- t UNITED STATES NUCLEAR REGULATORY COMMISSION' GRAND GULF UCLEAR STATION, UNIT 1 DOCKET NO. 50-416 NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT TO.
FACILITY OPERATING LICENSE AND PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION AND OPP 0PTUNITY FOR REARING The U.S. Nuclear Regulatory Comission (the Comission) is considering issuance of an amendment to Facility Operating License No. NPF-29, issued to System Energy Resources, Inc. (the licensee), for operation of Grand Gulf
~
Nuclear Station, Unit 1, located in Claiborne County, Mississippi.
The proposed amendment would extend the implementation date of Amendment No. 65, dated December 14, 1989, by 90 days. Amendment No. 65 approved the-l transfer of operations of Grand Gulf Nuclear Station, Unit 1, to Entergy Operations, Inc.
Before issuance of the proposed license amendment, the Comission will
]
have made' findings required by the Atomic Energy Act of 1954, as amended (the Act) and the Comission's ' regulations.
The _Comission has made a proposed determination that the request for amendment involves no significant hazards consideration. Under the Comission's regulations in 10 CFR 50.92, this means that operation-of the facility in accordance with the proposed amendment would rct:
(1) involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) create the possibility of a new or different kind of accident from any '
y 1
accident previously evaluated; o" (3) involve a significant reduction in n margin of safety.
L L
9005110076 900504 POR ADOCK 05000416 PDC
~
_,u.
,y_
The proposed amendment is to extend by 90 days the date for implementing
' license conditions which have been previously approved for transfer of operations to Entergy Operations, Inc, lh oreseen scheduling of other regulatory agency processes may delay the implementation date beyond the origin 1180 days (due to end on June 12,1990). The proposed amendment is an administrative change so as'not to impact another egency's requirements. As such, the proposed amendment does not involve any previously analyzed accident, does not create any new accidents, and does not involve any consideration of any change to a margin of safety.-
Therefore, based on the above considerations, the Comissior, has made a proposed determination that the amendment request involves no significant hazards consideration.
The Commission is seeking public comments on this proposed determination.:
L Any comments received within 30 days after the date of publication of this notice will be considered in making any final determination.
The Commission L
will not normally make a final determination unless it receives a request for a hearing.
Written comments may be submitted by mail to the Regulatory Publications Branch, Division of Freedom of Information and Publications Services, Office of Administration, U.S. Nuclear Regulatory Commission, Washington, D.C.
- 20555, and should cite the publication date and page number of this FEDERAL REGISTER notice. Written comments may also be delivered to Room P-223, Phillips Building, 7920 Norfolk Avenue, Bethesda, Martland, from 7:30 a.m. to 4:15 p.m.
Copies of 1
(
written comments received may be examined at the NRC Public Document Room the Gelman Building, 2120 L Street, N.W., Washington, D.C.
The filing of requests for. hearing and petitions for leave to intervene is discussed below.
l
(
%~
9
. By June 11, 1990
, the licensee may file a request for a hearing with respect to issuance of the amendment to the subject facility operating license and any person whose interest.may be affected by this proceeding and who wishes to participate as a party in the proceeding must file a written petition for leave-to intervene.
Request for a hearing and petitions for L
leave to. intervene shall be filed in accordance with the Conmission's " Rules of Practice for Domestic Licensing Proceedings" in 10 CFR Part 2.
Interested persons should consult a current copy of 10 CFR 2.714 which is available at the Commission's Public Document Roca, the Gelman Building, 2120 L Street, N.W., Washington,0.C. 20555 and at the Local Public Document Room located at Hinds Junior College, McLendon Library, Raymond, Mississippi 39154.
If a request for a hearing or petition for leave to intervene is filed by the above date, the Commission or an Atomic Safety and Licensing Board, designated by the Commission or by the Chairman of the Atomic Safety and Licensing Board Panel, will rule on the request and/or petition and the Secretary or the designated Atomic Safety and Licensing Board will issue a notice of hearing or an appropriate order.
As required by 10 CFR 62.714, a petition for leave to intervene shall set-forth with particularity the interest of the petitioner in the proceeding, and how that interest may be affected by the results of the proceeding.
The l
petition should specifically explain the reasons why intervention should be permitted with particular reference to the following factors:
(1) the nature of the petitioner's right under the Act to be made party to the proceeding; (2) the nature and extent of the petitioner's property, financial, or other i
interest in the proceeding; and (3) the possible effect of any order which may be entered ir, the proceeding on the pe:itioner's interest. The petition i
~
- *i.,
l^
~.
4 shoula 1150 identify the specific aspect (s) of the subject matter of the proceeoing as to which petitioner wishes to intervene. Any. person who has filed a petition for leave to intervene or who has been admitted as a party may amend the petition without requesting leave of the Board up to fifteen (15) days prior to the first prehearing conference scheduled in the proceeding, but such an amended petition must satisfy the specificity requirements described above.
Not later than fifteen (15) days prior to the first prehearing conference scheduled in the proceeding, a petitioner shall file a supplement to the petition f
to intervene which must include a list of the contentions which are sought to be litigated in the matter.
Each contention must consist of a specific statement of the issue of law or fact to be raised or controverted.
In addition, the petitioner shall provide a brief explanation of the bases of the contention and a concise statement of the alleged facts or expert opinion-which support the contention and on which the petitioner intends to rely in proving the contention at the hearing.
The petitioner must also provide references to those specific sources and documents of which the petitioner is
. aware and on which the petitioner intends to rely to establish those facts or expert. opinion, petitioner must provide sufficient information to show that a genuine cispute exists with the applicant on a material issue of law or fact.
. Contentions shall be limited to matters within the scope of the amendment under consideration. The contention must be one which, if proven, would entitle the petitioner to relief. A petitinr.er who fails to file such a supplement which satisfies thest requirements with respect to at least one contention will not be permitted to participate as a party.
' J?
i e 3.-.
.s.
4 Those permitted +o intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene, and have the opportunity to-participate fully in the conduct of the hearing, including the E
opportunity to present evidence and cross-examine witnesses.
If a hearing is requested, the Comission will make a final determination on the issue of no significant hazards considerations. The final determination will serve to decide when the hearing is held.
If the final determination is that the request for amendment involves no significant. hazards consideration, the Comission may issue the amendment and make it effective, notwithstanding the request for a hearing. Any hearing held would take place after issuance of the amendment.
It a final determination is that the amendment involves a significant l
hazards consideration, any hearing held would take place before the issuance of any amendment.
Normally, the Comission will not issue the amendment until the expiration of the 30-day notice period.
However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Comission may issue the license amendment before the expiration of the 30-day notice period, provided that its final determination is that the amendment involves no significant hazards considerations.
The final determination will consider all public and State comments received. Should the Comission take this action, it will publish a notice of issuance and provide for opportunity for a hearing after issuance.
The Commission expects that the need to take this action will occur very infrequently.
i.
I i
A request for a hearing or a petition for leave to intervene must be
' filed with the Secretary of the Comission, U.S. Nuclear Regulatory Commission, Washington,'O.C. 20555, Attention: Docketing and Service Branch, or may be delivered to the Commission's Public Document Room, the Gelman Building, 2120 L Street, N.W., Wasnington, D.C., by the above date. Where petitions are filed during the last ten (10) days of the notice period, it is requested that the petitioner promptly so inform the Comission by a toll-free telephone call to Western Union at 1-(800)325-6000(inMissouri 1-(800)342-6700). The Western Union operator should be given Datagram Identification Number 3737 and the-following message addressed to Elinor G. Adensam:
(petitioner's name and f
telephone number), (date petition was mailed), (plant name), and (publication date and page number of this FEDERAL REGISTER notice). A copy of the petition should also be sent to the Office of the General Counsel, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555,- and to Nicholas S, Reynolds, Esquire, Bishop, Cook, Purcell and Reynolds, 1400 L Street N.W., 12th Floor, Washington, D.C.
20005-3502, attorney for the licensee.
Nontimely filings of petitions for leave tu intervene, amended petitions, supplemental petitions and/or requests for hearing will not be entertained absent a determination by the Commission, the presiding officer or the Atomic Safety and Licensing Board that the petition and/or request should be granted baseduponabalancingofthefactorsspecifiedin10CFR2.714(a)(1)(1)-(v) and2.714(d).
l J
'l
.- y D
For further details with respect to this act'.cn, see the application
-for amendment dated May 4, 1990, which is availab1e for public inspection at the Commission's Public Document Room, the Gelmas Building, 2120 L Street,
'N.W., Washington, D.C. 20555 and at the Loca! 'ah'ic Document Room located at Hinds Junior College, McLendon. Library, Raymond, Miss'ssippi 39154.
Dated at Rockville, Maryland, this 4th day of May 1990.
FOR THE NUCLEAR REGULATORY COMMISSION p.-
Original Signed By:
1 Elinor G. Adensam, Director Project Directorate 11-1 Division of Reactor Projects - I/II-i' Office of Nuclear Reactor Regulation 4
i I
L i
'l
.-l P
l DEU -:P -
'4
..y.,...... :. 41y
- P, P
- P
/D
/_________:... __.... _....________...........____.___,.,
s
.jL(intner
- EA nsam NAME! : pat n
..__._:..._r /90----------:---d/90--------:-----/-------
DATE :05/4;
- 05/4'
- 05/ #' /90 OFFICIAL RECORD COPY