3.0 - BASIS (Continued)-

/

p LIMITkNGCONDITIONSFOROPERATION

' /

h l

l applicable condition, is not-reduced. For example, if hot standby is

/

l reached in 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, the time allowed to reach het shutdown is the next

/

11 hwra because the total time to reach hot shutdown is not reduced from

/

the allowable limit c.f 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />. Therefore, if remedial measures are

/

l completed that would permit a return to power operation, a penalty is not

/

}

incurred by having to reach a lower plant operating condition in less-

/

than the total time allowed.

/

The same principle applies with regard to the allowable outage time limits

/

of the action requirements, if compliance with the action requirements for

/

one specification results in entry into a condition of operation for: another:

/

l specification in which the requirements of the Limiting Condition for-

/

Operation are not met._ If the new specification becomes applicable in less-

/-

i j

time than specified, the difference may be added to the allowable outage

/

time limits of the second specification. However, the allowable outage

/

I time limit's of action requirements f or a higher reactor operating condition '

-/

of operation may not be used to extend the allowable outage time that is

/

j applicable when a Limiting Condition for Operation is not met in a lower

/

plant condition of operation.

/.

l The shutdown requirements of Specification 3.0.3 do not apply during cold

/

shutdown and refueling because the action requirements _of individual:

/

t

{

specifications define the remedial measures to be taken.

/

Specification 3.0.4 establishes limitations on. reactor operating condition.

/

changes when a Limiting Condition.for Operation is not met.

It precludes

/

j placing the facility in a higher operational condition when.the

/

l requirements for a Limiting Conditien for Operation are not met, and

/

I continued noncompliance to these conditions would result in a shutdown to

/

comply with the action requirements if a change in plant conditions were

/

permitted. The purpose of this specification is to ensure that facility

/

operation is;not initiated or that higher reactor operating conditions _

/

are not entered when corrective action:is being taken to obtain compliance

/

with a specification by restoring equipment to operable status or

/

parameters to specified limits.

Compliance with action requirements that

/

permit continued operation of the facility for an unlimited period of

/

time provides an acceptable level of safety for continued' operation

/

without regard to the status of the plant before or after a change in

/

plant condition. Therefore, in this case, entry into a reactor operating-

/.

condition or other specified condition may be made in accordance with

/

l the provisions of the action requirements. The provisions of this

/

specification should not, however, be interpreted as. endorsing the

/

failure to exercise good practice in restoring systems or components to

/.

operable status before plant startup.

/

\\

When a shutdown is required to comply with action requirements, the

/

i provisions of Specification 3.0.4 do not apply because they would delay

- /

l placing the facility in a lower plant condition of operation.

/

1 l

3-lab 9005080291 9004'27 Amendment No.130 I

i.

PDR ADOCK 05000255 p

PDC e

c--,

-*-r....-.-+.-y

,..-,c--

e mew-w-

--we-+v

,.,rwy

+ - * - * -

-e--

r-+=-t-re--.-,,e-