Amend 53 to License NPF-30,revising Tech Spec 3/4.7.1.2 to Add Clarification to Surveillance Requirements 4.7.1.2.1.a (4) & 4.7.1.2.1.b(1) by Identifying Automatic Valves Excluded or Included in Auxiliary Feedwater Sys
ML20042F186
Person / Time
Site: Callaway Ameren icon.png
Issue date: 04/26/1990
From: Hannon J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20042F187 List:
References
NUDOCS 9005070356
Download: ML20042F186 (5)


Text

m 4.

=.,,,

o

^ [

'g UNITED STATES NUCLEAR REGULATORY COMMISSION ry; WASHING TON, D. C, '0555

...../

a i

!!NION ELECTRIC COMPANY CALLAWAY PLANT, UNIT 1 DOCKET NO. STN 50-483 i

AMENDMENT TO FACIL_ITY OPERATING 1 LICENSE I

a Amendment No. 53 l

License No. NPF-30 i

1.

The Nuclear-Regulatory Commission (the Commission) has found.that:

A.

The application for amendment' filed by Union Electric Company-

)

(UE,the' licensee)datedNovember 14, 1989 complies with the standards-and requirements of the-Atomic Energy Act of 1954; as amended (the 4

Act), and the. Commission's rules and regulations set forth in 10' CFR Chapter I; B.

The facility will operate 'ir conformity with :the application, the provisions of-the Act, and the rules and regulat. ions _ of the Comission; C.

There is reasonable assurance (1) that-the: activities authorize'd by this amendment can be conducted without-endangering the health and

!~

safety of'the public, and (ii) that such. activities will be conducted in compliance with the Commission's regulations, D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and i

E.

The issuance of this amendment is in accordance with 10 CFR Part 51 i

of the Commission's regulations and all applicable requirements have 1

been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment, and para-i graph 2.C.(2)ofFacilityOperatingLicenseNo.NPF-30ishereby-amendedto read as follows:

1

'i 9005070356 900426 PDR ADOCK 05000483 I

P PDC i

l

f

.=

(2) Technical Specifications ar.d Environmental Protection Plan The Technical Specifications contained in' Appendix A, as revised through Amendment No. 53, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into.the license.

UE shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3. 'This license amendment is effective as of the date'of its issuance.

FOR'THE NUCLEAR REGULATORY COMMISSION p,

i

  • Cr John N. Hanno, Director Project Directorate 111-3 Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear. Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: April 26, 1990-i

ATTACHMENT TO LICENSE AMENDP.ENT N0. 53 OPERATING LICENSE NO. NPF-30 DOCKET NO. 50-483 1

Revise Appendix A Technical Specifications by removing the page identified below and-inserting the enclosed page.

The revised page is identified by' c

the captioned amendment number and-contains marginal lines indicating the area of change. The corresponding overleaf page is provided to maintain document completeness.

REMOVE INSERT 3/4 7-5 3/4 7-5 l

l l

i

T g.

L

+

~

PLANT SYSTEMS l

SURVEILLANCE REQUIREMENTS (Continued) 3).

VerifyingLthat each non-automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in its correct position; and 4)

Verifying that. each automatic valve, other than AL-HV-30, 31, 32, and 33, in the flow path is in the fully open position whenever the Auxiliary Feedwater System-is placed in automatic control or when above 10% RATED THERMAL POWER.

j.

I

- b.

At least once per 18 months during shutdown by:.

1)

Verifying that automatic valves AL-HV-30, 31, 32, and 33 in-the ESW supply to the auxiliary feedwater rumps actuate to their full open position upon receipt of an Auxiliary Feedwater Pump Suction Pressure-Low test signal -

t i

2)

Verifying 'that each auxiliary feedwater pump starts as designed automatically upon receipt of an Auxiliary Feedwater Actuation test signal, and 3)

Verifying that each auxiliary feedwater motor-operated discharge

{

i valve limits the flow to each steam generator from the motor-driven' pump to less than or equal to 320 gpm.

I 4.7.1.2.2 An auxiliary feedwater flow path shall be demonstrated OPERABLE

]

following each COLD SHUTDOWN of greater than 30 days prior to entering MODE 2 by verifying normal flow to at least two steam generators from one auxiliary feedwater pump.

i i

i CALLAWAY - UNIT 1 3/4 7-5 Amendment No. 53

l.

PLANT SYSTEMS CONDENSATE STORAGE TANK LIMITING CONDITION FOR OPERATION 3.7.1.3 Thecondensatestoragetank(CST)shallbeOPERABLEwithacontained water volume of'at lesst 281,000 gallons.

APPLICABILITY: MODES 1. 2, and 3.

'{

ACTION-i With the CST incperable, within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />'either:

L a.

Restore the CST to OPERABLE status or be-in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT' SHUTDOWN within-the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, or i

b.

Demonstrate the OPERABILITY of the Essential Service Water (ESW)

System as a backup supply to the auxiliary feedwater pumps and restore the CST to OPERABLE status within 7 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

1 i

SURVEILLANCE REQUIREMENTS 4.7.1.3.1 The CST shall be demonstrated OPERABLE at least once per 12 ' hours by verifying the contained water volume is within its limits when the tank is the supply source for the auxiliary feedwater pumps.-

4.7.1.3.2 The ESW System shall be demonstrated OPERABLE at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying that the ESW System is in operation whenever the ESW System is the supply source for the auxiliary feedwater pumps.

CALLAWAY - UNIT 1 3/4 7-6 i

l