ML20043A127
| ML20043A127 | |
| Person / Time | |
|---|---|
| Site: | Yankee Rowe |
| Issue date: | 04/30/1990 |
| From: | Berry R, Carroll K YANKEE ATOMIC ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| BYR-90-065, BYR-90-65, NUDOCS 9005180085 | |
| Download: ML20043A127 (6) | |
Text
.
['
YANKEE ATOMC EECTMC COMPANY "TAj;ll3k"ite i
580 Main Street. Bolton, Massachusetts 01740-1398
- YANKEE i
,/
1 May 9, 1990 7
BYR 90-065 1
1 1
United States Nuclear Regulatory Commission i
Document Control Desk Washington, D.C.
20555 Dear Sir Submitted herewith is the monthly Statistical Report for the Yankee' Atomic l
Power Station for the month of April, 1990.
Very truly yours, YANKEE ATOMIC ELECTRIC COMPANY wi R. L. Berry Assistant to Vice President-Operations
)
RLB/mte Enclosure l
l cc: Region I l
Resident Inspector - YNPS l
l-I
/
\\
j..
l 90051%$$k 89 L
?"
3 l
!~
t e
4 i
h
~ '
.{~
r i
F k
b i
M P
f YANKEE ATOMIC NUCLEAR POWER STATION l
MONTHLY STATISTICAL REPORT 90-04 FOR THE MONTH OF APRIL 1990 f
l l
\\
's
l OPERAi!NGDATAREPORT i.
DOCKETN0. 50-29 DAi!
900509 i
COMPLETEDBY K. CARROLL TELEPHONE-(508)779-6711 OPERAi!NG$1A10$
1.
UnitNase: Yankee Rove 2.
ReportingPeriod: April,1990 3..
LicensedTherealPower(Wt):
600 4.
Naseplate Rating (Gross We):-
185 5.
Desl9n Electrical Rating (Not W e):
. til l.
Nexious Dependable Capacity (Gross W e): 180 7.
Marious Dependable Capacity (Net W e):
- Ili i
8.
If Chan9es Occur in Capacity Ratin9s (!tess Number 3 Through 1) $1nce last Report, Give Raasons:
9.
Power level To Nhich Restricteo, if Any (Net W e):
- 10. Reasons For Restrictions. If Any:
ThisMonth Yr.toDate
.Cusulative 11 HoursinReportingPeriod 719.00 2,679.00
- 12. Number of Hours Reactor Nas Critical 719.00 2,679.00 209,616.27
- 13. Reactor Reserve Shutdown Hours.
0.00 0.00-0.00
- 14. HoursGeneratorOn-Line 719.00 2,879.00
. 104,367.71-
- 15. Unit Reserve Shutdown Hours 0.00'
'O.00 0.00
- 16. Gross thereal Energy Generated ( WH) 428,835.00
. 1,695,139.00 111,989,081.92
- 17. Gross Electrical Energy Generated (WW) 128,887.00-510,970.00
- 33,889,999.50
- 18. Net Electrical Ener9y Generated (WH) 110,693.00 418,174.945 31,706,719.85 -
- 19. Unit Service Factor 100.00-100.00 79.13'
- 20. Unit Availability Factor 100.00 100.00 19.13
- 21. Unit Capacity Factor 4sm; NDC Net) 100.52 99.46 15.20
!!. Unit Capacity Factor (Using DER Net) 95.92' 94.11-
'71.68
- 23. Unit Forced Outage Rate 0.00 0.00
-4.91
- 24. $hutdowns $cheduled Over Next 6 Months (Type, Date, and Duration of iach):-
Core 21RefuelingJune 23,1990, Seven Weds.
- 25. If Shutdown At End of Report Period, Estiested Date of startup:
' 26. Units In Test $tatus (Prior to Consercisi Operation):
Forecast Achieved INITIALCRITICAL!iY IN111ALELECTRICliY COMERCIALOPERATION l
t byO-4 w
w
--w-v e
er N
'1 AVERAGIDAILYUNiiPOWERLEVEL 6
00CKliNO. 6021 UN!!
YANtilR0WI' DATI.
900509 CONPL(ii0IV K. CARROLL-
-3 TELEPHON!
(506)7766711 N0 NTH APRIL,1990 DAY AVERAGEDAILYPOWERLEVil DAY AVIRAGEDAILYPOWERLEVIL (ReNet)
(We Net)~
1 169.8.
17 168.6 2
169.3 18 168.5 -
3 169.3 19-168,6 4
169.4 20 168.3 5
169.1 21 168.2 6
169.0 22 168.2 7
169.1 23 168.2 8
149.0 24 168.0 9
169.0 25 166.6 10 168.9 26 165.6 11 168.7 27 164.7 12 168.7 28 163.7 13 168.1 -
29 162.6 14 168.9 30 161.6 15 168.9 31 16 168.8 INSTRUCTIONS On this format, list the average daily unit poner level in W e-Net for each day in the reporting conth.
Computetothenearestwholenegawatt.
a 4.
s UN]iSHUTDOWN$ANDPOWERREDUCT10NS D00tET NO..50-19 UN11 YANKEERONE REPORTN0 NTH APRIL,1990 DATE 900509 CONPLETEDBY K. CARROLL TELEPHONE (508)118-6711
.i Methoo Licente CauseiCorrective 1
Duration
! OfShutting Event Cystes Component Actionto l
No.
Oste' fype (Hours) Reason DownReactor3Reporti.CoCe4 Code 5 PreventRecurrence NONE L
t i
e i
1 2
3 4
F: Forced Reason:
Nothod:
ExhibitG-Instructions 5: Scheduled AEauipmentFailure(Explain) 1-Manuti forPreparationofData I-MaintenanceorTest
't-Nanualscras.
Entrytheetsforticonse C-Refueling 3-AutoesticSeras.
EventReport(LER) File 0-RegulatoryRestriction.
4-Other(Explain)
EOperatorTrainingILicensedExasination F-Administrative 5
6-OperationalError(Explain)
Exhibit 1 - Sase Source H0ther(Exclain)
e DOCKETN0. 6025~
UN!i YANKitR0ff DAff -
900509.
COMPLETEDBY t.-CARR0Lt 1[L(PHONE (508)ill-litt Rf*0Ri Pf*TH APRIt,1990 SUNNARYOFOPERAllNGEXPERIENCil Plant consenced constdown at 2200 on 04/24/90.
..r
.