-o-REISSUED TOR MARCil 1990 B.... OPERAT1HG DATA _REEQRT DOCKET NO.
050-454
-y UNIT flyron One DATES 04/10/90 COMPILED BY:
K. Orris TELEPHONE:
(815)234-5441-x244e l
OPERATING STATUS 1.
Reporting Period March, 1990. Gross Hours 744 2.
Currently Authorized Power Level 3411 (MWt)
Design Electrical Rating: 1175_. (MWe-gross)
Design Electrical Rating: 1120 (MWe-net)
Max Dependable Capacity 1105 (MWe-net) 3.
Power Level to Which Restracted (If Any):'N/A 4.
Rearons for Restriction (If Any):
THIS MONTH YR TO DATE CUMULATIVE
- S.
Report Period Hrs.
744 2160 39,793 6.
Rx Critical Hours 681 779-31,319 7.
Rx Reserve Shutdown Hours 0
0 38 8.
Hourn Generator on Line 621.3 718.3 30,812.3 9.
Unit Reserve Shutdown Hours 0
0 0
- 10. Gross Thermal Energy (MWH) 1,724,857 1,090,959 93,151,399 t
- 11. Gross Elec. Energy (MhH) 570,230 623,640
'31,368,058
- 12. Het Elec. Energy (MWH) 537,489 569,692 29,547,724
- 13. Reactor Service Tactor 91.5 36.1 78.7
- 14. Reactor Availability Factor 91.5 36.1 78.8
- 15. Unit Service Factor 83.6 33.3 77.4 i
l
- 16. Unit Availability ractor
-83.6 33.3 77.4
- 17. Unit Capacity Factor (MDC net) 65.4 23.9 67.2 f
f
- 18. Unit Capacity Factor (DER net) 64.5 23.5 66.3
- 19. Unit Forced Outage Hrs.
0 0
1057
- 20. Unit Forced Outage Rate 0-0 3.3
'i
- 21. Shutdowns Scheduled Over Next 6 Months: None
- 22. If Shutdown at End of Report Period, Estimated Date of Startup 04/03/90
- 23. Units in Test Status (Prior to Commercial Operation): None
[
- Note - The cumulative numbers do not reflect power i
generated prior to commercial service.
(0625M/0062M/3) 9005210237 900510 t
- DR-ADOCK 05000454
.R g
[