,..,i 3'
E24W L
U.S. NUCLEAR REGULATORY COMMISSION No. 90-66 REGION I i
NOTICE OF SIGNIFICANT LICENSEE MEETING Licensee:
Boston Edison Company-Facility:
Pilgrim Nuclear Power Station Docket No<:
50-293
~
Time and Date:
10:00 a.m., Friday, June 22, 1990 i
Location:
DRP Conference Room, Region I Office, King of Prussia, PA
Purpose:
Mid-Cycle Assessment of Licensee Performance NRC Attendees:
W. Kane, Director, Division of Reactor Projects (DRP)
R. Bellamy, Chief, Facilities Radiological Safety and Safeguards Branch, Division of Radiation Safety and 1
Safeguards (DRSS)
R. Gallo, Chief, Chief, Operations Branch, Division of 4
ReactorSafety(DRS)
J. Durr, Chief, Engineering Branch, DRS J. Johnson, Chief, Projects Branch No. 3, DRP.
i H. Gray, Acting Chief, Reactor Projects Section 3A, DRP D. Wessman, Director, Project-Directorate I-3 NRR R. Eaton, Project Manager, PD I-3, NRR i
J. Macdonald, Senior Resident Inspector C. Carpenter, Resident Inspector Licensee Attendees: R. Bird, Senior Vice President, Nuclear K. Highfill, Vice President, Nuclear Operations and Station Director R. Ledgett, Director, Special Projects R. Anderson, Plant Manager i
R. Swanson, Regulatory Affairs Department Manager R. Varley, Emergency Preparedness Department Manager F. Famulari, Quality Assurance Department Manager N. DiMascio, Radiological Protection Section Manager L. Olivier, Operations Section Manager G. Stubbs, Maintenance Section Manager R. Fairbanks, Nuclear Engineering Department Manager Note: This meeting is open to the public. Attendance by NRC personnel at this meeting should be made known by 4:00 p.m., Wednesday, June 20, 1990 via telephone call to R. Barkley, Region I, at FTS 8-346-5065.
Prepared by:
INAb SIGNED DY:
H. Gray, Acting Chief, RPS 3A 0FFICIAL RECORD COPY LIC MTG NOTICE 90 0001.0.0 i(0 1
05/15/90 l
9006070354 900324 PDR ADOCK 03000293 P
r i
i 1
MAY 2 41990 1
2 l
i Distribution:
1 J. M. Taylor, Executive Director for Operations J. Sniezek, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research (DEDR)
H. Thompson, Deputy Executive Director for Nuclear Material Safety, Safeguards and Operations Support (DEDS) 1 B. K. Grimes, Director, Division of Reactor Inspection and Safeguards, NRR J. Lieberman, Director, Office of Enforcement T. E. Murley, Director, Office of Nuclear Reactor Regulation W. T. Russell, Associate Director for Inspection and Technical Assessment, NRR j
S. ' virga, Director, Division of Reactor Projects - I/II, NRR B. Evger, Assistant Director for Region I Reactors, NRR 1
D. Wessman, Director, Project Directorate I-3, NRR R. Eaton, Project Manager, PD I-3, NRR W. Bateman, NRR J. Caldwell, Regional Coordinator, EDO Public Document Room (PDR) 1 Local Public Document Room (LPDR) i Commonwealth of Massachusetts (2)
NRC Resident Inspector W. Griffin, Plymouth Board of Selectmem Honorable William B. Golden, Massachusetts State Senator bec:
Regional Administrator Deputy Regional Administrator Division Directors Branch Chiefs Section Chiefs Public Affairs Officer (2 copies)
J. McGrath, RI M. Miller, RI K. Smith, RI D. Holody, RI Region I Receptionist DRMA Files DRP Files Bulletin Board M. J. DiDonato, DRP RI
/ I
/Q ar y/meo Gray [/2t/
5/15/90 0FFICIAL RECORD COPY LIC MTG NOTICE 90 0002.0.0 05/15/90