MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 L-98-096, Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 2 L-98-068, Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 2 L-98-036, Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station1998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station ML20202F8191998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Beaver Valley Power Station,Units 1 & 2 ML20198L3981997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-072, Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 2 L-97-057, Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-040, Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 2 ML20216H6031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Beaver Valley Power Station ML20210K5821997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Bvps,Units 1 & 2 ML20140D7261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for BVPS ML20141B3501997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Beaver Valley Power Station,Units 1 & 2 ML20137T1441997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Beaver Valley Power Station Units 1 & 2 ML20136G4651997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Beaver Valley Power Station,Unit 1 & 2 ML20134K1521997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Beaver Valley Power Station,Units 1 & 2 ML20133F4831996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Beaver Valley Power Station Unit 1 & 2 ML20132B1001996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Beaver Valley Power Station Unit 1 & 2 ML20134H4921996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Beaver Valley Power Station,Units 1 & 2 ML20128N1911996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Beaver Valley Power Station Unit 1 & 2 ML20117M2091996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Beaver Valley Power Station Units 1 & 2 ML20117B2481996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Beaver Valley Power Station ML20115D4061996-06-30030 June 1996 Monthly Operating Repts for June 1996 for BVPS ML20117M1791996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Beaver Valley Power Station,Units 1 & 2 ML20111B2441996-04-30030 April 1996 Monthly Operating Repts for Apr 1995 for Beaver Valley Power Station ML20101R0621996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Beaver Valley Power Station ML20100R2841996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Beaver Valley Power Station ML20097D4541996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Beaver Valley Power Station ML20096B2531995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Beaver Valley Power Station ML20095D8651995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Beaver Valley Power Station ML20094H3631995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Beaver Valley Power Station ML20092F4251995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Beaver Valley Power Station ML20087F1331995-07-31031 July 1995 Monthly Operating Repts for Jul 1995 for Beaver Valley Power Station ML20086G1601995-06-30030 June 1995 Monthly Operating Repts for June 1995 for Beaver Valley Power Station Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-139, LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With1999-09-0202 September 1999 LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with ML20209D9531999-06-27027 June 1999 Inservice Insp Ninety-Day Rept Bvps,Unit 2 Outage 7,Year 1999 L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-078, Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable1999-05-0303 May 1999 Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With ML20205L0401999-04-0909 April 1999 SER Accepting Util Relief Requests for Inservice Insp Second 10-year Interval for Beaver Valley Power Station, Unit 2 L-99-054, Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite1999-04-0505 April 1999 Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with ML20196K7981999-03-25025 March 1999 Rev 4 to COLR, for Cycle 8 L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203E1181999-02-10010 February 1999 SER Accepting Proposed Revs to Plant,Units 1 & 2 Quality Assurance Program Description L-99-019, Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced1999-02-0505 February 1999 Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced ML20196F7011999-01-31031 January 1999 BVPS Unit 2 Heatup & Cooldown Limit Curves During Normal Operation at 15 EFPY Using Code Case N-626 ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20207E6631999-01-28028 January 1999 Rev 0 to EMECH-0713-1, Operational Assessment of SG Tubing at Beaver Valley Unit 1,Cycle 13 ML20210G7041999-01-22022 January 1999 BVPS Unit 1 Facility Changes,Tests & Experiments for 980123-990122 ML20207E5861998-12-31031 December 1998 Annual Rept 1998 for Toledo Edison ML20207E5601998-12-31031 December 1998 Annual Rept 1998 for Pennpower ML20198B9021998-12-31031 December 1998 BVPS Unit 1 Simulator Four Yr Certification Rept for 1995-1998 ML20207E5901998-12-31031 December 1998 Dqe 1998 Annual Rept to Shareholders ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with ML20207E5521998-12-31031 December 1998 Annual Rept 1998 for Ohio Edison ML20207E5761998-12-31031 December 1998 Annual Rept 1998 for Illuminating Co ML20204J6751998-12-31031 December 1998 1998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2 ML20199F5341998-12-29029 December 1998 Safety Evaluation Granting Relief Requests 1-TYP-3-B3.140-1, 1-TYP-3-B5.70-1,1-TYP-3-RH-E-1-1,1-TYP-3-B-G-1, 1-TYP-3-APP-I-1,1-TYP-3-UT-1,1-TYP-3-N-509,1-TYP-3-N-521, 1-TYP-3-N-524,1-TYP-3-B3.120-1 & 1-TYP-3-C6.10-1 ML20198K8551998-12-21021 December 1998 SER Granting Relief Request PRR-5 for Third 10-year Inservice Testing for Beaver Valley Power Station,Unit 1 ML20198A1631998-12-0909 December 1998 SER Approving Implementation Program to Resolve USI A-46 at Facility That Has Adequately Addressed Purpose of 10CFR50.54(f) Request L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with ML20195J3131998-11-12012 November 1998 Safety Evaluation Granting First & Second 10-yr Interval Inservice Insp Request for Relief L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with ML20206G0291998-10-31031 October 1998 BVPS Unit 2 Facility Changes,Tests & Experiments for Period 971101-981031 ML20154R9121998-10-20020 October 1998 Safety Evaluation Accepting Proposed Changes to QA Program Description in Chapter 17.2 of BVPS-2 Ufsar.Proposed Changes Would Modify QA Organization to Allow Warehouse QC Inspectors to Report to Manager of Nuclear Procurement Dept ML20154P7491998-10-19019 October 1998 SE Accepting Second ten-year Interval Inservice Insp Request for Relief RR-1-TYP-2-B5.40-1,Rev 0,for Plant, Unit 1 ML20198F7611998-10-0606 October 1998 Duquesne Light Co,Beaver Valley Power Station 1998 Emergency Preparedness Ingestion Zone Exercise, Conducted on 981006 ML20154C6711998-10-0101 October 1998 Safety Evaluation Concluding That Revised Model Identified in Dl Submittal Was Appropriate for Analysis of Installed Conduit Ampacity Limits.Determined That There Are No Outstanding Safety Concerns with Respect to Ampacity ML20154D5001998-09-30030 September 1998 Special Rept on Overview of BVPS-1 & BVPS-2 TS Compliance Issues & Corrective Action Taken L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With ML20154E2171998-09-28028 September 1998 Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods L-98-188, Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure1998-09-21021 September 1998 Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with ML20155B5871998-08-28028 August 1998 Non-proprietary Rev 1 to 51-5001925-01, Risk Assessment for Installation of Electrosleeves at BVPS & Callaway Plant ML20236X2351998-08-0505 August 1998 Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-157, Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product1998-07-29029 July 1998 Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 1999-09-30
[Table view] |
Text
. .
'Af DuqueeneUsht 1... .... , ,, m .
Nucleat Group P O Dos 4 S"""S'*""^'*"" May c, 1990 Beaver Vality Power Station Unit 1 - Dochet No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. !@F-73 Monthly Operatira Reoort
'U. S.1Mclear Br9,)latory Reimion ;
Dce: r.t Control Desk Washington, D.C. 20555 Gentlemen In accortlance with Arpendix A, 'Ibchnical Specifications, the Monthly Operating Report is subnitted for Unit 1 and Unit 2 for the month of April, 1999.
Very truly yours,
.l. D.ASieber ..
(VicePresident
(- ' Nuclear Group 1
MW/ing Enclosures i oc: NRC Pegional Office Kirg of Prussia, PA q j
$k 9005160342 900430 PDR ADOCK 03000334 l R PDC (
l
t OPERATING DATA REPORT DOCKET NO : 50 334 REPORT DATE: 05/07/90 COMPLETED BY: M.A.WINGER TELEPHONE: (412) 393 7621 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: APRIL 1990
- 3. LICENSED THERMAL POWER (MWt): 2652
- 4. NAMEPLATE RATING (Gross MWe): 923
- 5. DESIGN ELECTRICAL RATING (Net MWe): 835
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe): 860
- 7. MAX. DEPENDABLE CAPACITY (Net MWe): 810
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
Licensed thermal power in 2652 MW not 2660 MW
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): None
- 10. REASONS FOR RESTRICTIONS, IF ANY: N/A
+
L .
THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD: 719.0 2879.0 122711.0
- 12. NO. OF KRS. REACTOR WAS CRITICAL: 630.8 2716.3 74854.8
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0,0 4482.8
- 14. HOURS GENERATOR WAS ON LINE: 611.8 2691.9 73159.4
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MVH): 1546013.0 6891907.0 172971962.5 4
- 17. CROSS ELECT. ENERGY GEN. (MWH): 501240.0 2265970.0 55535659.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH): 467970.0 2134810.0 51831960.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 85.1 93.5 61.8
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 85.1 93.5 61.8
- 21. UNIT CAPACITY FACTOR (K9C): PCT 80.4 91.5 55.1
- 22. UNIT CAPACITY FACTOR (DER): PCT 77,9 88.8 53.5 l 23. UNIT FORCED OUTAGE RATE: (PERCENT) 14.9 5.0 17.1
- 24. SHUIDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
l
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
, M2fIHLY OIERATING DGYRIENCE l UNIT I :
AFRIL 1990 i April 1 The Unit remained shutdown to repair the 'C' Main Feedwater {
Flow control Valve. At 2323 hours0.0269 days <br />0.645 hours <br />0.00384 weeks <br />8.839015e-4 months <br /> the Reactor was taken ;
critical.
April 2 At 0035 hours4.050926e-4 days <br />0.00972 hours <br />5.787037e-5 weeks <br />1.33175e-5 months <br /> the Reactor was shutdown to repair the Feedwater Flow Control Valves.
April 3 The Unit remained anutdown to repair the Feedwater Flow control Valves. ;
April 4 At 1822 hours0.0211 days <br />0.506 hours <br />0.00301 weeks <br />6.93271e-4 months <br /> the Reactor was taken critical.
April 5 At 1210 hours0.014 days <br />0.336 hours <br />0.002 weeks <br />4.60405e-4 months <br /> the Unit was synchronized at the Unit's output ,
was escalated to a naminal value of 100% output.
April 6 'Ihe Unit operated at a nominal value of 100% output.
through April 24 April 25 At 1228 hours0.0142 days <br />0.341 hours <br />0.00203 weeks <br />4.67254e-4 months <br /> the Unit's output was reduced to approximately 94% to inprove cordition in the Main Condenser's Hotwell.
April 26 The Unit operated at approximately 94% output to inprove corxiition in the Main condensor's Hotwell. ;
April 27 At 1440 hours the Unit's output was decr= w to 91% to i inprove conditions in the Main oordenser's Hotwell.
April 28 At 1230 hours0.0142 days <br />0.342 hours <br />0.00203 weeks <br />4.68015e-4 months <br /> the Unit's output was decreased to 87% to improve conditions in the Main condenser's Hotwell.
I April 29 At 0245 hours0.00284 days <br />0.0681 hours <br />4.050926e-4 weeks <br />9.32225e-5 months <br /> the Unit's output was MM to 70% to permit cleaning the 'D' and 'C' water boxes of the Unit's main condenser, April 30 At 0410 hours0.00475 days <br />0.114 hours <br />6.779101e-4 weeks <br />1.56005e-4 months <br />, the Unit's output was increased to a ncxninal value of 100% output.
a Ueff SMUTDOWWS Ae9 POWER REDUCTIOeS Docket no. 50-334 Unit some
Dete eev 8. 1999 Completed 8y R.A. Winner REPORT NONTM APRIL 1990 7eiephone t412) 393-7621 4
Method of Licensee Cause & Corrective Duration Shutting Event System Component Actlen to so. Date Typel (poure) Reeson2 Down Reector3 Report
- Cede 4 Code 5 Prevent Recurrence 7 900301 F 107.2 A 4 1-90-007 CR tmSTRU Unit remained ehetdeen to repelr-the 'C' mein Feeduster Flev Centret volve.
8 900329 5 0 a 5 N/A NF NTEXCN Unit's output reduced f rom STE to 701 to persit cteseing the 'O' and
'C' meter bones of the mein Condenser.
1 2 3 4 F-Forced Reason: Method: Exhibit G-Instructions for S-Scheduled A-Equipment Fellure (Emplein) 1-menuel Preperation of Cate Entry Shee's 8-Meintenence or Test 2- h t Scree for Licensee Event Report (LER) File C-Refueling 3-Automatic Scree (#UREG0161).
0-Regulatory Restriction 4-Cont *d. from Previous ponth E-Operator Training & License Emee 5-Reduction 5 F-Administrative 9-Other Emhibit 5-Sese Source.
G-Operational Error (Emptein)
N-Other (Explain)
e .
AVERAGE DAILY UNIT POWER IEVEL Docket No. 50-334 Unit BVPS Unit 1 Date May B. 1990 otmpleted by M.A. W1mer .
74tle[ hone (412) 393-7621 IONIH Aoril 1990 DAY AVERAGE DAILY FOICR Ir/EL DAY AVSAGE DAILY F0WER IEVEL ,
(M4e-Net) (ftie-Net) 1 0 17 817 2 0 18 813 3 0 19 808 4 0 20 808 r 5 138 21 804 6 778 22 813 7 823 23 800 8 821 24 800 9 821 25 750 10 808 26 721 11 821 27 704 12 821 28 663 13 808 29 546 14 833 __ 30 725 ,
15 792 31 N/A 16 808 INSTRUCTIONS On this format, list the average daily unit power level in )Sie-Net for each day in the reporting month, otmpute to the nearest Wole megawatt.
, J i ?
OPERATING DATA REPORT r
i DOCKET NO.: 50 412 )
REPORT DATE: 05/07/90 COMPLETED BY: M.A.WINGER TELEPHONE: (412) 393 7621 1 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: APRIL 1990
- 3. LICENSED THERMAL POWER (MWt): 2652
- 4. NAMEPLATE RATING (Gross MWe): 923
- 5. DESIGN ELECTRICAL RATING (Net MWe): 836
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe): 885 i
- 7. MAX. DEPENDABLE CAPACITY (Net MWe): 833
- 8. IF CHANCES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
Licensed thersel never is 2652 MW not 2660 MW ;
- 9. POWER LEVEL TO VHICH RESTRICTED, IF ANY (Net MWe): None
- 10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH YEAR TO DATE CUMULATIVE .
- 11. HOURS IN REPORTING PERIOD: 719.0 2879.0 21494.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL: 719.0 2879.0 18435.8
- 13. REACTOR RESERVE SHUTDOWN 110VRS: 0.0 0.0 0.0
- 14. Il0URS CENERATOR WAS ON LINE: 719.0 2879.0 18305,9
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 16. CROSS THERMAL ENERGY GEN. (MVH): 1380856.0 5739169.0 44551913.4
- 17. CROSS ELECT. ENERGY GEN. (MWH): 440800.0 1853700.0 14319800.0
- 18. NET ELECTRICAL ENERGY GEN. (MWil) : 412585.0 1748774.0 13505249.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 100.0 85.2 >
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 100.0 85.2
- 21. UNIT CAPACITY FACTOR (MDC): PCT 68.9 72.9 75.4 *
- 22. UNIT CAPACITY FACTOR (DER): PCT 68.6 72.7 75.2
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 5.7
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TiPE,DATE, AND DURATION OF EACil):
,,,.THE UNITS SECOND REFUELING OQIAGJ IS SCHEDULED TO START IN EARLY SEPTEMBER 1990 AND IS SCHEDULED TO BE COMPLETED IN NOVEMBER 1990.
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
NARRATIVE SLM ERY OF
. )OmUX OPERATING DCPERIDiCE i UNIT II AMIL 1990 i
i April 1 h Unit operated at a ncrainal value of 100% output.
ht@l '
April 6 April 7 At 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> the Unit's output was laduced to approximately ;
45% output to stretd1 the current fuel cycle. ;
i April 8 The Unit operated at approximately 45% output to stretd1 the current fuel cycle.
April 9 At 0300 hours the Unit's output was escalated to approximately 85% to load follw.
April 10 7he Unit cperated at approximately 85% output to load through follow.
April 12 April 13 At 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> the Unit's output was r=+M to approximately '
45% to out stretch the current fuel c3cle. ;
April 14 The Unit operated at approximately 45% output to -,
through stretch the current fuel cycle.
April 22 April 23 At 0210 hours the Unit's output was escalated to amroximately 85% to stretd1 the current fuel cycle.
April 24 The Unit operated at approximately 85% cutput to stretch the -
current fuel cycle.
April 25 At 1330 hours0.0154 days <br />0.369 hours <br />0.0022 weeks <br />5.06065e-4 months <br /> the Unit's output was escalated to 95% to load follw.
l April 26 h Unit operated at 95% output to load follow.
through '
April 28 April 29 At 0300 hours the unit's output was reduced to approximately 45% to stretch the current fuel cycle.
April 30 At 0320 hours0.0037 days <br />0.0889 hours <br />5.291005e-4 weeks <br />1.2176e-4 months <br /> the Unit's outprt was escalated to 85% to stretch the current fuel cycle.-
d'
, b 2.
- t (Mili $#UTCCWitS A40 POWER REDUCTIoses Docket No. 50-412 Unit Waee SWPS Unit #2 Date may 8. 1990 Completed 9y M.A. Winner -
REPORT M00sTN APRIL 1990 Telephone (4123 393-76Z1 l Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No. Date Typet (Nours) Reeson2 Down Reector3 Report # Code 4 Code 5 Prevent Recurrence
- 9 900407 S 0 N 5 h/A ZZ ZZZZZZ Reduced output f ree 45% to stretch the current feet cycle.
10 900413 5 0 m 5 N/A ZZ ZZZZZZ Reduced output f rom 851 to 45% to stretch the current fuel cycle.
11 900429 S 0 m 3 m/A ZZ ZZZZZZ Reduced output f rom 951 to 451 to stretch the current fuel cycle.
1 2 3 4 F-Forced Reason: Method: Exhibit G-Instructions for S-Scheduled A-Equipment Failure (Emplain) 1-Menual Preperation of Data Entry Sheets 5-Maintenance or Test 2-Menual Scree for Licensee Event Report (LER) File C-Refueling 3-Automatic Scree (muREG0161).
0* Regulatory Restriction 4-Cont'd. from Previous Month E-Operator Training & License Emacs 5-Reduction 5 F-Administrative 9-Other Exhibit I-Saoe source.
G-operational Error (Emplain)
M-Other (Emplain)
sa - e i AVERAGE IRILY LWIT KMER IE'EL IXx::ket No. 50-412 i Unit BVPS U, tit 2 Date May 8, 1990 ccmpleted by M. A. Wimar 7tl paone 1412)393-7621 1
MDtml ADril 1990 i
IRY AVERAGE IRILY KMER LEVEL IAY AVERAGE IRILY POWER IIVEL (We-Net) (We-Net) 1 801 17 344 .
2 795 18 352 ,
3 794 19 344 4 _ 802 20 344 ,
5 794 _
21 340 6 795 22 353 7 385 23 652 8 348 24 712 9 647 25 729 10 704 26 770 11 716 27 770
- 12 712 28 769 o 13 360 29 424 14 344 30 625 15 344 31 N/A 16 344 INS'110CTICNS On this format, list the average daily unit power level in We-Net for each day in the reportirg month. Ompute to the nearest whole megawatt.
1
- , - - . __ . _ _ _ _ _ . _ _ . _ _ _ _ _ _ _ _ _ _ . _ _