Issue date: 04/25/1990
From: Hannon J
Office of Nuclear Reactor Regulation
To: Kaplan A
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20042F098 List:
References
TAC-61443, NUDOCS 9005070221
Download: ML20042F097 (3)


Text

s April 25, 1990 Docket No. 50-440 DISTRIBUTION:

M NRC & Local PDRs PDIll-3 r/f JZwolinski JHannon TColburn PKreutzer OGC-WF1 Mr. Alvin Kaplan, Vice President-EJordan ACRS(10)

Nuclear Group PD111-3 Gray CYCheng The Cleveland Electric illuminating GJohnson RHerman Company 10 Center Road Perry, Ohio 44081

Dear Mr. Kaplan:

SUBJECT:

FIRST 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAM PLAN FOR THE PERRY NUCLEAR POWER PLANT UNIT NO. 1 (TAC H0. 61443)

By letters dated March 31, 1987 April 12 and November 18, 1988 and January 6, 1989, you submitted the first 10-year interval inservice Inspection Program Revision 0, associated relief requests and responses to NRC staff requests for additional information for the Perry Nuclear Power Plant Unit No.1. The program plan was submitted for review and evaluation for compliance with the requirements of the appropriate Edition and Addenda (1983 Edition through Summer 1983 Addenda) of Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code as incorporated by reference into the Commission's regulations 10 CFR 50.55a and applicable plant Technical Specifications (TS). Requests for reliet were submitted for those portions of the ASME Code which you deemed impractical to perform at the Perry facility.

The NRC staff, with assistance from our contractor, Idaho National Engineering Laboratory, has completed a review of your submittals. The details of the staff's review are contained in the enclosed Safety Evaluation (SE). The details of our contractor's review are contained in the Technical Evaluation Report (TER) attached to the Safety Evaluation.

Based upon our review, we have determined that the Perry Nuclear Power Plant Unit No. I first 10-year Interval Inservice Inspection Program is in compliance with the above cited requirements. We have also determined that certain Section XI ASME Code requirements you have identified are impractical to perform at the Perry Nuclear Power Plant Unit No. 1 and therefore relief from these requirements is granted. A summary of the requirements and our bases for granting the reliets are contained in the enclosed SE and attached TER.

We have determined that, pursuant to 10 CFR 50.55a(g)(6)(i), granting the i

reliefs as discussed above is authorized by law and will not endanger life

?8P 1885 $0Sho

/f/l 9

I i

x 3

i t'

Mr. Alvin Kaplan

-2 April 25, 1990 or property or the common defense and security. We have also concluded that

- granting the reliefs is otherwise in the public interest considering the burden that could result if the requirements were imposed on the facility.

Sincerely,

/s/

John N. Hannon, Director Project Directorate 111 Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

Safety Evaluation with attached TER cc See next page DOCUMENT NAME: 61443 ISI

  • SEE PREVIOUS CONCURRENCE h

Officer LA/PDU I-3 PM/PDill-3 OGC

/P 111 Surname:

PKriktWr'

  • TColburn/tg MYoung
1Hannon if/p/90_

03/13/90 03/29/90

  • [/g/90, Date:

i

-. +..

1 l

Mr. Alv'in Kaplan Perry Nuclear Power Plant The Cleveland Electric Unit 1 l

Illuminating Company l

l cc: Jay E. Silberg, Esq.

Mr. James W. Harris, Director Shaw, Pittman, Potts & Trowbridge Division of Power Generation 2300 N Street, N.W.

Ohio Department of Industrial Washington, D.C.

20037 Relations P. O. Box 825 David E. Burke Columbus, Ohio 43216 f

^

The Cleveland Electric 111uminating Company The Honorable Lawrence Logan P.O. Box 5000 Mayor, Village of Perry Cleveland, Ohio 44101 4203 Harper Street i

Perry, Ohio 44081 Resident inspector's Office U.S. Nuclear Regulatory Commission The Honorable Robert V. Orosz Parmly at Center Road Mayor, Village of North Perry Perry. Ohio 44081 North Perry Vt11 age Hall 4778 Lockwood Road Regional Administrator, Region III North Perry Village, Ohio 44081 U.S. Nuclear Reaulatory Commission 799 Roosevelt Road Attorney General Glen Ellyn, Illinois 60137 Department of Attorney General 30 East Broad Street Frank P. Weiss, Esq.

Columbus, Ohio 43216 l

Assistant Prosecuting Attorney 105 Main Street Radiological Health Program Lake County Administration Center Ohio Department of. Health Painesville, Ohio 44077 1224 Kinnear Road Columbus, Ohio 43212 Ms. Sue Hiatt i

OCRE Interim Representative Ohio Environmental Protection 8275 Munson Agency Hentor, Ohio 44060 DERR--Compliance Unit P0 30x 1049 Terry J. Lodge, Esq.

1800 Watermark Drive 618 N. Michigan Street ATTN: Zack A. Clayton Suite 105 Columbus, Ohio 43266-0149 Toledo, Ohio 43624 Mr. Phillip S. Haskell, Chairman John G. Cardinal, Esq.

Perry Township Board of Trustees Prosecuting Attorney Box 65 Ashtabula County Courthouse 4171 Main Street Jefferson, Ohio 44047 Perry, Ohio 44081 Robert A. Newkirk State of Ohio Cleveland Electric Public Utilities Commission Illuminating Company 180 East Broad Street-Perry Nuclear Power Plant Columbus, Ohio 43266-0573 P. O. Box 97 E-210 Perry, Ohio 44081 Michael D. Lyster j

Cleveland Electric j

Illuminating Company l

Perry Nuclear Power Plant i