Summary of 900403 Meeting W/Doe in Albuquerque,Nm to Involve R Edge in Groundwater Compliance Issues Discussed at Previous Meetings
ML20042F663
Person / Time
Issue date: 04/13/1990
From: Randy Hall, Konwinski G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20042F660 List:
References
REF-WM-48 NUDOCS 9005090219
Download: ML20042F663 (2)


Text

j;

-y

, a.

c y-

. a w.%:-

ww-

~#

G-*

~ APR 2 3 1990 -

4 -

, f os

~

UNITED STATES A nt so g

g NUCLEAR REGULATORY COMMISSION 4

U j

[ REGION IV URANIUM RECOVERY FIELD OFFICE box 25325

.. DENVER, COLORADO 80225 ;

b F

"APR I 31990 URF0:GRK Docket-No. WM x

MEMORANDUM FOR::

Docket File'No. WM-4P

=!

FROM:

Gary R. Konwinski 1

{e Project-Manager.

SUBJECT:

MINUTES OF MEET::NG ON DURANGO GROUNO-WATER ISSUES ii s.

Participants:

Steve ~Hamp Hike-Kearny Jack-Caldwell:

'Ned.Larson Elizabeth Damler LGary Konwinski A. meeting was held at the DOE office in_ Albuquerque, New Mexico, on April 3, 1990. The purpose of the meeting was'to involve _Russ Edge in the ground-water compliance issues discussed in previous me_etings. Mr. Edge was - however, unable to attend. A meeting will be rescheduled toiinvolve'Mr. Edge in the.

ij various issues, as well as solicit his thoughts on ground-water compliance.

There were, however, several. issues' which were discussed that have: impacts 'on~

the design of the Bodo Canyon disposal cell.- DOE was made aware'of the Claymax

- l Lissues with which the NRC has concern.' Both of these issues, manufacturing QA/QC and installation QA/QC, have been researched by DOE.. They feel confident -

that they have collected sufficient information that these items of concern j

-will not longer be issues.

i A new issue surfaced during the meeting which concerned a point of< compliance-well' established in the paleo channel undcrlying the alluvium.

Apparently, an energy dissipation structure at the end of a diversion channel will pond water upgradient of -a point-of compliance well.

This could potentially cause water-level changes or modifications in water quality which could cause one to conclude that the cell is not performing as designed.

Due to this',' it was a

g.

"9005090219 900423 PDR WASTE PDC

.WM-48 D

x 1

j

x.

-- \\ '

q J..

i APR 2 3 (9901

2.'

APR 131990.

recommended that the TAC review their design to determine if alternate well siting or a modification to the energy dissipation structure would allow both' remedial action components.to fulfill their~ purposes.

-l l

Gary. Konwinski L

_,yl Project Manager.

.f L

. hc

'l

[

Approved by:

framon E. Hall,

a Ofrector

]

I 2

4 3

~1 g

j : h i

\\

\\:

1 1

'ki.

L 1

\\

s 3.g:

b t-s

.i4 l

t

.l

.i.

, 3;y 1

k...

k' '

.\\ 8

)

z

,\\

g l '; -

k; t

. '\\ '

j -

i r.:

s

~iJ x:

-