ML20042G968
| ML20042G968 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 04/30/1990 |
| From: | Hairston W, Dennis Morey ALABAMA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9005160348 | |
| Download: ML20042G968 (6) | |
Text
l
..-s i'
- W Alabama Power Comp:ny 40 inverniss 0:ntir P;rkwty -
i
' P* st Office Box 1295 o
Birmingham, Alabama 35201.
Telephone 205 068 5581 W. G. Hairston,111 Senior Vice President '
a.
Nuclear Operation..
AlabamaPower -
thesouthem electrc system May 14, 1990
- b.
Docket No. 50-348 l
U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D. C.
20555 l
m Joseph M. Farley Nuclear Plant-Unit 1 Monthly Operating Data Report-t i.
Attached is the April 1990 Monthly Operating' Report for Joseph M. Farley Nuclear Plant. Unit 1, required by Section 6.9.1.10 of the Technical '
Specifications. 'Also attached is Temporary Change 8A (TCN8A)-to'the' Offsite Dose Calculation Manual (ODCM) for the Joseph M. Farley Nuclear 3
Plant as required by Section 6.9.1.10 of the 'Iwchnical Specifications.
If you have'any questions, please advise.
Respectfully submitted,
/
p
--s W.
L
'rst n,.
JGS:sme/1.6' Attachment cc Mr. S. D. Ebneter L
Mr. S. T. Hoffman l
Mr. G. F. Maxwell L'
1,
l.
9005160348 900430 PDR ADOCK 03000348 R
PDC e
q[
4 JOSEPH H. FARLEY NUCLEAR PLANT a'
UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS April, 1990 There were no shutdowns or significant power reductions during the month of April.
The following major safety-related maintenance was performed in the month of April:
- 1. Repaired the overspeed trip mechanism on the turbine driven auxiliary feedvater pump.
A defective circuit card had caused a spurious overspeed trip.
- 2. Miscellaneous corrective and preventive maintenance was performed on the diesel generators.
p.
OPERATING M1h REPORT DOCKET NO.
50-348 M'IE May 3, 1990 CLMPLETED BY D. N. Morey TELEPHCME (205)899-51M OPERATING STATUS Notes
- 1. Unit Name:
Joseph M. Farley - Unit 1
- 1) Cumulative data since 2._ Reporting Period:
April 1990 12-1-77, date of
.3. Licensed Thermal Power ( M t):
2,652 commercial operation.
- 4. Nameplate Rating (Gross Me):
860
- 5. Design Electrical Rating (Net Me):
829
- 6. Maximum Dependable capacity (Gross MWe):
866.1
- 7. Maximum Dependable Capacity (Net Me):
823.7
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, i
Give Reasons: N/A
- 9. Power Level ib Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A 1his Month Yr-to-Date Cu mlative
- 11. Hours In Reporting Period 719 2,879 108,815 12.-Number Of Hours Reactor Was Critical 719.0 2,879.0 83,137.4
-13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
- 14. Hours Generator On-Line 719.0 2,879.0 81,589.2
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MI) 1,906,730 7,491,592 208,645,508
- 17. Gross Electrical Energy Generated (MI) 621,678
_2,448,118 67,213, C
- 18. Net Electrical Energy Generated (MWH) 590,538 2,324,058 63,419,024
- 19. Unit. Service Factor 100.0 100.0 75.0
- 20. Unit Availability Factor 100.0 100.0 75.0
- 21. Unit Capacity Factor (Using MDC Net) 99.7 98.0 72.2
- 22. Unit Capacity Factor (Using DER Net) 99.1 97.4 70.3
'23. Unit Forced Outage Rate 0.0 0.0 7.7 24.-Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
- 26. Units In Test Status (Prior to Comercial Operation):
Forecast Achieved INITIAL CRITICALITY 08/06/77 08/09/77 INITIAL ELECTRICITY 08/20/77 08/18/77 COMMERCIAL OPERATION 12/01/77 12/01/77 Form 2/34 i
l
DOCKET NO.
50-348 UNIT 1
DATE May 3, 1990 COMPLETED BY D. N. Morey TELEPHONE (205)899-5156 MONrH April DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (f9fe-Net)
(P9fe-Net) 1
-783 17 822
.2 819 18 821 3
823
'19 821 4,
826 20 818 5
823 21 819 6
822 22 817 7
827 23 818 8
828 24 817-9 823 25 819 10 820 26 820 11 822' 27 819 12 828 28 817 13
_ 827 29 820-14 825 30 815 15 822 31 16 824 INSTRUCTIONS on this format, list the average daily unit power level in MWe-Net for each day in
-the reporting month. Compute to the nearest whole megawatt.
Form 13/21
- =.s.
~*
UNIT SEUTDOWBS AND POWER REDUCTIONS DOCKET NO..
50-348 UNIT NAME
' J. M. CARLEY -. UNIT ' 1 '
0J
.' DATE
'May 3, 1990--
COMPLETED BY D. N. MDRET REPORT MONTH APRIL TEIZPHONE (205)S99-5156'
.l l-l
'l l
l METHOD OF l LICENSEE l l
-l' CAUSE & CORRECTIVE l
l l
l
'l DURATION -l l SHUTTING l EVENT l SYSTEM l COMPONENT l
.ACION TO l
lNO.
l DATE' l TYPE l (HOURS) l REASON l'DOWN REACTOR
.l REPCRT 4.l CODE l CODE' l
PREVENT RECURRENCE
l.
1.
I I
I I
I I
l' I
I l'
j!HERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE MO5TH OF APRIL.l l
l I
l l
1 1
I I
I I
I I
- 1 I
I I
I I
1 I-1 I
l
' l-I I
I I-1 I
I I
I I
1 I
I I
I I
I I
I I
I I
i 1
1 I
I I
I I
I I
I I
I I
I I
I I
I i
1 1
I I
I I
I I
I I
I
- 1 I
I I
I
-1 I
I I
I I
I I
I I
I l
i I
I I
I i
I I
I I
I I
I I
I I
I I
I I
I I
i l
I I
I I
I I
I I
I I
I I
I I
I l
i I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I i
i i
I I
I I
i i
l i
l i
i I
I I
I i
i l
I I
i l
i i
l I
I If I
I I
i i
I I
i i
i i
l i
l i
1:
1 I
l 1-1 I
I I
I I
I I
I I
I I'
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
- l l
I I
I I
l i
I I
I I
Method:
Exhibit G-Instructions F: Forced Reason:
S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File {NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination Ezhibit I -Same Source-F-Administrative G-Operational Error (Explain)
(9/77)
H-Other (Explain)
M Rxat 1/2 W
d
3
- ,o JOSEPH M. FARLEY NUCLEAR PLANT ADDENDUM CONCERNING REVISION TO THE OFFSITE DOSE CALCULATION MANUAL Temporary Change 8A (TCN 8A) to the Offsite Dose Calculation Manual (ODCM) was approved by the PORC on March 16, 1990 and became effective on that date. The methodology in TCN 6A is consistent with the previous revision with the j
following exception:
A new factor, Dr (required dilution factor for gamma emitters), was introduced into the calculations which determine the alarm / trip setpoint for the effluent radiation monitors so that 10CFR20 compliance is met. The dilution factor is used to introduce necessary conservatism into the setpoint calculations.
It was determined by the PORC that this change does not reduce the accuracy or reliability of dose calculations or setpoint determinations.
The ODCM applies to Farley Nuclear Plant Units 1 and 2.