fire protection, Incorporation by reference, Intergovernmental relations, Nuclear power plants and reactors, Penalty, Radiation protection, Reactor siting criteria,- and Reporting and recordkeeping requirements.
4 1
39
- i
=
Cask Independent Spent Fuel Storage Installation (Dry Storage)
}
Docket Number:
72-1002 t
Certificate Expiration Date: [ Insert the same date as in certificate number 1000]-
Model Number:
NAC S/T I
1 j
i Certificate Number:
1003 SA.1 Submitted by:
Nuclear Assurance Corporation SAR
Title:
Topical Safety Analysis Report for the NAC-Storage / Transportation Cask Containing Consolidated Fuel for Use at an Independent Spent Fuel.
i Storage Installation (Dry Storage)
'i Docket Number:
72-1003 Certificate Expiration Date:
[ Insert the same date as-in certificate.
l number 1000],
r Model Number:
NAC-C28 S/T.
l S 72.216 Reports.
(a), The general licensee shall make an initial report under 6 50.72(b)(2)(vii) of this chapter of any:
(1) Defect discovered in any spent' fuel storage cask structure, system, or component which is important to safety; or (2) Instance in which there is a significant reduction in the effectiveness of any spent fuel storage cask confinement system during use.
f s-(b) A written report, including a dfscription of the means employed to repair any defects or damage and prevent recurrence, must be submitted using instructions in S 72.4 within 30 days of the report submitted ~in paragraph (a) 49 l
v J'
of,this section.. A copy of the written report must be sent to the-
-administrator of the appropriate Nuclear ~ Regulatory Commission regional office shown in Appendix D to Part 20 of this Chapter.
{
1
'l 72.218 Termination of licenses.
~
s (a) The not1fication regarding the program-for the management of spent fuel at the' reactor required by 9 50.54(bb) of this chapter'must include a' plan for removal of the spent fuel stored under this general license from the reactor site.~ The pian must show how the' spent fuel will be managed before i
starting to decommission systems'and components needed for moving, unloading, and shipping this spent fuel.
(b) An application for termination ~.of the reactor operating license i
submitted under S 50.82 of this chapter must contain a description of how the spent fuel stored under this general' license will be. removed from the reactor e
site.
A (c)- The reactor licensee'shall send 4 copy of:submittals under 9.72.218(a)~
~
and (b) to the administrator'of the appropriate Nuclear Regulatory Commission regional office shown in Appendix 0 to Part 20 of-this~ Chapter.
I
$ 72.220 Violations.
l This general license is subject to the provisions of' S 72.84 for "N' l
l violation of the regulations.under this part..
l-L Subpart L - Approval of-Spent Fuel Storage Casks t
6 72.230 " Procedures for spent fuel storage cask submittals.
i 50 l'
$= 72.236 ' Issuance of an NRC Certificate of-Compliance.
~A Certificate'of Compliance for a cask model will be issued by NRC on a i
. finding'that the requirements in 6 72.236(a) through (i) are met.
l l
k
-8 72.240 Conditions for spent fuel storace cask reapproval.
[
(t). The holder of a cask Certificate of Compliance, a' user of a cask
' approved by.NRC, or the representative of a cask user must apply for a cask'-
3 il model-reapproval.
s e
z(b).The application for reapproval of a cask model must be submitted not less than.30 days prior'to the ex iration date of the Certificate of 1
wk k A
Min./
"p% %
A4 Compliancg>
e existing Certificate of Co ifancewil not exp re until-
- p. - ~ e the application forgMhas been finally determined by the Commission.'
The E
application must be accompanied by a safety analysis: report (SAR).
The new SAR-may reference the SAR originally submitted for the cask model approval, t
-(c) A cask model will.be reapproved if conditions in S 72.238 are met, and t
i:
the application includes a demonstration that the storage of spent fuel has not j-in fact significantly adversely.affected structures, systems,-and components
]
important to safety.
l l
PART 50 - DOMESTIC LICENSING OF PRODUCTION-r i
AND UTILIZATION FACILITIES l
5.
The authority citation of Part 50 continues to read as follows:
AUTHORITY:
Secs. 102, 103, 104, 105, 161, 182, l'13, 186, 189, 68 Stat. 936, 937, 938, 948,.953, 954, 955, 956, as amended, sec. 234, 83 Stat. 1244, as amended (42 U.S.C. 2132, 2133, 2134, 2135, 2201, 2232, 2233, 2236, 2239, 2282);.
l 55 I
=-- --- :
.-