ML20043H377

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting W/Util on 900624 to Discuss Changes in Rev 6 of Examiner Stds & Exam Schedule for 1991
ML20043H377
Person / Time
Site: River Bend 
Issue date: 06/21/1990
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9006250324
Download: ML20043H377 (2)


Text

-

^l' i'

i g#

  • "4,

- UNITED STATES '

y) s i

J, Q

  • g.

NUCLEAR REQULATORY. COMMISSION

?

j REoloN IV

$11 RYAN PLAZA oRIVE. SUITE 1000 ARLINGTON, TEXAS 70011 4

JUN 2 L 1990.

.l y

?

.]

NOTICE OF SIGNIFICANT LICENSEE MEETIllG-U

.Name of-Licensee: Gulf States Utilities Name:of Facility: River Bend Station

. Docket:-

50-458

.Date and Time 10 a.m. Tuesday, July 24, 1990 of Meeting-

.d Location of tieeting:

Region IV Office, 8th Floor Conference' Room i

Purpose of. Meeting::

Discuss changes in Revision 6 of Examiner Standards and h

exam schedule'for 1991.

llRC. Attendees:

L; J. Callan, Director, Division of Reactor Safety

.l

~J. L. Pellet, Chief, Operator Licensing Section 1

1,.,

K.Perkins, Chief,OperatorLicensingBranch(ordesignee)

Licensee-Attendees:

E. D. Wentz, Operations Training Superintendent; Arkansas-

- fluclear > 0ne -

K. Canitz, Unit 1 Operation Training, Arkansas.fluclear One J. McMahon, Director, Nuclear Training, Comanche Peak J. Walker, Operations Engineering Training Manager Comanche Peak J..Ellara, Operations Training.. Supervisor,' Comanche Peak-R.-Creason, Operations Training Supervisor, Cooper Nuclear-Station M. Lazar, Supervisor - Operations.and Technical Training-Fort Calhoun

'I J. Tesarek, Supervisor, Licensed Operator Training Fort Calhoun D. Andrews, Director, Nuclear Training, River Bend R. Jackson, Training Coordinator,. River Bend J. Constantin, Simulator Training,. South Texas Project

.e C. Toth, Training Manager, Waterford-3

'l J. O'Hern, Operations Training Supervisors, Waterford y

i..

J. Zell, Manager, Nuclear Training, Wolf Creek J. Gilmore, Training Coordinator, Wolf Creek i

OK p

f

I

'l i

y.

.?

.i Gulf States'. Utilities-1 1

Note: Attendance'byNRCpersonndlattheNRC/licenseemeetingshouldbe'made:

known-by COB on July 20, 1990, via telephone call to J. L.' Pellet (FT 728-8159).

)

Approve By:

1 A2.

h 1

_../J.

7hllan, Di Nctor

'- }

Divisipn.of Reactor Safety-l z

i Distribution. - -

4 J.- H. Sniezek, DEDR

'H. L. Thompson, DEDS T. E. Murley, D/NRR W. T. Russell.-ADT/NRR i

J.'G. Partlow, ADP/NRR.

i I

J. Lieberman, D/0E L. J.' Chandler, Asst. GC for Enf.

  • l

'W. Paulson,' Project Manager /NRR

-John:Rogge. OED0 Staff R. D. Martin, RIV G.- F._Sanborn,-EO

. C. A. Hackney, RSLO i

~J. Gilliland, PAO, RIV c

NRC Attendees.

j DMB;-(IE42)-

'l Licensee: Address List

[

4 i

l

. f i

0

. z'

'h

~f 1

'.