Forwards Commission 43rd Quarterly Status Rept on Emergency Preparedness for First Quarter FY90 for Plants.On 900315, License NPF-86 Issued Authorizing full-power Operation of Seabrook.Comanche Peak Unit 1 Issued License on 900417
ML20043B029
Person / Time
Site: Seabrook, Comanche Peak  
Issue date: 05/15/1990
From: Carr K
NRC COMMISSION (OCM)
To: Breaux J
SENATE, ENVIRONMENT & PUBLIC WORKS
References
NUDOCS 9005240097
Download: ML20043B029 (7)


Text

,

b.'

I Distribution:-

[., gn.

UNITED STATEg -

JTaylor

.l

},

l.

/

NUCLEAR REGULATORY COMMISSION HThompson o-I5

' WASHWGTON D. C. 20665 JSnieZek

-JBlaha

%(* *. * *.o May15;;1990 EDO r/f TMurley CHAIRMAN '

.RHartfield Central Files i

JHolloway, OC i

Helen Pastis', NRR d

1

-The Honorable John.B. Breaux,. Chairman i

~

Subcommittee.on Nuclear Reculation Committee on Environment and Public Works i

United States' Senate-1 Washington, D. C.

20510-

Dear Mr. Chairman:

l' am enclosing the -Nucleat Regulatory Commission's (NRC's) 43rd j

quarterly; status. report on emergency.preparednesstfor_ nuclear power plants..This report, which covers the period from-January-l' to March 31, 1990, has-been coordinated ~with the Federal Emergency Management Agency (FEMA).

0n March 1, 1990, the Commission authorized-the-issuance-of;a.

full-power license forithe Seabrook Nuclear > Station.

On March 15,

-1990, License No. NPF-86 was,1ssued authorizingLfull-power ti operation of Seabrook Unit No.'1.,

Concerning Comanche Peak, a full participation 1 emergency pre-

^1 paredness exercise was' conducted on July.25'26,'1989.

FEMA' evaluated the off-site-portion.of the exercise and,xin'acreport issued on January-12, 1990, concluded that-the off-site' emergency-plans and preparedness for' Comanche Peak:are adequate.

On ~.

April 16, 1990, the' Commission authorized'th'e' issuance of.a. full-

.1 power license for Comanche Peak.

On April 17, 1990,' License-No.

NPF-87 was issued authorizing ful.1-power operation of' Comanche 1

Peak; Unit No. 1.

a 1

Sincerely, Kenneth M.-Carr I

Encl o s t.re :

D g

L NRC Quarterly-Status.n port s \\ g ('

cc:

Senator Alan K. Simpson

.,1 s

j Originated:- NRR:Hopkins dr M#

p%

V J\\

go segggg gggir g g80 Hl.E CENTER

]6j#

j

CORRESPONDENCE PNU-F;)

N A

  • [

~

L;

/

rh UNITED STATES p'

NUCLEAR' REGULATORY COMMISSION g '.

_ WASHINGTON. O. C. 20666.

k;,...=[

~ May_'15L'990

CHAIRMAN The Honorable John B. Breaux~,. Chairman-Subcommittee on:Nucitar Regulation-

- Committee on' Environn.ent and Public ' Works United-States. Senate Washington,LD.

C.-

20510

Dear Mr. Chairman:

1 am enclosing the. Nuclear Regulatory _ Commission's (NRC's)'43rd-quarterly. status report on emergency-preparedness.for: nuclear, power plants.

This report, which covers-thefperiod.from January-11 to March 31,.1990, has been coordinated with the Federal: Emergency; Management Agency-(FEMA).

On' March--1,1990, the Commission; authorized-:-the? issuance ofca.

full-power: license: fort the-SeabrookJNuclear Station. 20n.MarchT15 ;

1990, License.No.;NPF-86=wascissued authorizing' full-power operation of Seabrookx Unit No. 1.

Concerning Comanche: Peak,.a full participation emergency' pre-t paredness exercise was conducted-on--July 25-26, 1989. ' FEMA:

evaluated the off-site portion.cof the exercise-and,-in.a report issued on: January 12.- 1990,' concluded:that-the;off-site! emergency.

plans-and preparedness for Comanche Peak'are adequate.

On April 16, 1990,. the.Commissioniauthorized the issuanceTof a, full-power license'for Comanche' Peak..On AprilT17, 1990, License-No.-

Na"-87 was issuedLauthorizing' full-power operation of. Comanche

.P.

< Unit No.

1.-

Sincerely, I

i i...k.

Kenneth M.'Carr

Enclosure:

NRC'. Quarterly Status Report cc:

Senator Alan K. Simpson

{p3 b

h 1

v

e1 ENCLOSURE-NRC OUARTERLY STATUS REPORT.

-ON EMERGENCY PREPAREDNESS FOR THE FIRST 00ARTER OF FY 1990 Seabrook

' A-Connission briefing was held on January 18,1990. On March 1,1990, thes Comn.P.sion authorized issuance of a: full-power cperating; license for:the'.

Seabrook~ Nuclear Station.. On March 115, 1990, License Nor NPF-86 was issued authorizing operation of Seabrook Unit No. I to-3411 megawatts thermal (100-percent rated power) power levels not in' excess of-..

. The plaat achieved criticality on March 20,1990,- and began its full-power ascension program. The:

program was schedu. led to be: completed in 70 days, after which the licensee'would be prepared to declare.the plant ready for. commercial. operation. Recent-turbine generator: problems at the ' plant have introduced a potential forLdelay in thistschedule.

e Comanche Peak

1 The NRC staff has reviewed the Comanche PeakLon-site emergency plan. The most recent full-participation exercise was. conducted July 25-26, 1989..The NRC:

evaluated the on-site portion of'the exercise and. concluded'that, with the

. exception of demonstrating accountability in the-protected area after a' site evacuation, the licensee's response was adequate to. protect 1the health and.

safety of.the public. The-licensee successfully' demonstrated its accountability capability in-a drfil on October. 27, 1989..The Federal Emergency Management Agency (FEMA) evaluated the off-site portion of: the July 25-26,11989 exercise-1 and in a report issued on January 12,'1990, concluded that the off-site-emergency plans and preparedness for Comanche Peak are adequate..Baseduon its-assessment of on-site preparedness and a: review of FEMA's findings on off-site

- preparedness, the staff concluded that'the overall~ state of emergency.

preparedness at Comanche Peak ist adequate to : support full-power operations.

A Commission briefing was held on April 16, 1990'.At-that briefing, the:

Commission authorized issuance'of a full-power operating,. license for Comanche

- Peak Unit No. IL On April 17, 1990, License No. NPF-87 was issued authorizing operation of Comanche Peak Unit No. I to power levels not in excess of 3411 megawatts thermal (300-percent rated power).

M l

5

7

.m 4,

~'\\;,,_

l o'

ENCLOSURE y

NRC OUARTERLY STATUS ~ REPORT-y ON EMERGENCY PREPAREDNESS FOR THE FIRST 00ARTER GF FY 1990 Seabrook'-

'A Commission briefing was held on January 18,1990. On March l' 199.0, the Comission authorized issuance of' a-full-power operating license for the-Seabrook Nuclear Station.- On March 15,:1990, Lice'se No. NP_F-86 was issued n

authorizing operation of Seabrook' Unit No. I to' 3411 megawatts-: thermal (100-percent rated power) power. levels not in excess of-.

1 The plant achieved-criticality on March 20, 1990, and began its full-power ascension: program. The-3rogram was scheduled to be completed in 70 days, after which the licensee would ae prepared to declare the plant ready for commercial; operation. Recent-turbir.e generator problems at the plant have introduced a potential for delay _

in this schedule, t

i Comanche Peak The NRC staff has reviewed the -Comanche Peak on site emergency plan.- The most

?

a recent full-participation exercise was conducted July 25-26, 1989.. - The:NRC:

evaluated the on-site portion of the exercise. and concluded that, with the exception of demonstrating accountability in the p'rotected' area after a: site a

evacuation.-the-licensee's response was adequate:to protect the health.and:

safety of the public. The licensee successfully demonstrated its accountability j

capability in a drill on October 27,-1989. :The. Federal Emergency Management-Agency (FEMA) evaluated the off-site. portion of the July:25-26,'1989 exercise-

.1

-and in a report issued on January 12, 1990,iconcluded that the:off-site-eaergency plans and preparedness for Comanche, Peak are adequate. Based on its assessment of on-site preparedness and a review of: FEMA's findings on off-site prcpredness,' the staff concluded that the overall state of emergency preparedness at Comanche Peak is' adequate to support' full-power operations.

A Commission briefing was held-on April-16,-1990. At that brieffng, the Commission authorized-issuance of a full-power operating license for Comanche Peak Unit Nc.1. On April.17,199L,ilicense No.= NPF-87 was issued authorizing operation of Comanche Peak Unit No. l' to power levels' not in. excess of 3411 megawatts thermal (100-percent rated power),

a 4

i j

y n

v

... ;..z l

The Honorable John B. Breaux, Chairman

Subcomittee on Nuclear Regulation-Committee on Environment and Public Works

. United. States Senate

-/

. Washington, D. C. -20510 j

l

Dear Mr.' Chairman:

{

I I am enclosing the Nuclear Regulatory Comission's (NRC's) 43rd and f nal'

. quarterly status report on emergency preparedness for nuclear power / plants.

}

This: report, which covers the-period from January 1 to March 31, 1990, has:

H been coordinated with the' Federal Emergency Management Agency (FEMA).

q On March 1,1990, theLC c

a l

nce of:a' ull-power license' for the Seabrook-Nuclear Station.

On March:1 License No.-

'NPF-86.was' issued authorizing. full-power operation of.Seab k Unit No. 1.

1 Concerning Comanche P_eak, a full participation emergen preparedness exercise-was conducted on July 25-26, 1989.- FEMA; evaluated th ff-site: portion'of the-exercise and, in a report issued on January 12, 1990 c o

off-site; emergency plans and preparedness for Coman Ee.oncluded that the Peak-are adequate.

j On April 16, IC90, the Commission authorized the issuance of acfull-power.

license for Comanche Peak. On April 17,.1990,/1censeNo.-NPF-87wasissued-l authorizing full-power operation of Comanche eak Unit No.1. -

j Sincerely, 1

q Kennet M. Carr-j 3

Enclosure:

DISTRIBUTION: [BPDi.X. LTR.].

I NRC Quarterly Status Report

- DTiffP.AL FILE FGILLESPIE..

j PTSB/PMAS RDG TiiURLEY

')

cc: Senator Alan K. Simpson JHOPKINS:

JJTAYLOR

.}

TC0X HTHOMPSON-MVIRGILIO RHARTFIELD' i

EDO RDG' JHOLLOWAY, OC "This correspondepce addresses. policy issues previously resolved by the Commissic-f, transmits factual information,~ or restates Com-mission policy See previous-oncurrence j

.PTSB:PMAS PTSB:PMAS PEPB:NRR PEPB:NRR DPEP:NRR C:PTSB:PMAS-1 JHopkins/ng' TCox FKantor

.RErickson'.FCongel itVirgilio-04/18/90*-

-04/18/90*

04/19/90*

04/20/90* 04/23/90*

4/24/90

/

A

'ADP:NRR ADSP:NRR EDO OCM F r lia.

.JPartlow DCrutchfield

. M ley JTaylcr KCarr-0

/ /90

/ /90 8

/90

/./90

/ /90 i

Rey ewed by: technical editor,- Barbara Calure, on 4/19/90.

'5

cThe Honorable John B. Breaux, Chairman Subcommittee on Nuclear Regulation Committee on Environment anu Public Works' l

. United States Senate Washington, D. C.

20510

Dear Mr. Chairmaa:

I am enclosing the fluclear Regulatory Commission,'s.(N' C's) 43rd quarterly R

status re1 ort on emergency -preparedness -for-nuclear power plants. /This.

report, w11ch covers the period from January 11to March 31',;1990/has-been~

coordinated with the Federal Emergency Managemert Agency (FEMA)

On/ March 1,1990,theCommisstonauthorizedthe-issuanceof-full-power license for the Seabrook Nuclear Station' On March 15, 19

, License No.

NPF-86 was issued-authorizing full-power operation of. Sea ok Unit No. 1.

]

Concerning Comanche Peak, a' full participation emergen

-preparedness exercise was> conducted on July 25-26,1989.x FEMA evaluated th exercise and, ir. a report issued on January 12,199 ',y off-site portion'of the concluded that the off-site emergency plans and preparedness for. Coma che Peak are' adequate.

On April 16, 1990, the Commission authorized th issuance of-a full-power jb license for Comanche Peak. On April 17, 1990, icense-No. NPF-87 was issued authorizing full-power-operation of Comanche eak Unit No.1..

-Sincerely, Kennet

.M. Carr Enclosute.

DISTRIBUTION: [BREAUXLTR.]-

NRC Quarte Q Status Report CENTRAL FILE

~FGILLESPIE

-DMossburg:

PTSB/PMAS:RDG THURLEY. (WITS 82-00432) cc: Senator Alan K. Simpson

'JHOPKINS' JTAYLOR

'TCOX HTHOMPSON MVIRGILIO RHARTFIELD-EDO RDG

'JHOLLOWAY,-0C by the Commissio ',p6 addresses policy issues previously. resolved "This corresponden transmits. factual information' or restates Com-mission policy."

See previous c currence PTSB:PMAS TSB:PMAS PEPB:NRR PEPB:NRR DREP:NRR ~C:PTSB:PMAS JHopkins/cg TCox FKantor RErickson FCongel-MVirgilio#M 04/18/90*

04/18/90*

04/19/90*

-04/20/90* 04/23/90*

( /JM/90-ADT:NRR ADP:NRR ADSP:NRR D:NRR-EDO OCM FMiragl a JPartlow-DCrutchfield TMurley JTaylor-KCarr

/

0

/' /90

/~'/90

/ /90

/' /90-

'/ /90 Rev ewed by technical editor, Barbara Calure, on 4/19/90.-

a t

laA4

W

^

, v. ;. '

~-

4 The Honorable John B. Breaux, Chairman

'l Subcomittee'on Nuclear Regulation 1

Comittee on Environment and Public Works-

_/

j United-States Senate-f Washington, D.-C.

20510

/

Dear Mr.' Chairman:

I am enclosir.9 the Nuclear Regulatory Commission's (NRC's) 43rd quarterly status"'re)ortonemergencypreparednessfornuclearpowerplants.~kasbeen-This-report, w11ch covers the period from January 1 to March 31, 1990,/

' coordinated.with the Federal Emergency Management Agency (FEMA)/

'On-March 1,~1990, the! Commission authorized the issuance.of,a fu llL pawer-

-j

~

license for the Seabrook Station.: On March 15,:1990,' Licepse No.1NPF-86 was issued authorizing full power operation-of Seabrook Nuclear Station,~ Unit No..la O

Concerning Comanche Peak, a f.ill participation emergepdy/

2

' preparedness exercise-was-conducted on July:25-26,- 1989.. ' FEMA evaluvid: the off-site-portian of the exercise and, in a report issued on January 12,;19pd, concluded that the 1

off-site emergency plans and preparedness for Co nche' Peak arn adequate, j

q On April 16, 1990, the Comission authorized } License No;' NPF-87 was issued

~

l issuance of a' full:powerL j

license for Comanche-Peak. = On April 17,'1990 authorizing full povier operation of Comanch6 Peak,- Unit No.'1.

Sincerely 1

1 i

Ken'neth M. Carr, Chairman I

N0 clear Regulatory Comission q

Enclosure:

DISTRIBUTION: [BREAUX'LTR;]:

NRC Quarterly Status Repor,

_ CENTRAL FILE FGILLESPIE

/-

PTSB/PMAS RDG TMURLEY i

cc: Senator Alan K. S Tcon JH0PKINS JTAYLOR TC0X HTHOMPSON MVIRGILIO RHARTFIELD-ED0 RDG JHOLLOWAY; OC

,/

la

/

.}{

TSB:PMAS /

PTSB:PMAS PEP JiRR PEP R-DREP:NRRJ C:PTSB:PMAS-I JHopkins/ Jig TCox41ft-I 'F for

.RD on -FCongel i MVirgilio 1)

[ ] //g/9p 4//g/90 3/90 4/jg/90 Q/11/

/ /90.

7

-,g

.ADT;NRR ADP:NRR ADSP:NRR D:NRR

-EDO-OCM FMiraglia JPartlow-DCrutchfield TMurley JTaylor

KCarr:

// /90

/ /90

/ /90

/ /90

/ /90-

/.~ /90 t

i k

I

~

Y