'Af DuqueeneUsht 1...
....,,, m.
Nucleat Group P O Dos 4 S"""S'*""^'*""
May c, 1990 Beaver Vality Power Station Unit 1 - Dochet No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. !@F-73 Monthly Operatira Reoort
'U. S.1Mclear Br9,)latory Reimion Dce: r.t Control Desk Washington, D.C.
20555 Gentlemen In accortlance with Arpendix A,
'Ibchnical Specifications, the Monthly Operating Report is subnitted for Unit 1 and Unit 2 for the month of April, 1999.
Very truly yours,
.l A
. D. Sieber (VicePresident
(-
' Nuclear Group 1
MW/ing Enclosures i
oc: NRC Pegional Office Kirg of Prussia, PA q
j
$k 9005160342 900430 PDR ADOCK 03000334 l
R PDC
(
l
t OPERATING DATA REPORT DOCKET NO :
50 334 REPORT DATE:
05/07/90 COMPLETED BY: M.A.WINGER TELEPHONE:
(412) 393 7621 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: APRIL 1990
- 3. LICENSED THERMAL POWER (MWt):
2652
- 4. NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
835
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
860
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
810
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
Licensed thermal power in 2652 MW not 2660 MW
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A
+
L THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
719.0 2879.0 122711.0
- 12. NO. OF KRS. REACTOR WAS CRITICAL:
630.8 2716.3 74854.8
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0,0 4482.8
- 14. HOURS GENERATOR WAS ON LINE:
611.8 2691.9 73159.4
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MVH):
1546013.0 6891907.0 172971962.5 4
- 17. CROSS ELECT. ENERGY GEN. (MWH):
501240.0 2265970.0 55535659.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
467970.0 2134810.0 51831960.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 85.1 93.5 61.8
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 85.1 93.5 61.8
- 21. UNIT CAPACITY FACTOR (K9C): PCT 80.4 91.5 55.1
- 22. UNIT CAPACITY FACTOR (DER): PCT 77,9 88.8 53.5 l
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 14.9 5.0 17.1 l
- 24. SHUIDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
NARRATIVE SGt9RY OF
[
M2fIHLY OIERATING DGYRIENCE l
UNIT I AFRIL 1990 i
April 1 The Unit remained shutdown to repair the 'C' Main Feedwater
{
Flow control Valve.
At 2323 hours0.0269 days <br />0.645 hours <br />0.00384 weeks <br />8.839015e-4 months <br /> the Reactor was taken critical.
April 2 At 0035 hours4.050926e-4 days <br />0.00972 hours <br />5.787037e-5 weeks <br />1.33175e-5 months <br /> the Reactor was shutdown to repair the Feedwater Flow Control Valves.
April 3 The Unit remained anutdown to repair the Feedwater Flow control Valves.
April 4 At 1822 hours0.0211 days <br />0.506 hours <br />0.00301 weeks <br />6.93271e-4 months <br /> the Reactor was taken critical.
April 5 At 1210 hours0.014 days <br />0.336 hours <br />0.002 weeks <br />4.60405e-4 months <br /> the Unit was synchronized at the Unit's output was escalated to a naminal value of 100% output.
April 6
'Ihe Unit operated at a nominal value of 100% output.
through April 24 April 25 At 1228 hours0.0142 days <br />0.341 hours <br />0.00203 weeks <br />4.67254e-4 months <br /> the Unit's output was reduced to approximately 94% to inprove cordition in the Main Condenser's Hotwell.
April 26 The Unit operated at approximately 94% output to inprove corxiition in the Main condensor's Hotwell.
April 27 At 1440 hours0.0167 days <br />0.4 hours <br />0.00238 weeks <br />5.4792e-4 months <br /> the Unit's output was decr= w to 91% to i
inprove conditions in the Main oordenser's Hotwell.
April 28 At 1230 hours0.0142 days <br />0.342 hours <br />0.00203 weeks <br />4.68015e-4 months <br /> the Unit's output was decreased to 87% to improve conditions in the Main condenser's Hotwell.
I April 29 At 0245 hours0.00284 days <br />0.0681 hours <br />4.050926e-4 weeks <br />9.32225e-5 months <br /> the Unit's output was MM to 70% to permit cleaning the
'D' and
'C' water boxes of the Unit's main condenser, April 30 At 0410 hours0.00475 days <br />0.114 hours <br />6.779101e-4 weeks <br />1.56005e-4 months <br />, the Unit's output was increased to a ncxninal value of 100% output.
a Ueff SMUTDOWWS Ae9 POWER REDUCTIOeS Docket no.
50-334 Unit some SVPS Unit #1 Dete eev 8. 1999 Completed 8y R.A. Winner REPORT NONTM APRIL 1990 7eiephone t412) 393-7621 4
Method of Licensee Cause & Corrective Duration Shutting Event System Component Actlen to so.
Date Typel (poure)
Reeson2 Down Reector3 Report
- Cede 4 Code 5 Prevent Recurrence 7
900301 F
107.2 A
4 1-90-007 CR tmSTRU Unit remained ehetdeen to repelr-the
'C' mein Feeduster Flev Centret volve.
8 900329 5
0 a
5 N/A NF NTEXCN Unit's output reduced f rom STE to 701 to persit cteseing the
'O' and
'C' meter bones of the mein Condenser.
1 2
3 4
F-Forced Reason:
Method:
Exhibit G-Instructions for S-Scheduled A-Equipment Fellure (Emplein) 1-menuel Preperation of Cate Entry Shee's 8-Meintenence or Test 2-h t Scree for Licensee Event Report (LER) File C-Refueling 3-Automatic Scree
(#UREG0161).
0-Regulatory Restriction 4-Cont *d.
from Previous ponth E-Operator Training & License Emee 5-Reduction 5
F-Administrative 9-Other Emhibit 5-Sese Source.
G-Operational Error (Emptein)
N-Other (Explain)
e AVERAGE DAILY UNIT POWER IEVEL Docket No.
50-334 Unit BVPS Unit 1 Date May B. 1990 otmpleted by M.A. W1mer 74tle[ hone (412) 393-7621 IONIH Aoril 1990 DAY AVERAGE DAILY FOICR Ir/EL DAY AVSAGE DAILY F0WER IEVEL (M4e-Net)
(ftie-Net) 1 0
17 817 2
0 18 813 3
0 19 808 4
0 20 808 r
5 138 21 804 6
778 22 813 7
823 23 800 8
821 24 800 9
821 25 750 10 808 26 721 11 821 27 704 12 821 28 663 13 808 29 546 14 833 30 725 15 792 31 N/A 16 808 INSTRUCTIONS On this format, list the average daily unit power level in )Sie-Net for each day in the reporting month, otmpute to the nearest Wole megawatt.
J i
?
OPERATING DATA REPORT i
r DOCKET NO.:
50 412
)
REPORT DATE: 05/07/90 COMPLETED BY: M.A.WINGER TELEPHONE:
(412) 393 7621 1
OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: APRIL 1990
- 3. LICENSED THERMAL POWER (MWt):
2652
- 4. NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
836
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
885
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
833 i
- 8. IF CHANCES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
Licensed thersel never is 2652 MW not 2660 MW
- 9. POWER LEVEL TO VHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
719.0 2879.0 21494.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
719.0 2879.0 18435.8
- 13. REACTOR RESERVE SHUTDOWN 110VRS:
0.0 0.0 0.0
- 14. Il0URS CENERATOR WAS ON LINE:
719.0 2879.0 18305,9
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. CROSS THERMAL ENERGY GEN. (MVH):
1380856.0 5739169.0 44551913.4
- 17. CROSS ELECT. ENERGY GEN. (MWH):
440800.0 1853700.0 14319800.0
- 18. NET ELECTRICAL ENERGY GEN. (MWil) :
412585.0 1748774.0 13505249.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 100.0 85.2
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 100.0 85.2
- 22. UNIT CAPACITY FACTOR (DER): PCT 68.6 72.7 75.2
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 5.7
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TiPE,DATE, AND DURATION OF EACil):
,,,.THE UNITS SECOND REFUELING OQIAGJ IS SCHEDULED TO START IN EARLY SEPTEMBER 1990 AND IS SCHEDULED TO BE COMPLETED IN NOVEMBER 1990.
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
NARRATIVE SLM ERY OF
)OmUX OPERATING DCPERIDiCE i
UNIT II AMIL 1990 i
i April 1 h Unit operated at a ncrainal value of 100% output.
ht@l April 6 April 7 At 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> the Unit's output was laduced to approximately 45% output to stretd1 the current fuel cycle.
i April 8 The Unit operated at approximately 45% output to stretd1 the current fuel cycle.
April 9 At 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> the Unit's output was escalated to approximately 85% to load follw.
April 10 7he Unit cperated at approximately 85% output to load through follow.
April 12 April 13 At 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> the Unit's output was r=+M to approximately 45% to out stretch the current fuel c3cle.
April 14 The Unit operated at approximately 45% output to through stretch the current fuel cycle.
April 22 April 23 At 0210 hours0.00243 days <br />0.0583 hours <br />3.472222e-4 weeks <br />7.9905e-5 months <br /> the Unit's output was escalated to amroximately 85% to stretd1 the current fuel cycle.
April 24 The Unit operated at approximately 85% cutput to stretch the -
current fuel cycle.
April 25 At 1330 hours0.0154 days <br />0.369 hours <br />0.0022 weeks <br />5.06065e-4 months <br /> the Unit's output was escalated to 95% to load follw.
l April 26 h Unit operated at 95% output to load follow.
through April 28 April 29 At 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> the unit's output was reduced to approximately 45% to stretch the current fuel cycle.
April 30 At 0320 hours0.0037 days <br />0.0889 hours <br />5.291005e-4 weeks <br />1.2176e-4 months <br /> the Unit's outprt was escalated to 85% to stretch the current fuel cycle.-
d' b
2.
t (Mili $#UTCCWitS A40 POWER REDUCTIoses Docket No.
50-412 Unit Waee SWPS Unit #2 Date may 8. 1990 Completed 9y M.A. Winner -
REPORT M00sTN APRIL 1990 Telephone (4123 393-76Z1 l
Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No.
Date Typet (Nours)
Reeson2 Down Reector3 Report #
Code 4 Code 5 Prevent Recurrence 9
900407 S
0 N
5 h/A ZZ ZZZZZZ Reduced output f ree 45% to stretch the current feet cycle.
10 900413 5
0 m
5 N/A ZZ ZZZZZZ Reduced output f rom 851 to 45% to stretch the current fuel cycle.
11 900429 S
0 m
3 m/A ZZ ZZZZZZ Reduced output f rom 951 to 451 to stretch the current fuel cycle.
1 2
3 4
F-Forced Reason:
Method:
Exhibit G-Instructions for S-Scheduled A-Equipment Failure (Emplain) 1-Menual Preperation of Data Entry Sheets 5-Maintenance or Test 2-Menual Scree for Licensee Event Report (LER) File C-Refueling 3-Automatic Scree (muREG0161).
0* Regulatory Restriction 4-Cont'd. from Previous Month E-Operator Training & License Emacs 5-Reduction 5
F-Administrative 9-Other Exhibit I-Saoe source.
G-operational Error (Emplain)
M-Other (Emplain)
i sa - e AVERAGE IRILY LWIT KMER IE'EL IXx::ket No.
50-412 i
Unit BVPS U, tit 2 Date May 8, 1990 ccmpleted by M. A. Wimar 7tl paone 1412)393-7621 1
MDtml ADril 1990 i
IRY AVERAGE IRILY KMER LEVEL IAY AVERAGE IRILY POWER IIVEL (We-Net)
(We-Net) 1 801 17 344 2
795 18 352 3
794 19 344 4
802 20 344 5
794 21 340 6
795 22 353 7
385 23 652 8
348 24 712 9
647 25 729 10 704 26 770 11 716 27 770 12 712 28 769 o
13 360 29 424 14 344 30 625 15 344 31 N/A 16 344 INS'110CTICNS On this format, list the average daily unit power level in We-Net for each day in the reportirg month. Ompute to the nearest whole megawatt.
1
.