8E.100c CLINTON POWER STATION. P.O. HOX 678. CLINTON, ILLINOIS 61727 0678. TELEPHONE (217) 935 8881 --
i l
May 10, 1990 I
I
.1 i
.10CFR$0'36
)
I Docket No. 50 461' l
1 U.S. Nu '. ear Regulatory Commission'
)
Document Centrol Desk l
Washington, D.C.
20555 l
l.
h Subj ect:
Clinton Power Station, Unit 1 I
April 1990 Monthly Oneratine Report NPF 62 I
Dear Sir:
Please find in Attachment 1 the Monthly Operating Report for-Clinton Power Station, Unit 1, for the period ending April 30, 1990.7
.i Sincerely yours,-
l p
~
F.'A.. Spa enbe
,III[ l Manager -'Licen ng andssafety.
j DAS/alb a
Attachment I
cc:
NRC Region III Regional' Administrator
-1 NRC Resident Office l
/1
/
i t
/ p' '
90051G0080 900430 PDR ADOCK 05000461
.,h R
7.
t.
I'2 i
Pig) I cf 4 Attaclunent ' l to U.601665 i
CHALLENGES TO MAIN STEAM SAFETY / RELIEF VALVES tl
- L
' Month'
~ Anril 1990
'i
+
None-D P
?
S i
r
.?
4 h
r i
t 4
9 a.
I' s
+
P::go 2 cf 4
' Attachment 1 to U 601665 f
AVERAGE dally UNIT POWER LEVEL j
DOCKET NO.
50 461 UNIT Clinton l'
'DATE 04/30/90 COMPLETED BY F. A.
Sonneenbern. 111 TELEPHONE (217) 935-8881 X3400 MONTil Anril 1990 DAY AVERAGE Dt.ILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL-(MWe Net)
(MWe Net)
[
l 1
0 17>
0 2
0 18-0 7
3' 0
19,_,,
0 4
0 20.
0
.{
5-0 21 0
6 0
22
-0 7_
0 23 0
l.
8 0
24 0
f 9
0 25 151 10 0
26 427 11 206
'27 678' p
12 204 28 890 13 165 29 915 14 0
30 927 i
..?
15 0
31 N/A t
16 0
i 4
i
-i
'i f
r
,k S.
i s
Pega 3 cf 4'
. Attachment 1 to U-601665 OPERAIING DATA REPORT 1
DOCKET NO.-
50-461 UNIT Clinton 1 DATE L O4/30/90 ll COMPLETED BY F. A. Sonnnenberr.'III TELEPHONE (217) 935 8881 X3400 j
OPERATING STATUS 1.
REPORTING PERIOD: Anril 1990 CROSS HOURS IN REPORTING PERIOD: 212 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2126 MAX. DEPEND. CAPACITY (MDC)'
(MWe Net);
930 DESIGN ELECTRICAL RATING'(MWe Net): 211 3.
POWER LEVEL TO WHICH RESTRICTED-(IF ANY) (MWe Net): Eg.ng, 4.
REASONS FOR RESTRICTION (IF ANY): N/A-THIS MONTH YR TO DATE CUMULATIVE 5.
NUMBER OF HOURS REACTOR WAS CRITICAL...
326.0 1363.4 13.905.4 6.
REACTOR RESERVE SHUTDOWN HOURS.........
0.0 0.0-0.0 7.
HOURS GENERATOR ON LINE................
222.0 1259.1 13.353.7 8.
-UNIT RESERVE SHUTDOWN HOURS............
0.0 0.0 0.0-9.
CROSS THERMAL ENERGY GENERATED (MWH)...
364.454 3.283.911 33.341.076 10.
CROSS. ELECTRICAL ENERGY GENERATED (MWH) 117.315 1.098.296'11.026.660 11.
NET ELECTRICAL ENERGY GENERATED (MWH)..
100.8th 1.036.712 10.443.461 12.
REACTOR SERVICE FACTOR.................
45.3%
47.4%
65.2%
13.
REACTOR AVAILABILITY FACTOR............
45.3%
47.4t' 65.2%
14.
UNIT SERVICE FACTOR....................
30.9%
43.7%
62.6%
15, UNIT AVAILABILITY FACTOR...............
30.9%
43.7%
62.6%
'16.
UNIT CAPACITY FACTOR (Using MDC).......
15.1%
38.7%
52.7%
- 17. UNIT CAPACITY FACTOR (Using Design MWe) 15.04 38.6t 52.5%
18.
UNIT FORCED OUTAGE RATE................
54.0%
26.4%.
17.3%
j 19.
SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, DURATION OF EACH):
The second refueling outage is currently scheduled to begin September 9, 1990 and last for approximately 94 days.
2 0.~
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
Pcg2 4 cf 4
[',
to U-601665 UNIT SHUTDOWNS AND POWER REDUCTIONS.
DOCKET NO.
50-461 UNIT Clinton 1 DATE 04/30/90-COMPLETED BY F. A. Soantenberr. III TELEPHONE (217) 935-8881 X3400 REPORT MONTH ____Aoril 1990 METHOD OF TYPE SHUTTING DOWN F:
FORCED DURATION THE REACTOR OR CORRECTIVE ACTIONS NO.
DATE S: SCHEDULED (HOURS)
REASON (1)
REDUCING POWER (2)- /Curiin.nn 90-02 900401 S 236.2 B: Continued planned outage 4: ' continued shutdown 90-02.
for maintenance.
90-03 900413 F 260.8 H: CPS managment decision 1: : Manual. Reactor recirculation to shut down to perform flow was reduced and control
. additional' operating crew' rods were inserted.
~ training.on reactivity' 1 management and procedural-compliance.
~
(1) Reason A-Equipment Failure (explain), B-Maintenance or Test,- C-Refueling, D-Regulatory Restriction, E-Operator Training & License. Examination, F-Administrative, G-Operational Error..(explain),
H-Other
-(2) Method Manual, 2-Manual Scram, 3-Auto Scram, 4-Continued