Forwards Summary of Average Alpha & beta-gamma Contamination Levels in Bldgs at United Nuclear Corp Site.Averages Represent Combination of Individual Averages for Floor,Wall & Ceiling Surfaces
ML20043B162
Person / Time
Site: Wood River Junction
Issue date: 05/21/1990
From: Berger J
OAK RIDGE ASSOCIATED UNIVERSITIES
To: Shum E
NRC
References
NUDOCS 9005240305
Download: ML20043B162 (2)


Text

05/22/90 02:07 ORAU-TERT-SCARBORO FTS 626-933-1 002-

,g Oak Riago Eneiuy>

ASS 00ialoc Post OHice Box 117 Enwon rent e u%ers ties Oak Ridge. lenessee 3/831 01'7 Syster'is Dv s on May 21, 1990 Mr, Ed Shum Office of Nuclear Materials Safety and Safeguards Nuclear Regulatory Commission Mall Stop 6H3 Vashington, DC 20555 Subj ect : AVERAGE CONTAMINATION LEVELS IN UNC BUILDINGS

Dear Mr. Shum:

Per your request we have calculated the average alpha and beta *6amma contamination levels in each of the buildin6s at the UNC site, Wood River Junction, RI.

The results are summarized in the attached table.

Averages j

presented represent the combination of individual averages for the floor.

wall, and ceiling surfaces, we1 hted by the total surface areas of these 6

individual surfaces.

Please note that ceiling activity levels were not i

included in the calculations for the Main Process and Pickle Liquor rooms of the Main Butiding, because those surfaces were surveyed by representatives of Region I, rather.than ORAU.

If you have questions, please contact me at FTS 626 3305.

Sincerely.

(jflff f

.nes D. Berger, Program Director nvironmental Survey and Site Assessment Pro 6 ram j

JDB:jle Attachments j

\\

cc:

G. LaRoche C. Haughney I

D. Tiktinsky i

I 9005240305 900323 PDR ADOCK 07000820 C

PDC g

  • ., N-G942/90 G2:03

' OMU-t1ERT-SCMBORO FT5 635-9394 003 o

s.~.

AVERAGE SURFACE CONTAMINATION LEVELS ON BUILDING INTERIOR SURTACES UNITED NUCLEAR CORPORATION WOOD RIVER JUNCTION, RI AVERAGE TOTAL CONTAMINATION LEVEL 2

(dpm/100 cm 3 Building Rooms / Area alpha beta *88mS*

Main Building Main Process Area 870*

930*

Pickle Liquor Room 660*

.910*

Columns Tower 1st 980 1110 Columns Tower - 2nd

~880 1040 Columns Tower 3rd 600 850 Foreman's Office 780 870-Receivin5 Area 310 630 Utility /HVAC Room 1200 930-Maintenance Room 360 670 change room 360 920 Chemistry Lab 470 610 General Offices /

50 500 Lunch Room Entire Building 670 830 Lugvun Process 290 730 Butiding Warehouse Building Warehouse 710 870 Receiving Area 270 600 Offices / Guard Post

<37 (410 Entire Building 570 620 N Gas Building 290 960 Emergency Generator 270 890 Buildin5 Counting Trailer

<37

<490 Health Physics 80

<490 Office Trailer Other Trailers 40 510

" Averages !or Main Process Area and Pickle Liquor Room include only 11oor and walls, ceiling measurements were ' conducted by others and were not_available for inclusion in calculations.