ML20043F005

From kanterella
Jump to navigation Jump to search
Notification of 900619 Meeting 90-76 W/Util in Region I Ofc to Discuss Licensee Assessment of Power Ascension Testing
ML20043F005
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 06/01/1990
From: Mccabe E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 9006140085
Download: ML20043F005 (2)


Text

.

b_ n M P

,~

l ; *' f,,i:.

. y G

s# -

s :. b >,.

[

K 0 1 1990-l h

y

+

'L U.S. NUCLEAR REGULATORY COMMISSION No. 90-76 REGION I i

.N0TICE OF SIGNIFICANT LICENSEE MEETING.

. Licensee:^

Public Service' Company of New Hampshire Facility:-

-Seabrook Unit 1 I

i(

Docket No.:

50-443 h

= Time and Date:

1:00 p.m., June 19,.1990

-Location:

King of_ Prussia, PA'(Valley Forge Hilton-on Route 202)

'Purposet-To Discuss Licensee Assessment of Power Ascension Testing NRC Attendees:

'T Martin, Regional Administrator 7

W. Kane, Director, Division of Reactor Projects (DRP) i W. Hodges, Director,~ Division,of Reactor Safety (DRS) 1 M.-Knapp,-Director, Division of Radiation Safety and Safeguards (DRSS)

-l

~

J. Johnson, Chief, Projects Branch No. 3, DRP J. Durr, Chief, Engineering Branch, DRS R. Gallo, O'perations Branch, DRS

. E. McCabe, Chief, Reactor Projects Section 3B, DRP 1

L N. Dudley, Senior Resident' Inspector

+

y R. Wessman, Director, Project Directorate I-3, NRR V. Nerses, Project' manager, PD I-3,'NRR L

Licensee Attendees: T.-Feigenbaum,-Senior Vice' President and Chief Operating Officer B. Drawbridge, Executive Director.- Nuclear. Production R. DeLoach, Executive Director, Engineering and Licensing:

h 3 D.-Moody, Station Manager l

R T. Harpster, Director of Licensing Services b

G. Klein, Technical Support Manager Note: This meeting is open to the public. Additional attendance by NRC

_ personnel at this meeting should be made known by 4:00 p.m., June 18, t ' _-

.1990 via telephone call to E. McCabe, Region I, at FTS 8-346-5231.

ORIGINAL SIONED BY:

Prepared by:

Ebe C. McCabe, Chief, RPS 3B

?,

L l-l L

l OFFICL RECORD COPY LIC MTG NOTICE 90 0001.0.0 0

06/01/90 O$00000443 b

p lg';

PDC 3

.-....m.

r,1.

w.y o

4 2

m 01890 Distribution:

'J. M. Taylor,: Executive Director for Operations J. Sniezek, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research (DEDR)

H. Thompson, Deputy Executive Director for Nuclear Material Safety, Safeguards and Operations Support (DEDS)

B. K. Grimes, Director, Division of Reactor Inspection and Safeguards, NRR J. Liebarman, Director, Office of Enforcement

.T. E. Mueley, Director, Office of Nuclear Reactor Regulation W. T. Russell, Associate Director for Inspection and Technical Assessment, NRR h

S. Varga, Director, Divisic.i of Reactor Projects - I/II, "RR B. Boger, Assistant Director for' Region I Reactors, NRR r'

R. Wessman, Director, Project Directorate I-3, NRR V. Nerses, Project Manager, PD I-3, NRR W. Bateman, NRR J. Caldwell, Regional Coordinator, ED0 Public Document Room (POR) local Public Document Room (LPDR)

State of New Hampshire Commonwealth of Massachusetts NRC Resident Inspector bec:

Regional Administrator Deputy Regional Administrator

. Division Directors Branch Chiefs

'Section Chiefs Public' Affairs Officer (2 copies)

J. McGrath, RI-M. Miller, RI K. Smith, RI

'D. Holody, RI Region I Receptionist DRMA Files

-DRP Files Bulletin Board M. J.:DiDonato, DRP RI:D McCabe/meo 6/1/90 0FFICIAL RECORD COPY LIC MTG NOTICE 90 0002.0.0 Of/01/90