El-5 N
.
-In Reply Refer To:
Docket:
50-252/90-01
University of New Mexico
ATTN:
Dr. Frank Williams, Reactor
Administrator.
'
Chemical & Nuclear Engineering
Department.
-l
209 Farris Engineering Center
!
Albuquerque,:New Mexico 87131
Gentlemen:
-This refers to the inspection-conducted by Mr. R. E. Baer of this office during
3
the period May 7-10, 1990, of activities authorized.by NRC Operating
'
License R-102 for the University of New Mexico Research Reactor, and to the
discussion of our findings with Dr. R. D. Busch of your staff at the conclusion
i
of the inspection.
Areas examined during the inspection included reactor operations, emergency
_ preparedness, radiclogical protection, material accountability, and the
physical' security plan. Within these areas, the inspection consisted of
,
selective examination of' procedures and representative records, interviews with
,
personnel, and observations by the inspector.
The inspection findings are
documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
However, in accordance with 10 CFR Part 2,
i
Appendix C,Section V.G.1 of the NRC's Enforcement Policy, no citation is being
issued for the violation described in paragraph 14 of the enclosed inspection
report. _No deviations were identified.
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these = items is identified -in
paragraph 2'of the enclosed report.
'
Should you have any questions concerning this inspection, we will bd pleased to
-
discuss them with you.
Sincerely,
Original Signed By:
J
'
WRENCE A. .YANDELL
A. Bill Beach, Director
Division of Radiation Safety
1
and Safeguards
Enclosure: (see next page)
'RIV:FRPS
C:FRPS
D:DRSS
REBaer:Im
BMurr
ABBeac3
V/(/90
b /$/9
(o / +/90
h
\\
9006120150 900605
ADOCK0500{g2
a
k N,+
,
wNp
- '-
'
1 %+ -
- .
g
,_
pp.,
>p
,
,
Mu
-University of.New Mexico
-2-
<
l
cru
'
+ lY , ,
.,
s ,,
y
fJ,
bm
Enclosure:
'
[ if.
' Appendix - NRC. Inspection Report
.0l0 '
50-252/90-01
yt
F F
cc w/ enclosure:
! :-
. University of New Mexico
-
c '-%-
. ATTN:- R. D. Busch; Chief-
-
p
p
Reactor Supervisor
i
.
209 Farris Engineering Center
ju
l
Albuquerque, New Mexico 87131
h[
University of New Mexico
'"
ATTN: Ray B. Counsellor, Director
'
Occupational Safety
1801 Tucker N.E. . Building 233
_
_ , '
Albuquerque, New Mexico 87131-
Radiation Control Program Director
i
~P0' Box 1628
1
'
Sante Fe, New Mexico 87504-1628
bec t'o DMB (IE01)
bec:
zi
%
R. Martin
- Inspector
,
T. Michaels, NRR Project Manager-
'
- DRP.
Lisa Shea, RM/ALF
,
- RIV File
- MIS Coordinator
l
- RSTS Operator
- DRS
j
B.. Beach, DRSS
- L. Yandell, DRSS
,
@
- FRPS-DRSS-
- B. Murray
- w/766
L,w
I
'
.,
' '
..g
l
!
$
j
~ i
i
,
.
..
l'
4.
l'-
1
.
-
a