ML20043H569
| ML20043H569 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 06/13/1990 |
| From: | Gray E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| NUDOCS 9006260120 | |
| Download: ML20043H569 (2) | |
Text
_ _
)
[
(
t
[
JUN 131El U.S. NUCLEAR REGULATORY COMMISSION No. 90-79 REGION I NOTICE OF SIGNIFICANT LICENSEE MEETING Licensee:
Vermont Yankee Nuclear Power Corporation Facility:
Vermont Yankee Nuclear Power Station Docket No.:
50-271 F
F Time and Date:
9:30 a.m., June 20, 1990 i-Location:
DRP Conference Room, Region I Office, King of Prussia, PA t
Purpose:
To Discuss Vermont Yankee's Process for Determining Operability of Equipment NRC Attendees:
W. Kane, Director, Division of Reactor Projects (DRP)
W. Hodges, Director, Division of Reactor Safety (DRS)
J. Durr, Chief Engineering Branch, DRS J. Johnson, Chief, Projects Branch No. 3, DRP P. Johnson, Acting Chief, Reactor Projects Section 3A, DRP H. Eichenholl., Senft,r Resident Inspector R. Wessman, Direc ur, Project Dire:terate I-3, NRR
.M. Fairtile, Project Manager, PD I-3, NRR Licenser Attendees: J. Pelletier, Vice President Engilieering D. Rr.id, Plant Manager J. Herron, Operations Supervisor R. Pagodin, Technical Services Superintendent Note: Attendance by NRC personnel at this meeting should be made known by 4:00 p.m., June 18, 1990 via telephone call to E. H. Gray, Region I, at FTS 8-346-5146.
Prepared by:
L E. H. Gray, Act y Chief, RPS 3A
\\h 0FFICIAL RECORD COPY LIC MTG NOTICE 90 0001.0.0g8 9006260120 900613 06A 2/90 PDR ADOCK 05000271 P
I K
', =
=
2 J W I 3 1990 Distribution:
J. M. Taylor, Executive Director for Operations J. Sniezek, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research (DEDR)
H. Thompson, Deputy Executive Director for Nuclear Material Safety, Safeguards and Operations Support (DEDS)
B. K. Grimes, Director, Division of Reactor Inspection and Safeguards, NRR J. Lieberman, Director, Office of Enforcement T. E. Murley, Director, Office of Nuclear Reactor Regulation W. T. Russell, Associate Director for Inspection and Technical Assessment, NRR S. Varga, Director, Division of Reactor Projects - I/II, NRR B. Boger, Assistant Director for Region I Reactors, NRR R. Wessman, Director, Project Directorate I-3, NRR V. Rooney, Project Manager, PD I-3, NRR W. Bateman, NRR J. Caldwell, Regional Coordinator, EDO Public Document Room (PDR)
Local Public Document Room (LPDR)
State of Vermont State of New Hampshire NRC Resident Inspector bec:
Regional Administrator Deputy Regional Administrator Division Directors Branch Chiefs Section Chiefs Public Affairs Officer (2 copies)
J. McGrath, RI M. Miller, RI K. Smith, RI D. Holody, RI Region I Receptionist DRMA Files DRP Files Bulletin Board M. J. DiDonato, DRP RI:DRP
[ r.'.
6//lMG ay/meo '
6/5/90 0FFICIAL RECORD COPY LIC MTG NOTICE 90 0002.0.0 06/05/90