i' pabama Power company 40 inverness C:nter Paitw y Post Office Box 1295 i
I DirminDham. Alabama 352M Telephone 205 66B 5591 j
l l'
W. Q. Hairston,111 I
f Senior Vice Preeceni
)
Nuclear Operations mob 3Dl3 fDWCf t
t-the southern vectre system i
I May 14, 1990 i
(
Docket No. 50-364 I
1 l
U. S. Nuclear Regulatory Commission ATIN: Document Control Desk
]
washington, D. C.
20555 Joseph M. rarley Nuclear Plant Unit 2 Monthly Operating Dtta Report Attached is the April 1990 Monthly Operating Report for Joseph M. rarley Nuclear Plant Unit 2, required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
Respectfully submitted, W.
JGS:sme/1.6 Attachment s
cc Mr. S. D. Ebneter I
Mr. S. T. Hoffman Mr. G. F. Maxwell 9005160344 900430 ADOCK0500gg64 DR l{4
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE
SUMMARY
OP OPERATIONS April, 1990 The unit was shutdovn at 12:00 p.m. on April 27 to repair two containment coolers. The shutdown continued through the end of the month. There were no other unit shutdowns or significant power reductions during the month of April.
The following major safety-related maintenance was performed in the month of April 1, Replaced two containment coolers. The fan motors were refurbished on the two remaining coolers.
- 2. Miscellaneous corrective and preventive maintenance was performed on the diesel generators.
- 3. Took 2B charging pump out of service to replace the seal.
Determined that the rotating assembly had to be replaced.
Maintenance is continuing.
OPERATING DATA REPORT DOCKET NO.
50-364 DATE _May 3, 1990 COMPLETED BY D. N. Morey TELEPHONE (205)899-5156 iPERATING STATUS Notes
- 1. Unit Name
.toseph M. Farley - Unit 2
- 1) Cumulative data since
- 2. Reporting Period:
April 1990 7-30-81, date of 3, Licensed Thermal Power (MWt):
2,652 commercial operation.
- 4. Nameplate Rating (Gross MVe):
860
- 5. Design Electrical Rating (Net MWe):_ 829
- 6. Maximum Dependable Capacity (Gross MWe) _
868.6
- 7. Maximum Dependable Capacity (Net KVe):
828.2
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
- 9. Power Level To Which Restricted, If Any (Het HWe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A This Month Yr-to-Date Cumulative I
- 11. Hours In Reporting Period 719 2,879 76,728
- 12. Number Of Hours Reactor Vas Critical 646.4 2,806.4 59,484.3
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
- 14. Hours Generator On-Line 646.1 2,806.1 65,878.1
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 L
- 16. Gross Thermal Energy Generated (MVH) 1,694,856 7,267,680 167,523,947
- 17. Gross Electrical Energy Generated (MVH) 557,114 2,401,718
~55,068,260
- 18. Net Electrical Energy Generated (MVH) 529,418 2,286,012 52,229,402
- 19. Unit Service Factor 89.9 97.5 85.9
- 20. Unit Availability Factor 89.9 97.5 ___
85.9
- 21. Uait Capacity Factor (Using MDC Net) 88.9 95.9 83.2
- 22. Unit Capacity Factor (Using DER Net) 88.8 95.8 82.1 l
l
- 23. Unit Forced Outage Rate 0
0 4.4
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling / Maintenance Outage, September 14, 1990, approximately 7 weeks.
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup May 11, 1990
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81 D3/25/81 COMMERCIAL OPERATION 08/01/81 07/30/81 Form 2/30
- \\
~.
p4 a
p' DOCKET No.
50-364 UNIT 2
MTE May 3, 1990 COMPLETED BY D. N. Morey TELEPHONE (205)899-5156 MONTH April MY.
AVERAGE MILY POWER LEVEL DAY AVERAGE MILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 796 17 833 i
2 831 18 832 3
836 19 834 4
838 20 829 5
834 21 831 6
831 22 828 7
784 23 829 8
840 24 828 9
833 25 829 10 829 26 830 11 834 27 559 12 840 28 0
13 839 29 0
14 836 30 0
15 834 31 16 835 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest.whole megawatt.
Form 13/21 i:-
y.
.. ~.. _. -
...m
(.
UNIT sEUTDoteBS AND PotrER REDUCTIoR3 DoCEET Wo.
SS-364 tFNIT. NAME J. M.
FARI2T - tRet? 2 DATE May 3. 1990 Cos!PLETED ST D. N. ND9tET REPORT mon"E AFRIL TELEPWoNE
.(2051899-5150 I
I I.
1 I MErneo or i1.rctasEE I I
I causE a commEerrvE I
l-1 I
I oumArrow I I snurTznG I EvEsT I sTsTEn I coMronErr i
AcTrow To I-1 2
2 5
iso.
I DATE I TrrE 1 (novas I mEAsos I ooisw aEAcTon I mEromT e I cooE' I cooE i
enEvErr mEcemmEscs
.I I
I I
I I
I I
I I
l
.] 002' l 9C0427 l
S l
73.9 l
A l
1 l
N/A l BK l
Mo l Unit was shutdown to tepair two containment l
l l
l l
l l
l
'l l
l coolers. Two coolers were replaced and the fan l
l l
l l
l l
]
l l
l motors were refurbished la the remaining two l
1 1
I I
I I
I I
I leoolors.
I I
I I
I I
I I
I I
I I
I I
I I
I I
i i
i i
i i
i i
1 1
I i
I I
i l
1 i
i i
I i
i i
i l
I i
i i
i l
i I
i i
i i
l I
i i
i i
i I
I I
I I
I I
I I
I I
I I
I i
i 1
l i
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
i i
l I
I I
I I
I I
i I
I I
I I
I I
I I
i i
i i
i i
1.
1 I
I I
I I
I I
i i
i i
i I
I I
i i
I i
i l
i l
I i
l i
i i
l I
i i
i i
i l
i I
I I
I I
I I
I I
I I
I I
I I
i i
1 I
I I
I I
I I
I I
I I
I l
i I
I I
I I
I I
i l
I I
i l
i i
i l
i I
I I
I i
i i
l i
F: Forced Reason:
' Method:
Ezhibit G-Instructions 2: scheduled A-Equipment Failure (Explain) 1-Manual for ereparation of Data B-Maintenance or Test 2 e nnal scree.
Entry shoots for Licensee C-Refueling 3-Automatic scram.
Event E* port (LER) File (NUREG-D-Regulatory Restriction 4-other (Explain) 0161)
E-operator Training a License Examination F-Administrative Exhibit I -same source G-operational Error (Explaini